Tonight, November 20through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

The following lanes and ramps are scheduled to be CLOSED:            

Daytime Work (7:30 AM – 3:30 PM) 

Monday, November 25

  • #1 lane from 10th St. to Riverside Blvd. onramp at X St.
  • Eastbound Riverside Blvd. onramp inside lane

Tuesday, November 26

  • #1 lane from 8th to 9th St. at X St.
  • Eastbound 16th St. onramp inside lane

Wednesday, November 27

  • #1 lane from 6th to 9th St. on W St.

Nighttime Work (9 PM – 5 AM) 

Thursday, November 21

  • Eastbound Hornet Dr. offramp
  • Hornet Dr. near the US-50 project area
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St.
  • Westbound Howe Ave. on- and offramps
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. offramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

Friday, November 22

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St.
  • Westbound Howe Ave. on- and offramps
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. offramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

November 19, 2024       

Tonight, November 19through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

The following lanes and ramps are scheduled to be CLOSED:            

Daytime Work (7:30 AM – 3:30 PM) 

Thursday, November 21

  • #1 lane from 8th St. to 9th St. at X St.
  • Eastbound 16th St. onramp inside lane

Nighttime Work (9 PM – 5 AM) 

Tuesday, November 19

  • Westbound 16th St. offramp
  • Connector from SR-51 to westbound US-50 + auxiliary lane to 16th St.
  • Connector from northbound SR-99 to westbound US-50
  • Connector from southbound SR-99 to westbound US-50
  • Auxiliary lane from northbound I-5 to 15th St.
  • Westbound 65th St. offramp
  • Westbound 34th St. near the US-50 project area
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St.
  • Westbound Howe Ave. on- and offramps
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. offramp

Wednesday, November 20 – Thursday, November 21

  • Hornet Dr. near the US-50 project area

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

November 18, 2024       

Tonight, November 18through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

The following lanes and ramps are scheduled to be CLOSED:            

Daytime Work (7:30 AM – 3:30 PM) 

Tuesday, November 19

  • #1 lane from 24th St. to 27th St. at X St.

Wednesday, November 20

  • #1 lane from 10th St. to Riverside Blvd. onramp at X St.
  • Eastbound Riverside onramp inside lane

Thursday, November 21

  • #1 lane from 8th St. to 10th St. at X St.
  • Eastbound 16th St. onramp inside lane

Friday, November 22

  • #1 lane from 6th St. to 9th St. at W St.

Nighttime Work (9 PM – 5 AM) 

Monday, November 18

  • Connector from northbound SR-99 to westbound US-50
  • Connector from SB-51 to westbound US-50 + 16th St. auxiliary lane
  • Westbound 16th St. offramp
  • #1 lane from 9th St. to Riverside Blvd. at X St.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St. offramp
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. offramp
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • Eastbound and westbound #3 and #4 lanes from Occidental Dr. overcrossing to Watt Ave.
  • Westbound Watt Ave. onramp
  • T St. near the US-50 project area
  • 34th St. near the US-50 project area

Tuesday, November 19

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St. offramp
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • 34th St. near the US-50 project area
  • Eastbound 16th St. onramp
  • Eastbound 15th St. offramp

Wednesday, November 20 – Thursday, November 21

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St. offramp
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • Hornet Dr. near the US-50 project area
  • Eastbound #1 and #2 lanes from 8th St. to 26th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.

Friday, November 22

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 65th St. offramp
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • Eastbound 16th St. onramp
  • Eastbound 15th St. offramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

November 15, 2024       

Tonight, November 15through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

The following lanes and ramps are scheduled to be CLOSED:                  

Nighttime Work (9 PM – 5 AM) 

Friday, November 15

  • #2 lane on the westbound US-50 to Northbound I-5 connector ramp
  • Westbound 5th Street to northbound I-5 onramp
  • Westbound #3 and #4 lanes from Bradshaw overcrossing to Watt overcrossing
  • Westbound Watt Ave. offramp
  • Eastbound #3 and #4 lanes from Occidental overcrossing to Watt Ave. onramp
  • #2 lane on the eastbound Watt Ave. offramp
  • Eastbound #1 and #2 lanes from 6th Street to 26th Street
  • Westbound #1 and #2 lanes from 26th Street to 6th Street
  • Eastbound #3 and #4 lanes from 48th Street overcrossing to 59th Street overcrossing
  • Eastbound 59th Street offramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

November 14, 2024       

Tonight, November 14through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

ALERT: As of 11/06/2024, the long-term closure of westbound US-50 at 65th Street has been POSTPONED. Work will be rescheduled to a future date, to be determined. 

The following lanes and ramps are also scheduled to be CLOSED this week:                  

Nighttime Work (9 PM – 5 AM) 

Thursday, November 14

  • Westbound Watt Ave. on and offramps
  • Westbound #3 and #4 lanes from Bradshaw to Occidental overcrossing
  • Eastbound #3 and #4 lanes from the Occidental overcrossing to Watt Ave. onramp
  • Eastbound Watt Ave. offramp (#2 lane)
  • Westbound #4 and auxiliary lanes under Occidental overcrossing
  • Eastbound #3 and #4 lanes from 48th Street overcrossing to 59th Street offramp
  • Eastbound 59th Street offramp
  • T Street under US-50
  • Eastbound #1 and #2 lanes from 6th Street to 26th Street
  • Westbound #1 and #2 lanes from 26th Street to 6th Street
  • Westbound 16th Street offramp
  • Connector ramp from SB-51 (Bus. I-80) to westbound US-50
  • Connector ramp from northbound SR-99 to westbound US-50
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #3 and #4 lanes from Howe Ave. to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound 65th Street offramp
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

Friday, November 15

  • Eastbound #1 and #2 lanes from 6th Street to 26th Street
  • Westbound #1 and #2 lanes from 26th Street to 6th Street

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

 

November 13, 2024       

Tonight, November 13through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

ALERT: As of 11/06/2024, the long-term closure of westbound US-50 at 65th Street has been POSTPONED. Work will be rescheduled to a future date, to be determined. 

The following lanes and ramps are also scheduled to be CLOSED this week:                  

Nighttime Work (9 PM – 5 AM)                   

Wednesday, November 13

  • Eastbound #3 and #4 lanes from Howe Ave. to Occidental Dr.
  • Eastbound Howe Ave. onramp
  • Westbound #3 and #4 lanes from the Bradshaw overcrossing to the Watt Ave. overcrossing
  • Westbound Watt Ave. offramp and #2 lane
  • Westbound #3 and #4 lanes from 39th St. to 26th St.
  • Westbound Stockton Blvd. offramp
  • Eastbound #3 and #4 lanes from the Occidental Dr. overcrossing to the Watt Ave. onramp
  • T St. near the US-50 area
  • Eastbound #1 and #2 lanes from 6th St. to 26th St.
  • Westbound 16th St. offramp
  • Connector from SB-51 to westbound US-50 + auxiliary lane to 16th St.
  • Connector from northbound SR-99 to westbound US-50
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound Howe. Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

Thursday, November 14

  • Eastbound #3 and #4 lanes from the 48th St. overcrossing to the 59th St. offramp
  • Eastbound 59th St. offramp
  • T St. near the US-50 project area
  • Eastbound and westbound #1 and #2 lanes from 6th St. to 26th St.
  • Connector from northbound SR-99 to westbound US-50
  • Connector from SB-51 to westbound US-50
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

Friday, November 15

  • Eastbound and westbound #1 and #2 lanes from 6th St. to 26th St.
  • Connector from northbound SR-99 to westbound US-50
  • Connector from SB-51 to westbound US-50
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

 

November 12, 2024       

Tonight, November 12through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

ALERT: As of 11/06/2024, the long-term closure of westbound US-50 at 65th Street has been POSTPONED. Work will be rescheduled to a future date, to be determined. 

The following lanes and ramps are also scheduled to be CLOSED this week:                  

Nighttime Work (9 PM – 5 AM)                   

Tuesday, November 12

  • Westbound 59th St. onramp
  • Eastbound 59th St. offramp
  • Eastbound 65th St. onramp, #3 and #4 lanes
  • Eastbound Watt Ave. offramp, #3 and #4 lanes
  • Stockton Blvd. southbound lane near the US-50 area
  • T St. near the US-50 area
  • Westbound and eastbound #1 and #2 lanes from 6th St. to 26th St.
  • Westbound 16th St. offramp
  • Connector from SB-51 to westbound US-50 + auxiliary lane to 16th St.
  • Connector from northbound SR-99 to westbound US-50
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound Howe. Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

Wednesday, November 13

  • T St. near the US-50 area
  • Westbound and eastbound #1 and #2 lanes from 6th St. to 26th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound Howe. Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • Connector from northbound SR-99 to westbound US-50
  • Connector from SB-51 to westbound US-50

Thursday, November 14

  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.
  • T St. near the US-50 area
  • Westbound and eastbound #1 and #2 lanes from 6th St. to 26th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound Howe. Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • Connector from northbound SR-99 to westbound US-50
  • Connector from SB-51 to westbound US-50

Friday, November 15

  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.
  • Westbound and eastbound #1 and #2 lanes from 6th St. to 26th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound Howe. Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.
  • Eastbound Watt Ave. offramp
  • Connector from northbound SR-99 to westbound US-50
  • Connector from SB-51 to westbound US-50

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

November 8, 2024       

Tonight, November 8through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

ALERT: As of 11/06/2024, the long-term closure of westbound US-50 at 65th Street has been POSTPONED. Work will be rescheduled to a future date, to be determined. 

The following lanes and ramps are also scheduled to be CLOSED this week:                  

Daytime Work (9 AM – 12 PM)                   

Monday, October 11 

  • 8th St. near the US-50 project area 
  • 9th St. near the US-50 project area 

Nighttime Work (9 PM – 5 AM)                   

Friday, November 8  

  • Northbound I-5 through Eastbound US-50 
  • Southbound I-5 through Eastbound US-50 
  • Eastbound #3 and #4 lanes from Jefferson Blvd. To 19th St. 
  • Eastbound 15th St. offramp  
  • Eastbound Riverside onramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps   

Thursday, November 9 

  • Eastbound #3 and #4 lanes from Jefferson Blvd. To 19th St. 
  • Eastbound 15th St. offramp  
  • Eastbound Riverside onramp 

Sunday, November 10 

  • Westbound 16th St. Offramp 
  • Southbound US-51 St. through Westbound US-50 connector and auxiliary lanes to 16th St 
  • Northbound US-99 through Westbound US-50 connector 
  • Eastbound #1 and #2 lanes from Jefferson Blvd. To 15th St. 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. Through 59th St. 
  • Westbound Howe Ave onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps   

Monday, November 11 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. Through 59th St. 
  • Westbound Howe Ave onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

November 6, 2024      

Tonight, November 6through the end of the week, construction is scheduled to continue along US-50 in Sacramento.      

ALERT: As of 11/06/2024, the long-term closure of westbound US-50 at 65th Street has been POSTPONED. Work will be rescheduled to a future date, to be determined.

The following lanes and ramps are also scheduled to be CLOSED this week:                 

Daytime Work (9 AM – 12 PM)                  

Thursday, October 7

  • 9th St. near the US-50 project area

Nighttime Work (9 PM – 5 AM)                  

Wednesday, November 6  

  • Westbound 16th St. offramp
  • Connector from SB-51 to westbound US-50 + auxiliary lane to 16th. St.
  • Eastbound #4 lane from Stockton Blvd. to 59th St.
  • Eastbound #3 and #4 lanes from Jefferson Blvd. to 5th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  
  • Eastbound #3 and #4 lanes from Occidential Dr. to Watt Ave.

Thursday, November 7 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  
  • Northbound Stockton Blvd. lane under US-50 
  • Southbound 34th St. lane under US-50 

Friday, November 8 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave. 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

November 5, 2024      

Tonight, November 5through the end of the week, construction is scheduled to continue along US-50 in Sacramento.      

ALERT: Expect the southbound 65th Street onramp towards westbound US-50 to be CLOSED between Tuesday, November 5 at 9 PM through Tuesday, November 13 at 5 AM. For suggested detours and more information, click HERE. 

The following lanes and ramps are also scheduled to be CLOSED this week:                 

Daytime Work (9 AM – 12 PM)                  

Wednesday, October 6 

  • 26th St. offramp from #2 lane on W St. 

Nighttime Work (9 PM – 5 AM)                  

Tuesday, November 5 

  • Connector from northbound SR-99 to westbound US-50 
  • Connector from westbound US-50 to southbound SR-99 
  • Westbound 16th St. offramp 
  • Connector from SB-51 to westbound US-50 with auxiliary lane to 16th St. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  
  • Eastbound #3 and #4 lanes from Occidental Dr. to Watt Ave. 
  • Eastbound Howe Ave. onramp  

Wednesday, November 6  

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  

Thursday, November 7 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  
  • Northbound Stockton Blvd. lane under US-50 
  • Southbound 34th St. lane under US-50 

Friday, November 8 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps  
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave. 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

November 4, 2024     

Tonight, November 4through the end of the week, construction is scheduled to continue along US-50 in Sacramento.     

ALERT: Expect the southbound 65th Street onramp towards westbound US-50 to be CLOSED between Tuesday, November 5 at 9 PM through Tuesday, November 13 at 5 AM. For suggested detours and more information, click HERE.

The following lanes and ramps are also scheduled to be CLOSED this week:                

Daytime Work (9 AM – 12 PM)                 

Wednesday, October 6

  • 26th St. offramp from #2 lane on W St.

Nighttime Work (9 PM – 5 AM)                 

Monday, November 4 

  • Connector from northbound SR-99 to westbound US-50
  • Connector from westbound US-50 to southbound SR-99
  • Westbound 16th St. offramp
  • Connector from SB-51 to westbound US-50 with auxiliary lane to 16th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #3 and #4 lanes from Occidental Dr. to Watt Ave.

Tuesday, November 5 – Wednesday, November 6

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 

Thursday, November 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Northbound Stockton Blvd. lane under US-50
  • Southbound 34th St. lane under US-50

Friday, November 8

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

November 1, 2024     

Tonight, November 1through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                   

The following lanes and ramps are also scheduled to be CLOSED this week:                

Nighttime Work (9 PM – 5 AM)                 

Friday, October 1 

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 

Sunday, October 3 

  • Westbound 16th St. offramp 
  • Connector from SB-51 to westbound US-50 + auxiliary lane to 16th St. 
  • Westbound 65th onramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Westbound 59th St. onramp 
  • Eastbound Howe Ave. onramp 
  • Eastbound #3 and #4 Occidental Dr. through Watt Ave. 

Monday, October 4 

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Westbound 59th St. Onramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. Through 26th St.  
  • Westbound 65th St. onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

October 31, 2024     

Tonight, October 31through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                   

The following lanes and ramps are also scheduled to be CLOSED this week:                

Nighttime Work (9 PM – 5 AM)                 

Thursday, October 31 

  • Westbound 16th St. offramp 
  • Connector from SB-51 to westbound US-50 + auxiliary lane to 16th St. 
  • Eastbound 16th St. onramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Westbound 59th St. Onramp 
  • Westbound Watt Ave. onramp 

Friday, October 1 

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

October 30, 2024    

Tonight, October 30through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                  

The following lanes and ramps are also scheduled to be CLOSED this week:               

Nighttime Work (9 PM – 5 AM)                

Wednesday, October 30

  • Westbound 16th St. offramp
  • Connector from SB-51 to westbound US-50 + auxiliary lane to 16th St.
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound 59th St. onramp

Thursday, October 31

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound Watt Ave. onramp

Friday, November 1

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 29, 2024    

Tonight, October 29through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                  

The following lanes and ramps are also scheduled to be CLOSED this week:               

Nighttime Work (9 PM – 5 AM)                

Tuesday, October 29

  • Eastbound Riverside Blvd. onramp
  • Connector from SB-51 to westbound US-50
  • Westbound Howe Ave. onramp
  • Connector from northbound SR-99 to westbound US-50
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound Watt Ave. onramp
  • 34th St. near the US-50 project area
  • Connector from westbound US-50 to I-5 North/South
  • Westbound 10th St. offramp
  • Westbound 16th St. offramp

Wednesday, October 30

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound Watt Ave. onramp

Thursday, October 31

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Connector from North/South I-5 to eastbound US-50
  • Eastbound #3 and #4 lanes from Jefferson Blvd. to 16th St.
  • Eastbound 15th St. offramp
  • Eastbound Riverside Blvd. onramp

Friday, November 1

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 28, 2024    

Tonight, October 28through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                  

The following lanes and ramps are also scheduled to be CLOSED this week:               

Nighttime Work (9 PM – 5 AM)                

Monday, October 28 

  • Connector from northbound SR-99 to westbound US-50
  • Eastbound Riverside Blvd. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound Watt Ave. onramp
  • 34th St. near the US-50 project area

Tuesday, October 29

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound Watt Ave. onramp
  • 34th St. near the US-50 project area
  • Connector from westbound US-50 to I-5 North/South
  • Westbound 10th St. offramp
  • Westbound 16th St. offramp

Wednesday, October 30

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • 34th St. near the US-50 project area

Thursday, October 31

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • 34th St. near the US-50 project area
  • Connector from North/South I-5 to eastbound US-50
  • Eastbound #3 and #4 lanes from Jefferson Blvd. to 16th St.
  • Eastbound Riverside Blvd. onramp

Friday, November 1

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 25, 2024    

Tonight, October 25through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                  

NOTICE: A 55-hour closure is scheduled to take place from Friday, October 25 at 10 PM through Monday, October 28 at 5 AM at the northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50. For details on official Caltrans recommended detours, click here. 

The following lanes and ramps are also scheduled to be CLOSED this week:               

Nighttime Work (9 PM – 5 AM)                

Friday, October 25 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Connector from northbound SR-99 to westbound US-50  
  • Eastbound 59th St. Offramp 
  • Eastbound 15th St. offramp and auxiliary lane 
  • Connector from westbound US-50 to southbound SR-99 
  • Westbound #3, #4, and auxiliary lanes from Stockton Blvd. through 26th St.   
  • #1 lane connector Southbound 51 St. 

Saturday, October 26 

  • Connector from northbound SR-99 to westbound US-50 
  • Westbound #3 and #4 lanes from Stockton Blvd. Through 26th St. 
  • #1 lane connector Southbound 51 St. 
  • Eastbound 59th St. Offramp 

Sunday, October 27 

  • Connector from northbound SR-99 to westbound US-50 
  • Westbound #3 and #4 lanes from Stockton Blvd. Through 26th St. 
  • #1 lane connector Southbound 51 St. 
  • Eastbound 59th St. Offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St. 
  • Westbound Howe Ave. Onramp 
  • Westbound Hornet Dr. Onramp 
  • Westbound 65th St. off- and onramp 
  • Westbound Watt Ave. onramp 
  • T St. near the US-50 project area  

Monday, October 28 

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St. 
  • Westbound Howe Ave. Onramp 
  • Westbound Hornet Dr. Onramp 
  • Westbound 65th St. off- and onramp 
  • Westbound Watt Ave. Onramp 
  • Eastbound 16th St. onramp 
  • T St. near the US-50 project area 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 24, 2024    

Tonight, October 24through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                  

NOTICE: A 55-hour closure is scheduled to take place from Friday, October 25 at 10 PM through Monday, October 28 at 5 AM at the northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50. For details on official Caltrans recommended detours, click here. 

The following lanes and ramps are also scheduled to be CLOSED this week:               

Nighttime Work (9 PM – 5 AM)                

Thursday, October 24 

  • Connector from northbound SR-99 to westbound US-50 
  • Westbound right lane from Folsom Blvd. to State University Ave. 
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St. 
  • Connector from westbound US-50 to southbound SR-99 
  • Westbound #3 and #4 lanes from 59th St. to Stockton Blvd. 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound Hornet Dr. off. offramp   
  • Hornet Blvd. City street closure 

Friday, October 25 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Connector from northbound SR-99 to westbound US-50  
  • Eastbound 59th St. Offramp 
  • Eastbound 15th St. offramp and auxiliary lane 
  • Connector from westbound US-50 to southbound SR-99 

Friday, October 25 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramp   
  • Connector from northbound SR-99 to westbound US-50 
  • Eastbound 59th St. offramp 
  • Eastbound 15th St. offramp and auxiliary lane 

Saturday, October 26 

  • Connector from northbound SR-99 to westbound US-50 
  • Eastbound 59th St. Offramp 

Sunday, October 27 

  • Connector from northbound SR-99 to westbound US-50 
  • Eastbound 59th St. Offramp 
  • Westbound Watt Ave. onramp 
  • Westbound #3 and #4 lanes from 65th St. through 59th St. 
  • T St. near the US-50 project area  

Monday, October 28 

  • Westbound Watt Ave. onramp 
  • Westbound #3 and #4 lanes from 65th St. through 59th St. 
  • T St. near the US-50 project area  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

October 23, 2024   

Tonight, October 23through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                 

NOTICE: A 55-hour closure is scheduled to take place from Friday, October 25 at 10 PM through Monday, October 28 at 5 AM at the northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50. For details on official Caltrans recommended detours, click here.

The following lanes and ramps are also scheduled to be CLOSED this week:              

Nighttime Work (9 PM – 5 AM)               

Wednesday, October 23

  • Connector from northbound SR-99 to westbound US-50
  • Westbound right lane from Folsom Blvd. to State University Ave.
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.
  • Connector from westbound US-50 to southbound SR-99
  • Westbound #3 and #4 lanes from 59th St. to Stockton Blvd.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

Thursday, October 24

  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.
  • Connector from westbound US-50 to southbound SR-99
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

Friday, October 25

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Connector from northbound SR-99 to westbound US-50
  • Eastbound 59th St. offramp
  • Eastbound 15th St. offramp and auxiliary lane

Saturday, October 26 – Sunday, October 27

  • Connector from northbound SR-99 to westbound US-50
  • Eastbound 59th St. offramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 22, 2024   

Tonight, October 22through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                 

NOTICE: A 55-hour closure is scheduled to take place from Friday, October 25 at 10 PM through Monday, October 28 at 5 AM at the northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50. For details on official Caltrans recommended detours, click here.

The following lanes and ramps are also scheduled to be CLOSED this week:              

Nighttime Work (9 PM – 5 AM)               

Tuesday, October 22

  • Connector from northbound SR-99 to westbound US-50
  • Eastbound 15th St. offramp and auxiliary lane
  • Westbound right lane from Folsom Blvd. to State University Ave.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • 34th St. near the US-50 project area 

Wednesday, October 23 – Thursday, October 24

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.
  • Connector from westbound US-50 to southbound SR-99

Friday, October 25

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • Connector from northbound SR-99 to westbound US-50

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 21, 2024   

Tonight, October 21through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                 

NOTICE: A 55-hour closure is scheduled to take place from Friday, October 25 at 10 PM through Monday, October 28 at 5 AM at the northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50. For details on official Caltrans recommended detours, click here.             

The following lanes and ramps are scheduled to be CLOSED this week:              

Nighttime Work (9 PM – 5 AM)               

Monday, October 21  

  • Connector from Westbound US-50 to Northbound I-5
  • Westbound 15th St. onramp
  • Westbound #5 and auxiliary lanes from the 15th St. onramp to the WB US-50/NB I-5 connector
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 
  • Connector from NB-99 to Westbound US-50
  • Westbound Howe Ave. offramp
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • 34th St. near the US-50 project area 

Tuesday, October 22

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • 34th St. near the US-50 project area 

Wednesday, October 23 – Thursday, October 24

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.
  • Connector from WB US-50 to SB-99

Friday, October 25

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp 
  • Connector from NB-99 to WB US-50

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 18, 2024   

Tonight, October 18through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                 

The following lanes and ramps are scheduled to be CLOSED this week:              

Nighttime Work (9 PM – 5 AM)               

Friday, October 18 

  • Eastbound #3 and #4 lanes from Stockton Blvd. to 59th St. 
  • Eastbound #3 and #4 lane from 59th St. through 65th St.   

Sunday, October 20 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. Through Watt Ave.  
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. Offramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. Through 26th St. 
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 
  • T St. near the US-50 project area 

Monday, October 21  

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound #4 and auxiliary lanes from Howe Ave. Through Watt Ave.  
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. Offramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. Through 26th St. 
  • Westbound 15th St. onramp 
  • Westbound #5 and auxiliary lanes from 15th St. onramp through WB US-50 to  NB-99 
  • 34th St. near the US-50 project area 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 17, 2024   

Tonight, October 17through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                 

The following lanes and ramps are scheduled to be CLOSED this week:              

Nighttime Work (9 PM – 5 AM)               

Thursday, October 17 

  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp  
  • Eastbound #3 and #4 lanes from Stockton Blvd. to 59th St. 
  • Eastbound #3 and #4 lane from 59th St. through 65th St.   
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramp  
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. offramp 
  • Connector from NB-99 to WB US-50 
  • T St. near the US-50 project area 

Friday, October 18 

  • Eastbound #3 and #4 lanes from Stockton Blvd. to 59th St. 
  • Eastbound #3 and #4 lane from 59th St. through 65th St.   

Sunday, October 20  

  • T St. near the US-50 project area 

Monday, October 21  

  • 34th St. near the US-50 project area 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

October 16, 2024  

Tonight, October 16through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                

The following lanes and ramps are scheduled to be CLOSED this week:             

Nighttime Work (9 PM – 5 AM)              

Wednesday, October 16

  • Eastbound #4 lane from Stockton Blvd. to 59th St.
  • Eastbound #4 lane from 59th St. through 65th St.  
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. offramp
  • Connector from NB-99 to WB US-50
  • Westbound #4 lanes from Stockton Blvd. to Alhambra
  • Eastbound right lane on Folsom Blvd. from Ramona Ave. to State University Dr.
  • T St. near the US-50 project area
  • Westbound 15th St. onramp
  • Connector from NB I-5 to WB US-50 

Thursday, October 17

  • Eastbound #4 lane from Stockton Blvd. to 59th St.
  • Eastbound #4 lane from 59th St. through 65th St.  
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. offramp
  • T St. near the US-50 project area 

Friday, October 18 

  • Eastbound #4 lane from Stockton Blvd. to 59th St.
  • Eastbound #4 lane from 59th St. through 65th St.  
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

October 15, 2024  

Tonight, October 15through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                

The following lanes and ramps are scheduled to be CLOSED this week:             

Nighttime Work (9 PM – 5 AM)              

Tuesday, October 15 

  • Eastbound 65th St. offramp
  • Eastbound #4 lane from 59th St. through 65th St.  
  • Connector from NB-99 to WB US-50
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound Howe Ave. onramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. to Alhambra
  • Eastbound right lane on Folsom Blvd. from Ramona Avenue to State University Drive.
  • T St. near the US-50 project area 

Wednesday, October 16 – Thursday, October 17 

  • Eastbound 65th St. offramp
  • Eastbound #4 lane from 59th St. through 65th St.  
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound Howe Ave. onramp 
  • T St. near the US-50 project area 

Friday, October 18 

  • Eastbound 65th St. offramp
  • Eastbound #4 lane from 59th St. through 65th St.  
  • T St. near the US-50 project area 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

October 14, 2024  

Tonight, October 14through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                

The following lanes and ramps are scheduled to be CLOSED this week:             

Nighttime Work (9 PM – 5 AM)              

Monday, October 14 

  • Eastbound #3 and 4 lanes from Stockton through 59th St.  
  • Eastbound #3 and 4 lanes from 59th St. through 65th St.  
  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  
  • Eastbound Howe Ave. Onramp 
  • Westbound connector from Westbound US-50 to NB-99 
  • Westbound #2, #3, and #4 lanes from Stockton Blvd. Through Alhambra Dr. 
  • Eastbound X St. onramp 
  • Eastbound 34th St. offramp 
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 
  • T St. near the US-50 project area 

Tuesday, October 15 

  • Eastbound #3 and 4 lanes from Stockton through 59th St.  
  • Eastbound #3 and 4 lanes from 59th St. through 65th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  
  • Eastbound Howe Ave. Onramp 
  • T St. near the US-50 project area 

Wednesday, October 16 – Thursday, October 17 

  • Eastbound #3 and 4 lanes from 59th St. through 65th St.  
  • Eastbound #1 and #2 from 26th St. through Stockton Blvd.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  
  • Eastbound Howe Ave. Onramp 
  • T St. near the US-50 project area 

Friday, October 18 

  • Eastbound #3 and 4 lanes from 59th St. through 65th St.  
  • Eastbound #1 and #2 from 26th St. through Stockton Blvd.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

October 11, 2024  

Tonight, October 11through the end of the week, construction is scheduled to continue along US-50 in Sacramento.     

REMINDER: The northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50 (US-50) is scheduled to be CLOSED from Friday, October 11 at 9 p.m. through Monday, October 14 at 5 a.m.       

Suggested Detours

Local motorists:

  • For northbound SR-99 to westbound US-50. Motorists can take eastbound US-50 to 65th Street, then exit and turn around to westbound US-50.
  • Or continue eastbound Business 80/SR-51 to N Street, then exit and turn around to westbound Business 80/SR-51 and take the connector ramp to Westbound US-50.

Out of area motorists on SR-99 that want to get to westbound US-50 or Interstate 5 (I-5): Use I-5 instead of SR-99.  

The following lanes and ramps are scheduled to be CLOSED this week:             

Nighttime Work (9 PM – 5 AM)              

Friday, October 11 

  • Eastbound #3 and 4 lanes from Stockton through 59th St.  
  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 from 26th St. to Camilla Ave. 
  • Westbound #1 lane at the SB-51 connector 
  • Northbound #3 lane on Howe Ave. 
  • Westbound Howe Ave. on- and offramp 
  • Eastbound #3 and #4 lanes from Stockton Blvd. through 59th St.  
  • Eastbound #3 and #4 lanes from 59th St. Through 65th St.  

Saturday, October 12  

  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 lanes from 26th St. to Camilia 
  • Westbound #1 lane at the SB-51 connector 
  • Westbound Hornet Dr. onramp 

Sunday, October 13 

  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 lanes from 26th St. to Camilia 
  • Westbound #1 lane at the SB-51 connector 
  • Eastbound #3 and #4 lanes from Stockton Blvd. through 59th St.  
  • Eastbound #3 and #4 lanes from 59th St. through 65th St. 
  • Westbound #3 and #4 lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound #4 and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. Onramp 
  • Eastbound #4 lane from 26th St. through 34th St. 
  • Eastbound X St. Onramp 
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 

Monday, October 14 

  • Westbound connector from NB-99 to Westbound US-50 
  • Eastbound #3 and #4 lanes from Stockton Blvd. through 59th St.  
  • Eastbound #3 and #4 lanes from 59th St. through 65th St. 
  • Westbound #3 and #4 lanes from Howe Ave. through 59th St.  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramp 
  • Eastbound #4 and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. Onramp 
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 
  • T St. near the US-50 project area 
  • 34th St. Near the US-50 project area 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

October 10, 2024  

Tonight, October 10through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                

REMINDER: The northbound State Route 99 (SR-99) connector to westbound U.S. Highway 50 (US-50) is scheduled to be CLOSED from Friday, October 11 at 9 p.m. through Monday, October 14 at 5 a.m.       

Suggested Detours

Local motorists:

  • For northbound SR-99 to westbound US-50. Motorists can take eastbound US-50 to 65th Street, then exit and turn around to westbound US-50.
  • Or continue eastbound Business 80/SR-51 to N Street, then exit and turn around to westbound Business 80/SR-51 and take the connector ramp to Westbound US-50.

Out of area motorists on SR-99 that want to get to westbound US-50 or Interstate 5 (I-5): Use I-5 instead of SR-99.  

          

Nighttime Work (9 PM – 5 AM)              

Thursday, October 10 

  • Eastbound 65th St. offramp 
  • Eastbound #3 and 4 lanes from 59th St. through 65th St. 
  • Westbound 15th St. onramp with auxiliary lanes through 8th St. 
  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound Stockton onramp 
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 
  • Westbound #1 and #2 lanes from Stockton Blvd. Through 26th St.  
  • Westbound #3 and 4 lanes from Howe Ave. to 59th St..  
  • Westbound Howe Ave. on- and offramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lanes from Howe Ave. Through Watt Ave. 
  • Eastbound Howe Ave onramp 
  • Northbound #3 lane on Howe Ave. 
  • Eastbound 16th St. onramp 

Friday, October 11 

  • Eastbound #3 and 4 lanes from Stockton through 59th St.  
  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 from 26th St. to Camilla Ave. 
  • Westbound #1 lane at the SB-51 connector 

Saturday, October 12 – Sunday, October 13 

  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 lanes from 26th St. to Camilia 
  • Westbound #1 lane at the SB-51 connector 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

October 9, 2024  

Tonight, October 9through the end of the week, construction is scheduled to continue along US-50 in Sacramento.                

The following lanes and ramps are scheduled to be CLOSED this week:             

Nighttime Work (9 PM – 5 AM)              

Wednesday, October 9 

  • Eastbound 65th St. offramp 
  • Eastbound #3 and 4 lanes from 59th St. to 65th St. 
  • Westbound connector from US-50 to NB-99  
  • Westbound #3 and 4 lanes from Stockton through 26th St. offramp 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Eastbound right lane on Folsom Blvd. from Ramona Ave to State University Dr. 
  • Westbound #3 and 4 lanes from Stockton Blvd. To Camilla Ave.  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Westbound connector from NB-99 to Westbound US-50 

Thursday, October 10 

  • Eastbound 65th St. offramp 
  • Eastbound #3 and 4 lanes from 59th St. through 65th St. 
  • Eastbound #1 and 2 from 26th St. from Stockton Blvd.  
  • Westbound #3 and 4 lanes from Howe Ave. to 59th St..  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound 16th St. onramp 

Friday, October 11 

  • Eastbound #3 and 4 lanes from Stockton through 59th St.  
  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 from 26th St. to Camilla Ave. 
  • Westbound #1 lane at the SB-51 connector 

Saturday, October 12 – Sunday, October 13 

  • Westbound connector from NB-99 to Westbound US-50 
  • Westbound #3 and 4 lanes from 26th St. to Camilia 
  • Westbound #1 lane at the SB-51 connector 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

October 8, 2024 

Tonight, October 8through the end of the week, construction is scheduled to continue along US-50 in Sacramento.               

The following lanes and ramps are scheduled to be CLOSED this week:            

Nighttime Work (9 PM – 5 AM)             

Tuesday, October 8

  • Eastbound 65th St. offramp
  • Eastbound #3 and 4 lanes from 59th St. to 65th St.
  • Westbound #1 and 2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and 2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Westbound connector from NB-99 to Westbound US-50

Wednesday, October 8

  • Eastbound 65th St. offramp
  • Eastbound #3 and 4 lanes from 59th St. to 65th St.
  • Westbound #1 and 2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Westbound connector from NB-99 to Westbound US-50

Thursday, October 9

  • Eastbound 65th St. offramp
  • Eastbound #3 and 4 lanes from 59th St. to 65th St.
  • Eastbound #1 and 2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound 16th St. onramp

Friday, October 11

  • Eastbound #3 and 4 lanes from Stockton Blvd. to 59th St.
  • Westbound connector from NB-99 to Westbound US-50
  • Westbound #3 and 4 lanes from 26th St. to Camilia
  • Westbound #1 lane at the SB-51 connector

Saturday, October 12 – Sunday, October 13

  • Eastbound #3 and 4 lanes from Stockton Blvd. to 59th St.
  • Westbound connector from NB-99 to Westbound US-50
  • Westbound #3 and 4 lanes from 26th St. to Camilia
  • Westbound #1 lane at the SB-51 connector

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

October 7, 2024 

Tonight, October 7through the end of the week, construction is scheduled to continue along US-50 in Sacramento.               

The following lanes and ramps are scheduled to be CLOSED this week:            

Nighttime Work (9 PM – 5 AM)             

Monday, October 7 

  • Eastbound #3 and 4 lanes from 26th St. to 34th St.
  • Eastbound 34th St. offramp
  • Eastbound X St. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Eastbound 59th St. offramp
  • Eastbound #3 and 4 lanes from Stockton Blvd. to 65th St.
  • Eastbound #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Westbound #1 and 2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Tuesday, October 8

  • Eastbound 59th St. offramp
  • Eastbound #3 and 4 lanes from 59th St. to 65th St.
  • Westbound #1 and 2 lanes from Stockton Blvd. to 26th St.
  • Westbound #1 and 2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Wednesday, October 8

  • Eastbound 59th St. offramp
  • Eastbound #3 and 4 lanes from Stockton Blvd. to 59th St.
  • Westbound #1 and 2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Westbound connector from NB-99 to Westbound US-50

Thursday, October 9

  • Eastbound 59th St. offramp
  • Eastbound #3 and 4 lanes from 59th St. to 65th St.
  • Eastbound #1 and 2 lanes from 26th St. to Stockton Blvd.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound 16th St. onramp

Friday, October 10

  • Eastbound 59th St. offramp
  • Eastbound #3 and 4 lanes from Stockton Blvd. to 59th St.
  • Westbound connector from NB-99 to Westbound US-50
  • Westbound #3 and 4 lanes from 26th St. to Camilia
  • Westbound #1 lane at the SB-51 connector

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

October 4, 2024 

Tonight, October 4through the end of the week, construction is scheduled to continue along US-50 in Sacramento.               

The following lanes and ramps are scheduled to be CLOSED this week:            

Daytime Work (7 AM – 5 PM)   

Friday, October 4 

  • 6th St. city street closure 

Nighttime Work (9 PM – 5 AM)             

Friday, October 4 

  • Westbound #1 and #2 lanes from Stockton Blvd. through 26th St.  
  • Eastbound #1 lane from 26th St. through Stockton Blvd. 
  • Eastbound #4 and auxiliary lanes from I-5 to 16th St. 
  • Eastbound 15th offramp 
  • Westound #1 and #2 lanes from Stockton Ave. through 26th St.  
  • Eastbound #1 and #2 lanes from 26th St. Through Stockton Blvd.  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound Howe Ave. Onramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Eastbound 15th St. offramp 

Saturday, October 5 

  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 

Sunday, October 6 

  • Westbound Stockton Blvd. offramp 
  • Eastbound 59th St. offramp  
  • Eastbound Stockton Blvd. onramp  
  • Eastbound #3 and #4 lanes from Stockton Blvd. through 59th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  
  • Eastbound Howe Ave. onramp 

Monday, October 7 

  • Eastbound 59th offramp 
  • Eastbound #3 and #4 lanes from Stockton Blvd. through 59th St. 
  • Westbound #1 and #2 from Stockton Blvd. through 26th St.  
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  
  • Eastbound Howe Ave. onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

October 3, 2024 

Tonight, October 3through the end of the week, construction is scheduled to continue along US-50 in Sacramento.               

The following lanes and ramps are scheduled to be CLOSED this week:            

Daytime Work (7 AM – 5 PM)   

Friday, October 4 

  • 6th St. city street closure 

Nighttime Work (9 PM – 5 AM)             

Thursday, October 3 

  • Westbound #1 and #2 lanes from Stockton Blvd. through 26th St.  
  • Eastbound #3 and #4 lanes from 26th St. through 34th St. 
  • Eastbound 34th St. offramp  
  • Eastbound X St. onramp 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave. 
  • Eastbound Howe Ave. Onramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Eastbound 15th St. offramp 

Friday, October 4 

  • Westbound #1 and #2 lanes from Stockton Blvd. through 26th St.  
  • Eastbound #1 lane from 26th St. through Stockton Blvd. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave. 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 

Saturday, October 5 

  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

October 2, 2024

Tonight, October 2through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Wednesday, October 2

  • Westbound #1 and #2 lanes from Stockton Blvd. through 26th St. 
  • Eastbound #3 and #4 lanes near the 5th St. offramp
  • Eastbound #2, 3 and 4 lanes from 26th St. to 34th St.
  • Eastbound 34th St. offramp
  • Eastbound X St. onramp
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Wednesday, October 2

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Connector from Northbound 99 to WB US-50
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Thursday, October 3

  • Westbound #1 and #2 lanes from Stockton Blvd. through 26th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Friday, October 4

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. through 26th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

October 1, 2024

Tonight, October 1through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Tuesday, October 1

  • Westbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Westbound Stockton Blvd. offramp
  • Eastbound #3 and #4 lanes near the 5th St. offramp
  • Eastbound #2, 3 and 4 lanes from 26th St. to 34th St.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Wednesday, October 2

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Connector from Northbound 99 to WB US-50
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Thursday, October 3

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Friday, October 4

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

 

September 30, 2024             

Tonight, September 30through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Monday, September 30

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Eastbound #3 and #4 lanes near the 5th St. offramp 
  • Eastbound #1, 2 and 3 lanes from 26th St. to 39th St.
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Tuesday, October 1

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Wednesday, October 2

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Connector from Northbound 99 to WB US-50
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Thursday, October 3

  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

Friday, October 4

  • #1 lane from SB-51 to the WB US-50 connector
  • Connector from Northbound 99 to WB US-50 (55-hour closure)
  • Westbound #3 and #4 lanes from 26th St. to Camilia
  • Connector from Southbound 99 to WB US-50
  • Westbound #3, 4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Eastbound #4 and auxiliary lanes from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 27, 2024             

Tonight, September 27through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Friday, September 27 

  • Eastbound 15th St. offramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Westbound Howe Ave. onramp 
  • Westbound 65th St. off- and onramp 
  • Eastbound 34th St. offramp 
  • Eastbound #3 and #4 lanes from 8th St. Through Stockton Blvd.  
  • Eastbound X St. onramp 

Saturday, September 28 

  • Eastbound #3 and #4 lanes from 26th St. Through 16th St. 
  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp  
  • Westbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 

Sunday, September 29 

  • Eastbound #3 and #4 lanes from 5th St. offramp 
  • Eastbound #1 and #2 lanes from Stockton Blvd. Through 26th St. 
  • Northbound 99 through Westbound 50 connector lanes 
  • Westbound #3 and #4 from 26th St.  through Camila St. 
  • Westbound 50 through Southbound 99 connector lanes 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St.  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet onramp 
  • Westbound 65th St. off- and onramp 
  • Eastbound #4 and auxiliary lanes from Howe Ave through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Westbound #1 and #2 lanes from Watt Ave. offramp through Watt Ave. onramp 

Monday, September 30 

  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St.  
  • Westbound Howe Ave. onramp 
  • Westbound Hornet onramp 
  • Westbound 65th St. off- and onramp 
  • Eastbound #4 and auxiliary lanes from Howe Ave through Watt Ave. 
  • Eastbound Howe Ave onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 26, 2024             

Tonight, September 26through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Thursday, September 26 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound #3 and #4 lanes from Stockton through 59th St. 
  • Eastbound 34th St. Offramp 
  • Eastbound #2, #3, #4 lanes from 26th St through Stockton Blvd. 
  • Eastbound X St. Onramp 
  • Eastbound Stockton Blvd. onramp 
  • Westbound Stockton Blvd. Offramp 
  • Westbound 50 through Southbound 99 connector ramp 
  • Westbound Howe Ave. onramp 
  • Eastbound Howe Ave. Onramp 
  • Westbound auxiliary lanes from Watt Ave to Howe Ave.  
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 
  • Westbound #3 and #4 lanes from Howe Ave. through 59th St.  
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  

Friday, September 27 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Westbound 65th St. onramp 
  • Eastbound 15th St. offramp  

Saturday, September 28 

  • Eastbound #3 and #4 lanes from 8th St. Through 16th St. 
  • Eastbound 16th onramp 
  • Eastbound 15th St. Offramp  
  • Westbound #1 and #2 lanes from Stockton through 26th St.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 25, 2024             

Tonight, September 25through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Wednesday, September 25 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound #3 and #4 lanes from Stockton Blvd. to 45th St.
  • Eastbound 34th St. offramp
  • Eastbound #2, #3 and #4 lanes from 26th St. to Stockton Blvd.
  • Eastbound X St. onramp
  • Eastbound Stockton Blvd. onramp
  • Eastbound #3 and #4 lanes from Stockton Blvd. and 59th St. 
  • Westbound US-50 to SB-99 connector
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. onramp

Thursday, September 26 – Friday, September 27

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound #3 and #4 lanes from Stockton Blvd. and 59th St. 
  • Westbound US-50 to SB-99 connector
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. onramp

Saturday, September 28

  • Westbound #3 and #4 lanes from 8th St. to 16th St.
  • Eastbound 16th St. onramp
  • Eastbound 15th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 24, 2024             

Tonight, September 24through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Tuesday, September 24 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound 34th St. Offramp 
  • Eastbound #2, #3, #4 lanes from 26th St through Stockton Blvd. 
  • Eastbound X St. onramp 
  • Westbound Stockton offramp 
  • Westbound Howe Ave. onramp 
  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp 
  • Westbound Hornet onramp 
  • Westbound 65th St. off- and onramp 
  • Westbound #3 and #4 lanes from Howe Ave. through 59th St.  
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  

Wednesday, September 25 – Thursday, September 26 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St. 
  • Westbound Howe onramp 
  • Westbound Hornet onramp  
  • Westbound 65th off- and onramp 
  • Eastbound #4 and auxiliary lane from Howe Ave. through Watt Ave.  
  • Eastbound Howe Ave. onramp 

Friday, September 27 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 23, 2024             

Tonight, September 23through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Monday, September 23 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound 34th St. Offramp 
  • Eastbound #2, #3, #4 lanes from 26th St through Stockton Blvd. 
  • Eastbound X St. onramp 
  • Westbound Howe Ave. off- and onramp 
  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp 
  • Eastbound Stockton onramp 
  • Westbound 65th St. onramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. through 59th St.  
  • Westbound Howe onramp 
  • Westbound Hornet onramp 
  • Westbound 65th St. off- and onramp 
  • Westbound #3 and #4 lanes from Howe Ave. through 59th St.  

Tuesday, September 24 – Thursday, September 26 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. through 59th St. 
  • Westbound Howe onramp 
  • Westbound Hornet onramp  
  • Westbound 65th off- and onramp 
  • Eastbound Howe Ave. onramp 

Friday, September 27 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.   

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 19, 2024             

Tonight, September 19through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:           

Nighttime Work (9 PM – 5 AM)            

Thursday, September 19 

  • Westbound and Eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound #1 and #2 from Stockton Blvd. through 26th St. 
  • Northbound 99 to Westbound US-50 connector  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.    
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th off- and onramps 
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave.  
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St.  
  • Eastbound Howe Ave. onramp  
  • Eastbound Watt Ave. offramp  
  • Westbound 15th St. onramp 
  • Westbound 15th St. onramp to Westbound 50 I-5 connector  

Friday, September 20 

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound #1 and #2 lanes from Stockton through 26th St. 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.    
  • Westbound Howe Ave. onramps  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th off- and onramps 

Saturday, September 21 

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.   
  • Eastbound #1 and #2 lanes from Stockton through 26th St. 

Sunday, September 22 

  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.    
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound 65th off- and onramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. Through 59th St.  
  • Eastbound Howe Ave. onramp  
  • Eastbound Watt Ave. offramp  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

September 18, 2024            

Tonight, September 18through the end of the week, construction is scheduled to continue along US-50 in Sacramento.             

The following lanes and ramps are scheduled to be CLOSED this week:          

Nighttime Work (9 PM – 5 AM)           

Wednesday, September 18

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.  
  • Northbound 99 to westbound US-50 connector
  • Eastbound 15th St. auxiliary lane and offramp 
  • Eastbound #1 and #2 from Stockton Blvd. through 39th St. 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th off- and onramps
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. offramp 
  • Eastbound 15th St. offramp  
  • Eastbound 16th St. onramp
  • Westbound 15th St. onramp
  • Westbound 15th St. onramp to Westbound 50 I-5 connector 

Thursday, September 19

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. on- and offramps 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th off- and onramps
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. offramp 
  • Eastbound 15th St. offramp  
  • Eastbound 16th St. onramp

Friday, September 20

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. on- and offramps 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th off- and onramps
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. offramp 
  • Eastbound 15th St. offramp  
  • Eastbound 16th St. onramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

September 17, 2024            

Tonight, September 17through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alerts:      

  • Starting September 13, through September 16, the Westbound 65th Street on-ramp will be CLOSED for pavement work.              

The following lanes and ramps are scheduled to be CLOSED this week:          

Nighttime Work (9 PM – 5 AM)           

Tuesday, September 17 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Eastbound#1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Southbound I-5 to Eastbound US-50 connector ramp, two right lanes closed 
  • Eastbound 15th St. auxiliary lane and offramp 
  • Westbound Stockton Blvd. Offramp 
  • Eastbound #1 and #2 from Stockton Blvd. Through 39th St. 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. Onramp 
  • Westbound 65th off- and onramp 
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. offramp 
  • Eastbound 16th St. offramp 
  • Westbound 15th St. onramp  
  • Westbound 15th St. onramp to Westbound 50 I-5 connector 

Wednesday, September 18- Thursday, September 19 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Eastbound#1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. Offramp 
  • Eastbound 15th St. offramp 
  • Eastbound 16th St. offramp 
  • Westbound 15th St. onramp  

Thursday, September 19 

  • Westbound Howe Ave. off- and onramp 

Friday, September 20 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Eastbound#1 and #2 lanes from Stockton Blvd. To 26th St.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

 

September 16, 2024            

Tonight, September 16through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alerts:      

  • Starting September 13, through September 16, the Westbound 65th Street on-ramp will be CLOSED for pavement work.              

The following lanes and ramps are scheduled to be CLOSED this week:          

Nighttime Work (9 PM – 5 AM)           

Monday, September 16 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Eastbound#1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Southbound I-5 to Eastbound US-50 connector ramp, two right lanes closed 
  • Eastbound 15th St. auxiliary lane and offramp 
  • Westbound Stockton Blvd. Offramp 
  • Westbound 65th off- and onramp 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. offramp 
  • Eastbound 16th St. offramp 
  • Westbound 15th St. onramp  

Tuesday, September 17- Thursday, September 19 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Eastbound#1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. through 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 
  • Eastbound #3, #4, and auxiliary lanes from Howe Ave. through Watt Ave. 
  • Eastbound Howe Ave. onramp 
  • Eastbound Watt Ave. Offramp 
  • Eastbound 15th St. offramp 
  • Eastbound 16th St. offramp 
  • Westbound 15th St. onramp  

Friday, September 20 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Eastbound#1 and #2 lanes from Stockton Blvd. To 26th St.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

September 9, 2024            

Tonight, September 9through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alerts:      

  • Starting September 6, through September 9, the Westbound Hornet Drive slip on-ramp and Westbound 65th Street off-ramp will be CLOSED for pavement work.              

The following lanes and ramps are scheduled to be CLOSED this week:          

Daytime Work (8:30 AM – 3:30 PM)   

Tuesday, September 10 

  • Northbound 26th St. lane and offramp 
  • Westbound 19th St. Shoulder lane   

Nighttime Work (9 PM – 5 AM)           

Monday, September 9 

  • Eastbound 16th St. onramp 
  • Eastbound Riverside onramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Southbound I-5 to Eastbound US-50 connector ramp, two right lanes closed 
  • Eastbound 15th St. offramp and auxiliary lane 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 
  • Folsom Blvd. City Street closure 

Tuesday, September 10 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 
  • Hornet Blvd. city street closure 
  • Eastbound Hornet Blvd. offramp 

Wednesday, September 11- Friday, September 13 

  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 

Saturday, September 14- Sunday, September 15  

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

September 6, 2024            

Tonight, September 6through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alerts:      

  • Starting September 6, through September 9, the Westbound Hornet Drive slip on-ramp and Westbound 65th Street off-ramp will be CLOSED for pavement work.              

The following lanes and ramps are scheduled to be CLOSED this week:          

Daytime Work (8:30 AM – 3:30 PM)   

Monday, September 9  

  • Eastbound Riverside #1 and onramp lane  

Nighttime Work (9 PM – 5 AM)           

Friday, September 6    

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp  

Saturday, September 7 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound #1 and #2 lanes from Stockton to 26th St.
  • Westbound 65th St. off- and onramp  

Sunday, September 8 

  • Eastbound 15th St. offramp 
  • Eastbound 16th St. onramp 
  • Southbound I-5 to Eastbound US-50 connector ramp, two right lanes closed 
  • Eastbound 15th St. offramp 
  • Eastbound #1 and #2 lanes from 26th St. Through 34th St.  
  • Westbound US-50 to the Southbound 99 connector 
  • Eastbound Folsom Blvd. from Ramona St. through State University Dr.   
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. Off- and onramp 
  • Westbound Howe Ave. onramp  
  • Folsom Blvd. full street closure 
  • Westbound #3 and #4 lanes from Howe Ave through 59th St.  

Monday, September 9 

  • Eastbound 16th St. onramp 
  • Eastbound Riverside onramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. To 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 
  • Eastbound Hornet Blvd. city street closure 
  • Eastbound Hornet Dr. offramp  
  • Eastbound Howe Ave. off- and onramp 
  • Eastbound #1 and #2 lanes from Occidental Dr. Through Watt Ave.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

  

September 5, 2024            

Tonight, September 5through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alerts:      

  • Starting September 6, through September 9, the Westbound Hornet Drive slip on-ramp and Westbound 65th Street off-ramp will be CLOSED for pavement work.              

The following lanes and ramps are scheduled to be CLOSED this week:          

Daytime Work (8:30 AM – 3:30 PM)   

Friday, September 6      

  • 20th St. Southbound lane near the US-50 project area   

Monday, September 9  

  • Southbound 26th St. lane  

Nighttime Work (9 PM – 5 AM)           

Thursday, September 5 

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Southbound I-5 to Eastbound US-50 connector ramp, two right lanes closed 
  • Eastbound #1, #2, and #3 lanes from 26th St. through 34 St.  
  • Westbound US-50 to the Southbound 99 connector  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp  
  • Westbound #1 and #2 lanes from 34th St. to 26th St. 

Friday, September 6    

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp  

Saturday, September 7 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp  

Sunday, September 8 

  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. offramp 
  • Folsom Blvd. full street closure 
  • Westbound #3 and #4 lanes from Howe Ave through 59th St.  

Monday, September 9 

  • Eastbound Hornet Blvd. street closure 
  • Eastbound Hornet Dr. offramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

September 4, 2024            

Tonight, September 4through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alerts:      

  • Starting September 6, through September 9, the Westbound Hornet Drive slip on-ramp and Westbound 65th Street off-ramp will be CLOSED for pavement work.              

The following lanes and ramps are scheduled to be CLOSED this week:          

Daytime Work (8:30 AM – 3:30 PM)   

Thursday, September 5    

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area    
  • Southbound lane on Folsom Blvd.  
  • West Shoulder at 19th St.  

Friday, September 6    

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area    
  • Southbound lane on Folsom Blvd.   
  • 20th St. Southbound lane near the US-50 project area   

Monday, September 9  

  • Southbound 26th St. lane  

Nighttime Work (9 PM – 5 AM)           

Wednesday, September 4     

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Southbound I-5 to Eastbound US-50 connector ramp, two right lanes closed 
  • Eastbound #1, #2, and #3 lanes from 26th St. through 34 St.  
  • Westbound US-50 to the Southbound 99 connector  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp 
  • Eastbound #1 and #2 lanes from 26th St. to 34th St.  
  • Westbound #1 and #2 lanes from 34th St. to 26th St. 
  • Riverside Blvd. full street closure  

Thursday, September 5    

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp 
  • Eastbound #1 and #2 lanes from 26th St. to 34th St.  
  • Westbound #1 and #2 lanes from 34th St. to 26th St. 
  • Folsom Blvd. full street closure 
  • Riverside Blvd. full street closure  

Friday, September 6  

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp 
  • Eastbound #1 and #2 lanes from 26th St. to 34th St.  
  • Westbound #1 and #2 lanes from 34th St. to 26th St. 
  • Westbound 65th St. offramp 

Saturday, September 7  

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.   
  • Westbound Hornet Dr. onramp    
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. off- and onramp 
  • Eastbound #1 and #2 lanes from 26th St. to 34th St.  
  • Westbound #1 and #2 lanes from 34th St. to 26th St. 
  • Westbound 65th St. offramp 

Sunday, September 8  

  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. off- and onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

September 3, 2024           

Tonight, September 3through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Alerts:     

  • Starting September 6, through September 9, the Westbound Hornet Drive slip on-ramp and Westbound 65th Street off-ramp will be CLOSED for pavement work.             

The following lanes and ramps are scheduled to be CLOSED this week:         

Daytime Work (8:30 AM – 3:30 PM)  

Wednesday, September 4    

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   
  • Southbound lane on Folsom Blvd.   

Thursday, September 5   

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   
  • Southbound lane on Folsom Blvd. 
  • 20th St. Southbound Lane near the US-50 project area  
  • Friday, September 6   
  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   
  • Southbound lane on Folsom Blvd.  
  • 20th St. Southbound Lane near the US-50 project area  
  • 26th St. Northbound lane and 26th St. Offramp lane. 

Nighttime Work (9 PM – 5 AM)          

Tuesday, September 3    

  • 16th St. Eastbound onramp 
  • Eastbound 15th St. Offramp 
  • Westbound #1 and #2 lanes from Stockton to 26th St. 
  • Southbound I-5 through Eastbound connector 
  • Eastbound #1, #2, and #3 lanes from 26th St. Through 34 St. 
  • Westbound US-50 to the Southbound 99 connector 
  • Westbound 65th St. onramp 
  • Eastbound 59th St. offramp 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. onramp 
  • Eastbound #4 and auxiliary lane from Howe Ave. To Watt Ave.  
  • Eastbound Howe onramp 
  • Eastbound Watt offramp 

Wednesday, September 4    

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. on- and offramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #1 and #2 lanes from Howe Ave. to Watt Ave. 
  • Eastbound Howe Ave. on- and offramp 
  • Eastbound #1 and #2 lanes from 26th St. to 34th St. 
  • Westbound #1 and #2 lanes from 34th St. to 26th St.  

Thursday, September 5 

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound Howe Ave. on- and offramp 
  • Eastbound #3 and #4 lanes from Howe Ave. Onramp through Watt Ave. Offramp 
  • Eastbound #1 and #2 lanes Occidental Dr. Through Watt Ave. 

Friday, September 6 

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lanes from Howe Ave. Onramp through Watt Ave. offramp 
  • Eastbound Howe Ave onramp 

Saturday, September 7 

  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. onramp   
  • Westbound 65th St. on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

August 30, 2024           

Tonight, August 30through September 5, construction is scheduled to continue along US-50 in Sacramento.          

The following lanes and ramps are scheduled to be CLOSED this week:         

Daytime Work (8:30 AM – 3:30 PM)  

Tuesday, September 3    

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   
  • Southbound lane on Folsom Blvd.   

Nighttime Work (9 PM – 5 AM)          

Tuesday, September 3    

  • 16th St. Eastbound onramp 
  • Eastbound 15th St. Offramp 
  • Westbound #1 and #2 lanes from Stockton to 26th St. 
  • Southbound I-5 through Eastbound connector 
  • Eastbound #1, #2, and #3 lanes from 26th St. Through 34 St. 
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 65th St. onramp 
  • Eastbound 59th St. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. off- and onramp 
  • Eastbound #4 and auxiliary lane from Howe Ave. To Watt Ave.  
  •  Eastbound Howe onramp 
  • Eastbound Watt offramp 

Wednesday, September 4    

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. on- and offramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #1 and #2 lanes from Howe Ave. to Watt Ave. 
  • Eastbound Howe Ave. on- and offramp 

Thursday, September 5 

  • Westbound #1 and #2 lanes from Stockton to 26th St.  
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. on- and offramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound Howe Ave. on- and offramp 
  • Eastbound #1 and #2 lanes Occidental through Watt Ave.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

August 29, 2024           

Tonight, August 29through the end of the week, construction is scheduled to continue along US-50 in Sacramento.              

The following lanes and ramps are scheduled to be CLOSED this week:

Nighttime Work (9 PM – 5 AM)          

Thursday, August 29 

  • Eastbound Riverside Blvd. onramp   
  • Eastbound 15th St. offramp 
  • Eastbound #3 and #4 lanes from I-5 to 16th St. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Connector ramp from southbound I-5 to eastbound US-50
  • Connector ramp from westbound US-50 to southbound SR-99
  • Westbound 65th Street onramp
  • Eastbound 59th Street offramp
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. onramps
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lanes from Howe Avenue to Watt Avenue

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

August 28, 2024           

Tonight, August 28through the end of the week, construction is scheduled to continue along US-50 in Sacramento.          

The following lanes and ramps are scheduled to be CLOSED this week:         

Daytime Work (8:30 AM – 3:30 PM)  

Thursday, August 29    

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   
  • Southbound lane on Folsom Blvd.   

Friday, August 30   

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • Southbound lane on Folsom Blvd.   
  • X St. #1 lane between 26th St. and 27th St.  

Nighttime Work (9 PM – 5 AM)          

Wednesday, August 28    

  • Westbound #1 and #2 lanes from I-5 to 16th St.   
  • Southbound I-5 through Eastbound connector  
  • Eastbound #1, #2, and #3 lanes from 26th St. Through 34 St. 
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 65th St. onramp 
  • Eastbound 59th St. offramp 
  • Westbound 59th St. Onramp 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. off- and onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #4 and auxiliary lane from Howe Ave. To Watt Ave.  

Thursday, August 29 

  • Eastbound Riverside Blvd. onramp   
  • Eastbound 15th St. offramp 
  • Eastbound #3 and #4 lanes from I-5 to 16th St. 
  • Westbound #1 and #2 lanes from I-5 to 16th St. 
  • Westbound US-50 to the southbound 99 connector 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp   
  • Westbound Howe Ave. onramp   
  • Westbound 65th St. on- and offramps 

 

August 23, 2024          

Tonight, August 23through the end of the week, construction is scheduled to continue along US-50 in Sacramento.         

Alerts:     

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.           
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.    

The following lanes and ramps are scheduled to be CLOSED this week:        

Daytime Work (8:30 AM – 3:30 PM) 

Monday, August 26   

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area 
  • 10th St. near the US-50 project area  
  • Southbound lane on Folsom Blvd.  
  • X St. #1 lane between 26th St. and 27th St. 
  • X St. Inside lane through 10th St. Riverside 

Nighttime Work (9 PM – 5 AM)         

Friday, August 23  

  • Eastbound Riverside Blvd. onramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp  
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. on- and offramps  

Saturday, August 24  

  • Eastbound Riverside Blvd. onramp  
  • T St. near the US-50 project area

Sunday, August 25  

  • Eastbound Riverside Blvd. onramp  
  • Westbound #4 lane to Stockton offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp  
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. on- and offramps  
  • 34th St. near the US-50 project area

Monday, August 26  

  • Eastbound Riverside Blvd. onramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.  
  • Westbound Hornet Dr. onramp  
  • Westbound Howe Ave. onramp  
  • Westbound 65th St. on- and offramps  
  • Westbound Watt Ave. onramp 
  • Westbound lanes from Watt Ave. onramp through Howe Ave. offramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

August 22, 2024         

Tonight, August 22through the end of the week, construction is scheduled to continue along US-50 in Sacramento.        

Alerts:    

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.          
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.   

The following lanes and ramps are scheduled to be CLOSED this week:       

Daytime Work (8:30 AM – 3:30 PM)

Friday, August 23  

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area
  • X St. #1 lane between 26th St. and 27th St.

Nighttime Work (9 PM – 5 AM)        

Thursday, August 22 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. onramp  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound 15th St. offramp 
  • Eastbound #1, #2 and #3 lanes from Stockton Blvd. to 26th St.  
  • Westbound 59th St. onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Hornet Dr. onramp 
  • Westbound Howe Ave. onramp 
  • Westbound 65th St. on- and offramps 
  • Eastbound 65th St. onramp
  • Eastbound 65th St. Onramp to Eastbound Howe Ave. offramp 
  • Connector from westbound US-50 to I-5 south/north

Friday, August 23 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. onramp  
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Hornet Dr. onramp 
  • Westbound Howe Ave. onramp 
  • Westbound 65th St. on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

August 21, 2024         

Tonight, August 21through the end of the week, construction is scheduled to continue along US-50 in Sacramento.        

Alerts:    

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.          
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.   

The following lanes and ramps are scheduled to be CLOSED this week:       

Daytime Work (8:30 AM – 3:30 PM)

Thursday, August 22  

  • 10th St. near the US-50 project area  
  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   
  • #1 lane at X St. from 24th St. to 27th St.  

Friday, August 23  

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area   

Nighttime Work (9 PM – 5 AM)        

Wednesday, August 21 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. Onramp 
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St.  
  • Eastbound 15th St. Offramp 
  • Eastbound #2, #3, and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound 59th St. onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3 and #4 lanes from Howe Ave to 65th St. 
  • Westbound Hornet Dr. onramp 
  • Westbound 65th St. on- and offramps 
  • Westbound 59th St. onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Ave. onramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound 65th St. onramps 

Thursday, August 22 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. onramp  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound 59th St. onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Hornet Dr. Onramp 
  • Westbound Howe Ave. onramp 
  • Westbound 65th St. onramps 
  • Eastbound 65th St. onramp 
  • Eastbound 65th St. Onramp to Eastbound Howe Ave. offramp 

Friday, August 23 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. Onramp 
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St. 
  • Westbound 59th St. onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4, and auxiliary lanes from Howe Ave. to 59th St. 
  • Westbound Hornet Dr. Onramp 
  • Westbound Howe Ave. onramp 
  • Westbound 65th St. off- and onramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

August 20, 2024        

Tonight, August 20through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

Alerts:   

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.         
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.  

The following lanes and ramps are scheduled to be CLOSED this week:      

Daytime Work (8:30 AM – 3:30 PM)         

Wednesday, August 21 

  • 10th St. near the US-50 project area 
  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • #1 lane at X St. from 24th St. to 27th St. 

Thursday, August 22 

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • 20th St. Southbound lane near the US-50 project area 
  • 26th St. northbound lane + 26th St. Offramp 

Friday, August 23 

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • 20th St. Southbound lane near the US-50 project area 
  • 26th St. northbound lane + 26th St. Offramp 

Nighttime Work (9 PM – 5 AM)       

Tuesday, August 20 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Eastbound 15th St. offramp
  • Eastbound #1, #2, and #3 lanes from Stockton Blvd. to 26th St. 
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound Howe Ave. onramp
  • Eastbound #4 lane from Howe Ave. to Watt Ave.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Wednesday, August 21 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1, #2, and #3 lanes from Stockton Blvd. to 26th St. 
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound Howe Ave. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Thursday, August 22 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St.
  • Eastbound #1, #2, and #3 lanes from Stockton Blvd. to 26th St. 
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound Howe Ave. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Friday, August 23 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound Howe Ave. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

August 19, 2024        

Tonight, August 19through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

Alerts:   

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.         
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.  

The following lanes and ramps are scheduled to be CLOSED this week:      

Daytime Work (8:30 AM – 3:30 PM)         

Tuesday, August 20 

  • Southbound lane near Folsom Blvd. 
  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • #1 lane at X St. from 24th St. to 27th St. 

Wednesday, August 21 

  • 10th St. near the US-50 project area 
  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • #1 lane at X St. from 24th St. to 27th St. 
  • 20th St. Southbound lane near the US-50 project area 
  • 26th St. northbound lane + 26th St. offramp 

Thursday, August 22 

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • 20th St. Southbound lane near the US-50 project area 
  • 26th St. northbound lane + 26th St. Offramp 

Friday, August 23 

  • Northbound and Southbound shoulder at Folsom Blvd. near the US-50 project area  
  • 26th St. northbound lane + 26th St. Offramp 

Nighttime Work (9 PM – 5 AM)       

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St. 
  • Eastbound 16th St. Onramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.   
  • Westbound US-50 to the southbound 99 connector  

Tuesday, August 20 

  • Eastbound #1, #2 and #3 lanes from the I-5 connector to 16th St. 
  • Eastbound 16th St. Onramp 
  • Eastbound #1, #2, and #3 lanes from Stockton Blvd. to 26th St. 

Wednesday, August 21 

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St. 
  • Eastbound 16th St. Onramp 
  • Eastbound #1, #2, and #3 lanes from Stockton Blvd. to 26th St. 

Thursday, August 22 

  • Eastbound #1, #2 and #3 lanes from the I-5 connector to 16th St. 
  • Eastbound #1, #2, and #3 lanes from Stockton Blvd. to 26th St. 

Friday, August 23 

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St. 

Monday, August 19 – Friday, August 23 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. onramp  
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St. 
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.   
  • Westbound 59th St. onramp and auxiliary lane      
  • Westbound Stockton Blvd. offramp   
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.       
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp    
  • Westbound 65th St. on- and offramps  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

August 16, 2024       

Tonight, August 16through the end of the week, construction is scheduled to continue along US-50 in Sacramento.      

Alerts 

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.        
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction. 

The following lanes and ramps are scheduled to be CLOSED this week:     

Daytime Work (8:30 AM – 3:30 PM)        

Monday, August 19

  • 6th St. near the US-50 project area
  • 10th St. near the US-50 project area
  • Southbound lane near Folsom Blvd.
  • #1 lane at X St. from 24th St. to 27th St.

Tuesday, August 20

  • 20th St. southbound lane near the US-50 project area

Wednesday, August 21 – Thursday, August 22

  • 20th St. southbound lane near the US-50 project area
  • 26th St. northbound lane + 26th St. offramp

Friday, August 23

  • 26th St. northbound lane + 26th St. offramp

Nighttime Work (9 PM – 5 AM)      

Friday, August 16 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St.
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 

Saturday, August 17

  • Eastbound Riverside Blvd. onramp

Sunday, August 18

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • T St. near the US-50 project area

Monday, August 19

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St.
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • 34th St. near the US-50 project area

Tuesday, August 20 – Friday, August 23

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Eastbound #3 and #4 lanes from the I-5 connector to 15th St.
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

August 15, 2024       

Tonight, August 15through the end of the week, construction is scheduled to continue along US-50 in Sacramento.      

Alerts 

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.        
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction. 

The following lanes and ramps are scheduled to be CLOSED this week:     

Daytime Work (8:30 AM – 3:30 PM)        

Friday, August 16 

  • 6th Street near the US-50 project area 
  • 10th Street near the US-50 project area 
  • Eastbound shoulder at Folsom Blvd. near the US-50 project area 
  • X Street #1 lane from 24th Street to 27th Street 

Friday, August 16 

  • 10th Street near the US-50 project area 
  • Eastbound shoulder at Folsom Blvd. near the US-50 project area 
  • X Street #1 lane from 24th Street to 27th Street 
  • 20th Street near the US-50 project area 
  • 26th Street northbound lane near the US-50 project area and offramp 

Nighttime Work (9 PM – 5 AM)      

Thursday, August 15 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Eastbound auxiliary lane from the I-5 connector to 15th St.
  • Westbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd. 
  • Westbound #2, #3, and #4 lanes from Stockton Blvd. to 26th St.  
  • Eastbound #1, #2 and #3 lanes from 26th St. to Stockton Blvd.

Friday, August 16 

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp 
  • Westbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd. 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

 

August 14, 2024       

Tonight, August 14through the end of the week, construction is scheduled to continue along US-50 in Sacramento.      

Alerts 

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.        
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction. 

The following lanes and ramps are scheduled to be CLOSED this week:     

Daytime Work (8:30 AM – 3:30 PM)        

Thursday, August 15 

  • 6th Street near the US-50 project area 
  • Eastbound shoulder at Folsom Blvd. near the US-50 project area 
  • X Street #1 lane from 24th Street to 27th Street 

Friday, August 16 

  • 10th Street near the US-50 project area 
  • Eastbound shoulder at Folsom Blvd. near the US-50 project area 
  • X Street #1 lane from 24th Street to 27th Street 
  • 20th Street near the US-50 project area 
  • 26th Street northbound lane near the US-50 project area and offramp 

Nighttime Work (9 PM – 5 AM)      

Wednesday, August 14 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St. 
  • Eastbound 16th St. onramp 
  • Westbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 

Thursday, August 15 

  • Eastbound 16th St. onramp 
  • Westbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd. 
  • Westbound #2, #3, and #4 lanes from Stockton Blvd. To 26th St.  

Friday, August 16 

  • Eastbound Riverside Blvd. onramp 
  • Eastbound 16th St. onramp 
  • Westbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St.  
  • Westbound US-50 to the southbound 99 connector 
  • Westbound 59th St. onramp and auxiliary lane     
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.      
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp   
  • Westbound 65th St. on- and offramps 
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd. 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

 

August 13, 2024      

Tonight, August 13through the end of the week, construction is scheduled to continue along US-50 in Sacramento.     

Alerts

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.       
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.

The following lanes and ramps are scheduled to be CLOSED this week:    

Daytime Work (8:30 AM – 3:30 PM)       

Wednesday, August 14

  • Eastbound shoulder at Folsom Blvd. near the US-50 project area

Thursday, August 15

  • 6th Street near the US-50 project area
  • Eastbound shoulder at Folsom Blvd. near the US-50 project area
  • X Street #1 lane from 24th Street to 27th Street
  • 20th Street near the US-50 project area

Friday, August 16

  • 10th Street near the US-50 project area
  • Eastbound shoulder at Folsom Blvd. near the US-50 project area
  • X Street #1 lane from 24th Street to 27th Street
  • 20th Street near the US-50 project area
  • 26th Street northbound lane near the US-50 project area and offramp

Nighttime Work (9 PM – 5 AM)     

 Tuesday, August 13 – Wednesday, August 14

  • Eastbound Riverside Blvd. onramp
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 16th St. onramp
  • Westbound #2, #3 and #4 lanes from Stockton Blvd. to 26th St. 
  • Westbound US-50 to the southbound 99 connector
  • Eastbound 15th St. offramp
  • Eastbound auxiliary lane from the I-5 connector to 15th St.
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

Wednesday, August 14

  • Eastbound Riverside Blvd. onramp
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 16th St. onramp
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St. 
  • Westbound US-50 to the southbound 99 connector
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

Thursday, August 15 – Friday, August 16

  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St. 
  • Westbound US-50 to the southbound 99 connector
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps
  • Eastbound #1 lane from 26th St. to Stockton Blvd.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

August 12, 2024      

Tonight, August 12through the end of the week, construction is scheduled to continue along US-50 in Sacramento.     

Alerts

  • Starting August 12th, the eastbound US-50 10th Street onramp will be CLOSED for pavement work.       
  • From August 12th to August 26th, the eastbound Riverside Boulevard onramp will be CLOSED for ramp reconstruction.

The following lanes and ramps are scheduled to be CLOSED this week:    

Daytime Work (8:30 AM – 3:30 PM)       

Tuesday, August 13

  • Eastbound lanes at Folsom Blvd. near the US-50 project area
  • 20th Street near the US-50 project area

Wednesday, August 14

  • Eastbound lanes at Folsom Blvd. near the US-50 project area
  • 20th Street near the US-50 project area
  • 26th Street near the US-50 project area and offramp

Thursday, August 15

  • Eastbound lanes at Folsom Blvd. near the US-50 project area
  • X Street #1 lane from 24th Street to 27th Street
  • 26th Street near the US-50 project area and offramp

Friday, August 16

  • Eastbound lanes at Folsom Blvd. near the US-50 project area
  • X Street #1 lane from 24th Street to 27th Street

Nighttime Work (9 PM – 5 AM)     

Monday, August 12

  • Eastbound Riverside Blvd. onramp
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 16th St. onramp
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 26th St. 
  • Westbound US-50 to the southbound 99 connector
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

 Tuesday, August 13 – Wednesday, August 14

  • Eastbound Riverside Blvd. onramp
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 16th St. onramp
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St. 
  • Westbound US-50 to the southbound 99 connector
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

 Thursday, August 15 – Friday, August 16

  • Eastbound Riverside Blvd. onramp
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 16th St. onramp
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th St. 
  • Westbound US-50 to the southbound 99 connector
  • Eastbound #1 lane from 26th Street to Stockton Blvd.
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp  
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

 

August 8, 2024      

Tonight, August 8through the end of the week, construction is scheduled to continue along US-50 in Sacramento.     

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.       

The following lanes and ramps are scheduled to be CLOSED this week:    

Daytime Work (8:30 AM – 5:00 PM)       

Friday, August 9

  • Eastbound lanes at Folsom Blvd. near the US-50 project area.

Monday, August 12

  • Eastbound lanes at Folsom Blvd. near the US-50 project area.
  • X St. #1 lane between 24th and 26th St. 

Nighttime Work (9 PM – 5 AM)     

Thursday, August 8  

  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Ave. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Hornet Dr. onramp  
  • Eastbound Howe Ave. offramp 
  • Eastbound 65th St. Onramp and auxiliary lanes 
  • Westbound 65th St. on- and offramps
  • Westbound and eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.

Friday, August 9 — Saturday, August 10

  • Westbound and eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.

Sunday, August 11

  • Eastbound 16th St. onramp
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Hornet Dr. onramp  
  • Eastbound Howe Ave. offramp 
  • Westbound 65th St. on- and offramps

Monday, August 12 — Friday, August 16

  • Eastbound 16th St. onramp
  • Eastbound #3, #4 and auxiliary lanes from the I-5 connector to 16th St.
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Hornet Dr. onramp  
  • Eastbound Howe Ave. offramp 
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

 

August 7, 2024      

Tonight, August 7through the end of the week, construction is scheduled to continue along US-50 in Sacramento.     

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.       

The following lanes and ramps are scheduled to be CLOSED this week:    

Daytime Work (8:30 AM – 5:00 PM)       

Thursday, August 8 

  • Eastbound lanes through Folsom Blvd.   
  • X St. #1 lane between 24th and 26th St. 

Friday, August 9

  • X St. #1 lane between 24th and 26th St. 

Nighttime Work (9 PM – 5 AM)     

Wednesday, August 7  

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.  
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.    
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound 65th St. on- and offramps   
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp  
  • Eastbound Howe Ave. Offramp 
  • Eastbound 65th St. Onramp and auxiliary lanes 

Thursday, August 8  

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.  
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.    
  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp 
  • Westbound 65th St. on- and offramps   
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.     
  • Westbound Howe Ave. onramp 
  • Westbound Hornet Dr. onramp  
  • Eastbound Howe Ave. Offramp 
  • Eastbound 65th St. Onramp and auxiliary lanes 

Friday, August 9  

  • Westbound 59th St. onramp and auxiliary lane    
  • Westbound Stockton Blvd. offramp    
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.   
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.  

Friday, August 9  

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.   
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.   

August 6, 2024     

Tonight, August 6through Friday, August 9, construction is scheduled to continue along US-50 in Sacramento.    

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.      

The following lanes and ramps are scheduled to be CLOSED this week:   

Daytime Work (8:30 AM – 5:00 PM)      

Wednesday, August 7 

  • X St. #1 lane between 24th and 26th St. 

Thursday, August 8 – Friday, August 9 

  • Eastbound lanes through Folsom Blvd.  

Nighttime Work (9 PM – 5 AM)    

Tuesday, August 6 

  • Eastbound 15th St. offramp
  • Eastbound auxiliary lane from the I-5 connector to 16th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Westbound #2, 3 and 4 lanes from 65th St. to 59th St.
  • Westbound 65th St. on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp 
  • Westbound Watt Ave. onramp 
  • Eastbound Howe Ave. onramp and #4 lane
  • Eastbound #4 lane from Howe Ave. to Occidental Dr.

Wednesday, August 7 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp
  • Westbound 65th St. on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp 
  • Eastbound Howe Ave. offramp

Thursday, August 8 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp
  • Westbound 65th St. on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp 
  • Westbound Watt Ave. onramp
  • Eastbound Howe Ave. offramp

Friday, August 9 

  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

August 5, 2024     

Tonight, August 5through Friday, August 9, construction is scheduled to continue along US-50 in Sacramento.    

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.      

The following lanes and ramps are scheduled to be CLOSED this week:   

Daytime Work (8:30 AM – 5:00 PM)      

Tuesday, August 6 

  • Eastbound lanes through Folsom Blvd.  
  • X St. #1 lane between 24th and 26th St. 

Wednesday, August 7 

  • X St. #1 lane between 24th and 26th St. 

Thursday, August 8 – Friday, August 9 

  • Eastbound lanes through Folsom Blvd.  

Nighttime Work (9 PM – 5 AM)    

Monday, August 5 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Westbound 65th St. on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Eastbound 65th St. offramp 
  • Westbound Watt Ave. onramp 

Tuesday, August 6 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Westbound 65th Street on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Westbound Watt Ave. onramp 
  • Eastbound Howe Ave. offramp 

Wednesday, August 7 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Westbound 65th St. on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Eastbound Howe Ave. offramp 

Thursday, August 8 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.   
  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Westbound 65th St. on- and offramps  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th St.    
  • Westbound Howe Ave. onramp   
  • Westbound Hornet Dr. onramp   
  • Westbound Watt Ave. onramp 
  • Eastbound Howe Ave. Offramp 

Friday, August 9 

  • Westbound 59th St. onramp and auxiliary lane   
  • Westbound Stockton Blvd. offramp   
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

 

August 2, 2024    

Tonight, August 2through Friday, August 9, construction is scheduled to continue along US-50 in Sacramento.   

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.     

The following lanes and ramps are scheduled to be CLOSED this week:  

Daytime Work (8:30 AM – 5:00 PM)     

Monday, August 5 – Wednesday, August 7

  • Eastbound lanes through Folsom Blvd. 
  • X St. #1 lane between 24th and 26th St.

Thursday, August 8 – Friday, August 9

  • Eastbound lanes through Folsom Blvd. 

Nighttime Work (9 PM – 5 AM)   

Friday, August 2 

  • Westbound 10th St. offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.  
  • Westbound 59th St. onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  

Saturday, August 3

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.

Sunday, August 4

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.  
  • Westbound 59th St. onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  
  • Eastbound 65th St. onramp

Monday, August 5

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.  
  • Westbound 59th St. onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Eastbound 65th St. onramp
  • Westbound Watt Ave. onramp

Tuesday, August 6

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.  
  • Westbound 59th St. onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Dr. onramp  
  • Westbound Watt Ave. onramp

Wednesday, August 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.  
  • Westbound 59th St. onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  

Thursday, August 8

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 26th St. through Stockton Blvd.  
  • Westbound 59th St. onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Ave. onramp  
  • Westbound Hornet Dr. onramp  
  • Eastbound 65th St. onramp
  • Westbound Watt Ave. onramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

 

August 1, 2024    

Tonight, August 1, through Monday, August 5, construction is scheduled to continue along US-50 in Sacramento.   

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.     

The following lanes and ramps are scheduled to be CLOSED this week:  

Daytime Work (8:30 AM – 5:00 PM)     

Friday, August 2 & Monday, August 5 

  • Eastbound lanes through Folsom Blvd. 

Nighttime Work (9 PM – 5 AM)   

Thursday, August 1 

  • Eastbound 16th Street onramp  
  • Eastbound 15th Street offramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Eastbound auxiliary lanes from I-5 through 16th Street 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  

Friday, August 2 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  

Sunday, August 4 

  • Westbound 65th Street onramps 

Monday, August 5 

  • Westbound 65th Street onramps 
  • Westbound Watt Avenue onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 31, 2024    

Tonight, July 31, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.     

The following lanes and ramps are scheduled to be CLOSED this week:  

Daytime Work (8:30 AM – 5:00 PM)     

Thursday, August 1  

  • Eastbound lanes through Folsom Blvd. 

Nighttime Work (9 PM – 5 AM)   

Wednesday, July 31 

  • Eastbound 16th Street onramp  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  
  • Eastbound 34th Street offramp 
  • Eastbound auxiliary lanes from 26th Street through 34th Street 
  • Eastbound X Street onramp 

Thursday, August 1 – Friday, August 2 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound 65th Street on- and offramps 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 30, 2024    

Tonight, July 30, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.   

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.     

The following lanes and ramps are scheduled to be CLOSED this week:  

Daytime Work (8:30 AM – 5:00 PM)     

Wednesday, July 31 

  • 20th – 24th St. under the US-50 project area 

Thursday, August 1  

  • 20th – 24th St. under the US-50 project area 
  • Eastbound lanes through Folsom Blvd. 
  • X St. inside shoulder from 24th to 26th St 

Friday, August 2 

  • 20th – 24th St. under the US-50 project area 
  • X St. inside shoulder from 24th to 26th St. 

Nighttime Work (9 PM – 5 AM)   

Tuesday, July 30 

  • Eastbound 15th Street offramp  
  • Eastbound auxiliary lanes from I-5 to 16th Street   
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  
  • Westbound 65th Street on- and offramps  

Wednesday, July 31 – Friday, August 2 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp  
  • Westbound 65th Street on- and offramps  

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

July 29, 2024   

Tonight, July 29, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.    

The following lanes and ramps are scheduled to be CLOSED this week: 

Daytime Work (8:30 AM – 5:00 PM)    

Monday, July 29 – Wednesday, July 31

  • 18th – 24th St. under the US-50 project area 
  • Eastbound lanes through Folsom Blvd.

Thursday, August 1 – Friday, August 2

  • 18th – 24th St. under the US-50 project area 
  • Eastbound lanes through Folsom Blvd.
  • X St. inside shoulder from 24th to 26th St.

Nighttime Work (9 PM – 5 AM)  

Monday, July 29 – Tuesday, July 30

  • Eastbound 15th Street offramp 
  • Eastbound auxiliary lanes from I-5 to 16th Street  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Wednesday, July 31 – Friday, August 2

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

July 26, 2024   

Tonight, July 26, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.    

The following lanes and ramps are scheduled to be CLOSED this week: 

Daytime Work (8:30 AM – 5:00 PM)    

Monday, July 29 

  • 18th – 23rd St. under the US-50 project area 
  • Eastbound lanes through Folsom Blvd. 

Nighttime Work (9 PM – 5 AM)  

Friday, July 26 

  • Eastbound 15th Street offramp 
  • Eastbound auxiliary lanes from I-5 to 16th Street  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Saturday, July 27 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 

Sunday, July 28 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Monday, July 29 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 25, 2024   

Tonight, July 25, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.    

The following lanes and ramps are scheduled to be CLOSED this week:  

Daytime Work (8:30 AM – 5:00 PM)    

Friday, July 26 

  • 18th – 23rd St. under the US-50 project area

Nighttime Work (9 PM – 5 AM)  

Thursday, July 25

  • Eastbound 15th Street offramp 
  • Eastbound auxiliary lanes from I-5 to 16th Street  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 65th St. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Friday, July 26 

  • Westbound and eastbound #1 and #2 lanes from 26th Street to Stockton Blvd. 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 65th St. onramp
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Saturday, July 27 

  • Westbound #1 and 2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 24, 2024   

Tonight, July 24, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Alert: Starting August 12th, the Eastbound US-50 10th Street onramp will be CLOSED for pavement work.    

The following lanes and ramps are scheduled to be CLOSED this week:  

Daytime Work (8:30 AM – 5:00 PM)    

Thursday, July 25 

  • W Street #1 lane from 10th St. to Riverside Blvd. 

Friday, July 26 

  • Eastbound lanes through Folsom Blvd. 

Nighttime Work (9 PM – 5 AM)  

Wednesday, July 24 

  • Eastbound 15th Street offramp 
  • Eastbound auxiliary lanes from I-5 to 16th Street  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Thursday, July 25 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Friday, July 26 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 23, 2024   

Tonight, July 23, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Reminder: Through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.    

The following lanes and ramps are scheduled to be CLOSED this week: 

Daytime Work (8:30 AM – 3:30 PM)    

Wednesday, July 24 

  • W Street #1 lane from 10th St. to Riverside Blvd. 

Thursday, July 25 

  • Eastbound lanes through Folsom Blvd. 

Nighttime Work (9 PM – 5 AM)  

Tuesday, July 23 

  • Eastbound 15th Street offramp  
  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Wednesday, July 24 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Thursday, July 25 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Friday, July 26 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 22, 2024   

Tonight, July 22, through the end of the week, construction is scheduled to continue along US-50 in Sacramento.  

Reminder: Through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.    

The following lanes and ramps are scheduled to be CLOSED this week: 

Daytime Work (8:30 AM – 3:30 PM)    

Tuesday, July 23 

  • W Street #1 lane from 10th St. to Riverside Blvd. 

Nighttime Work (9 PM – 5 AM)  

Monday, July 22   

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Tuesday, July 23 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Wednesday, July 24 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Thursday, July 25 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

Friday, July 26 

  • Eastbound #1 and #2 lanes from 26th Street through Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on- and offramps 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

July 19, 2024  

Tonight, July 19, and tomorrow, construction is scheduled to continue along US-50 in Sacramento. 

Reminder: Through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

The following lanes and ramps are scheduled to be CLOSED this week:

Daytime Work (8:30 AM – 3:30 PM)   

Monday, July 22

  • W Street #1 lane from 10th St. to Riverside Blvd.

Nighttime Work (9 PM – 5 AM) 

Friday, July 19  

  • Eastbound 15th St. offramp 
  • Eastbound and westbound #1 and #2 lanes from 26th St. through Stockton Blvd.
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Saturday, July 20

  • Eastbound 15th St. offramp
  • Eastbound 34th St. offramp
  • Eastbound auxiliary lane from 26th St. to 34th St.
  • Eastbound X St. onramp

Sunday, July 21

  • Eastbound 15th St. offramp 
  • Eastbound and westbound #1 and #2 lanes from 26th St. through Stockton Blvd.
  • Westbound #3, #4 and auxiliary lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 18, 2024  

Tonight, July 18, and tomorrow, lane and ramp closures are scheduled to continue along US-50 in Sacramento.   

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

Daytime Work (8:30 AM – 3:30 PM)   

Friday, July 19 

  • W Street #1 lane from 6th Street to 9th Street  
  • Eastbound lanes through Folsom Boulevard 

Nighttime Work (9 PM – 5 AM) 

Thursday, July 18 

  • Eastbound  auxiliary lanes from I-5 to 16th Street 
  • Westbound #1 and #2 lanes from Stockton through 26th Street  
  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton 
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #1 and #2 lanes from Stockton through 65th Street  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet onramp 
  • Westbound 65th off and onramp 

Friday, July 19  

  • Eastbound  auxiliary lanes from I-5 to 16th Street 
  • Westbound #1 and #2 lanes from Stockton through 26th Street 
  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton 
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet onramp 
  • Westbound 65th off and onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 17, 2024  

Tonight, July 17, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.   

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

Daytime Work (8:30 AM – 3:30 PM)   

Thursday, July 18 

  • W Street #1 lane from 6th Street to 9th Street  

Friday, July 19 

  • W Street #1 lane between 8th St. and Riverside Blvd.

Nighttime Work (9 PM – 5 AM)   

Wednesday, July 17  

  • Eastbound  auxiliary lanes from I-5 to 16th Street 
  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton 
  • Westbound #1 #2 and #3 lanes from Stockton Blvd. to 26th Street  
  • Westbound connector from US-50 to southbound 99 
  • Eastbound 34th Street offramp 
  • Eastbound auxiliary lane from 26th Street to 34th Street 
  • Eastbound X Street onramp  
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet onramp 
  • Westbound 65th off and onramp 

Thursday, July 18 

  • Eastbound  auxiliary lanes from I-5 to 16th Street 
  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton 
  • Westbound #1 #2 and #3 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet onramp 
  • Westbound 65th off and onramp 

Friday, July 19  

  • Eastbound  auxiliary lanes from I-5 to 16th Street 
  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton 
  • Westbound #1 #2 and #3 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet onramp 
  • Westbound 65th off and onramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 16, 2024  

Tonight, July 16, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.   

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

Daytime Work (8:30 AM – 3:30 PM)   

Tuesday, July 17 – 19

  • W Street #1 lane between 8th St. and Riverside Blvd.

Nighttime Work (9 PM – 5 AM)   

Tuesday, July 16

  • Eastbound 15th St. offramp
  • Eastbound and westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound connector from US-50 to southbound 99
  • Eastbound 34th St. offramp
  • Eastbound auxiliary lanes from 26th St. to 34th St.
  • Eastbound X St. onramp

Wednesday, July 17 – Friday, July 19

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Eastbound and westbound #1 and #2 lanes from 26th St. to Stockton Blvd.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 15, 2024  

Tonight, July 15, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.   

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

Daytime Work (8:30 AM – 3:30 PM)   

Tuesday, July 16 – 19

  • W Street #1 lane between 8th St. and Riverside Blvd.

Nighttime Work (9 PM – 5 AM)   

Monday, July 15 – Friday, July 19

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 26th St.

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

 

July 12, 2024 

Tonight, July 12, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.   

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

Daytime Work (8:30 AM – 3:30 PM)   

Monday, July 15 

  • X Street Shoulder between 8th and 9th Street 

Nighttime Work (9 PM – 5 AM)   

Friday, July 12  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Eastbound Riverside Blvd. Onramp 
  • Eastbound 16th Street onramp 
  • Eastbound 15th Street offramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Eastbound 34th Street offramp  
  • Eastbound 26th Street onramp on X Street and auxiliary lane  
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton on and offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Slip onramp 
  • Westbound 65th onramp 
  • Westbound 59th onramp and auxiliary lane 
  • Eastbound #4 lane from 65th Street to Occidental Drive  
  • Eastbound 65th Street onramp and auxiliary lane 
  • Eastbound #4 lane from Howe to Occidental Drive 
  • Eastbound Howe Avenue onramp 

Saturday, July 13 

  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street through Stockton 
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 

Sunday, July 14  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Eastbound 15th Street offramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Slip onramp 
  • Westbound 65th off and onramp 

Monday, July 15  

  • Eastbound 15th Street offramp 
  • Eastbound #1 and #2 lanes from 26th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Slip onramp 
  • Westbound 65th off and onramp 
  • Westbound 59th onramp and auxiliary lane 
  • Westbound Stockton offramp 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 11, 2024 

Tonight, July 11, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.  

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.  

Daytime Work (8:30 AM – 3:30 PM)  

Friday, July 12

  • X St Shoulder between 8th and 6th St.

Monday, July 15 – Wednesday, July 17

  • W St #1 Lane between 8th and 6th St.

Nighttime Work (9 PM – 5 AM)  

Thursday, July 11 

  • Eastbound 15th Street offramp 
  • Eastbound lane #4 and auxiliary lane from I-5 to Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Eastbound 65th Street on and offramps
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive
  • Eastbound Howe Avenue onramp

Friday, July 12 

  • Eastbound #3 and #4 lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. on- and offramps
  • Eastbound 16th St. onramp
  • Eastbound lane #4 and auxiliary lane from I-5 to Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Eastbound 65th Street on and offramps
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive
  • Eastbound Howe Avenue onramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 10, 2024 

Tonight, July 10, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.  

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.  

Nighttime Work (9 PM – 5 AM)  

Wednesday, July 10 

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Eastbound Riverside Blvd. onramp 
  • Eastbound 15th Street offramp 
  • Eastbound 16th Street onramp 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Eastbound 65th Street onramp 

Thursday, July 11 

  • Eastbound 15th Street offramp 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Eastbound 65th Street on and offramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Eastbound #3 and #4 lanes from How Avenue to Occidental Drive 
  • Eastbound 65th Street onramp 
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive 
  • Eastbound Howe Avenue onramp 

Friday, July 12 

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Eastbound Riverside Blvd. onramp 
  • Eastbound 15th Street offramp 
  • Eastbound 16th Street onramp 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound 65th Street on and offramp 
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive 
  • Eastbound Howe Avenue onramp

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 9, 2024 

Tonight, July 9, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.  

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.  

Nighttime Work (9 PM – 5 AM) 

Tuesday, July 9 

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Eastbound Riverside Blvd. onramp 
  • Eastbound 15th Street offramp 
  • Eastbound 16th Street onramp 
  • Westbound 65th Street onramp 
  • Westbound  #3 and #4 lanes from 65th Street to 59th Street 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp  
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • X Street #1 lane from 26th Street to 28th Street 
  • Northbound 99 to Eastbound US-50 connector ramp 

Wednesday, July 10 

  • Westbound 65th Street on and offramp 
  • Westbound  #3 and #4 lanes from 65th Street to 59th Street 
  • Eastbound 15th Street offramp 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Westbound 59th Street onramp and auxiliary lane 

Thursday, July 11 

  • Westbound 65th Street on and offramp 
  • Westbound  #3 and #4 lanes from 65th Street to 59th Street 
  • Eastbound 15th Street offramp 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street  
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Eastbound #3 and #4 lanes from How Avenue to Occidental Drive 

Friday, July 12 

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Eastbound Riverside Blvd. onramp 
  • Eastbound 15th Street offramp 
  • Eastbound 16th Street onramp 
  • Westbound 65th Street on and off ramp 
  • Westbound  #3 and #4 lanes from 65th Street to 59th Street 
  • Eastbound lane #4 and auxiliary lane from I-5 to Eastbound Riverside Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp  
  • Westbound Hornet Drive onramp 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • X Street #1 lane from 26th Street to 28th Street 
  • Northbound 99 to Eastbound US-50 connector ramp 
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive 
  • Eastbound Howe Avenue onramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 8, 2024  

Tonight, July 8, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.   

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.   

Nighttime Work (9 PM – 5 AM)  

Monday, July 8  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street  
  • Eastbound Riverside Blvd. onramp  
  • Eastbound 16th Street onramp  
  • Eastbound 15th Street offramp  
  • Eastbound auxiliary lanes from I-5 to Riverside Blvd.   
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Northbound 99 to Eastbound US-50 connector ramp  

Tuesday, July 9  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street  
  • Eastbound Riverside Blvd. onramp  
  • Eastbound 16th Street onramp  
  • Eastbound 15th Street offramp  
  • Eastbound auxiliary lanes from I-5 to Riverside Blvd.   
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Northbound 99 to Eastbound US-50 connector ramp  

Wednesday, July 10  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street  
  • Eastbound Riverside Blvd. onramp  
  • Eastbound 16th Street onramp  
  • Eastbound 15th Street offramp  
  • Eastbound auxiliary lanes from I-5 to Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street   
  • Westbound Howe Avenue onramp   
  • Westbound Hornet Drive onramp  
  • Westbound 65th Street on- and offramps   
  • X Street #1 lane from 26th Street to 28th Street  
  • Northbound 99 to Eastbound US-50 connector ramp  
  • Westbound lane #2 connector from US-50 to southbound 99  

Thursday, July 11  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street  
  • Eastbound Riverside Blvd. onramp  
  • Eastbound 16th Street onramp  
  • Eastbound 15th Street offramp  
  • Eastbound auxiliary lanes from I-5 to Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street   
  • Westbound Howe Avenue onramp   
  • Westbound Hornet Drive onramp  
  • Westbound 65th Street on and offramps   
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive  

Friday, July 12  

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street  
  • Eastbound Riverside Blvd. onramp  
  • Eastbound 16th Street onramp  
  • Eastbound 15th Street offramp  
  • Eastbound auxiliary lanes from I-5 to Riverside Blvd.  
  • Eastbound #1, #2 and #3 lanes from 26th Street to Stockton Blvd.  
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street  
  • Westbound 59th Street onramp and auxiliary lane  
  • Westbound Stockton Blvd. offramp  
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street   
  • Westbound Howe Avenue onramp   
  • Westbound Hornet Drive onramp  
  • Eastbound #3 and #4 lanes from Howe Avenue to Occidental Drive 

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.  

July 3, 2024 

Tonight, July 3, through the end of the week, most work road work is on hold due to the national holiday.

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.  

 Friday, July 5 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 2, 2024 

Tonight, July 2, through the end of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento.  

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work.  

Nighttime Work (9 PM – 6 AM) 

Tuesday, July 2 

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street 
  • Riverside onramp 
  • Eastbound 15th Street offramp 
  • Eastbound 16th Street onramp 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 
  • Westbound 59th Street onramp and auxiliary lane 
  • Westbound Stockton Blvd. offramp 
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street 
  • Westbound Howe Avenue onramp 
  • Westbound Hornet Drive onramp 
  • Westbound 65th Street on and offramps 

 Friday, July 5 

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street 

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues. 

July 1, 2024

Tonight, July 1, to tomorrow, July 2, lane and ramp closures are scheduled to continue along US-50 in Sacramento. 

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Nighttime Work (9 PM – 6 AM)

Monday, July 1

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street
  • Riverside onramp
  • Eastbound 15th Street offramp
  • Eastbound 16th Street onramp
  • Eastbound Stockton Blvd. onramp
  • Eastbound #4 lane from Stockton Blvd. to 65th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th Street onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street
  • Westbound Howe Avenue onramp
  • Westbound Hornet Drive onramp
  • Westbound 65th Street on and offramps

Tuesday, July 2

  • Eastbound #3 and #4 lanes from I-5 Interchange to 16th Street
  • Riverside onramp
  • Eastbound 15th Street offramp
  • Eastbound 16th Street onramp
  • Westbound 59th Street onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3, #4 and auxiliary lanes from Howe Avenue to 59th Street
  • Westbound Howe Avenue onramp
  • Westbound Hornet Drive onramp
  • Westbound 65th Street on and offramps

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

June 28, 2024

Tonight, June 28, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. 

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Daytime Work (8:30 AM – 3:30 PM)

Monday, July 1

  • #1 lane near W St. from 6th St. to 5th St.

Nighttime Work (9 PM – 6 AM)

Friday, June 28

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Sunday, June 30

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Monday, July 1

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

Tuesday, July 2

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 27, 2024

Tonight, June 27, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. 

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Nighttime Work (9 PM – 6 AM)

Thursday, June 27

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and Eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Avenue onramp to Watt Avenue offramp
  • Connector ramp from eastbound US-50 to SB-51

Friday, June 28

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and Eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 26, 2024

Tonight, June 26, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. 

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Reminder: Grinding work is scheduled to take place between 65th Street and Howe Avenue from 6/24 through 6/26. Nearby residents can expect loud construction noises as work is underway.

Nighttime Work (9 PM – 6 AM)

Wednesday, June 26

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. offramp

Thursday, June 27

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp

Friday, June 28

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 25, 2024

Tonight, June 25, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. 

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Reminder: Grinding work is scheduled to take place between 65th Street and Howe Avenue from 6/24 through 6/26. Nearby residents can expect loud construction noises as work is underway.

Nighttime Work (9 PM – 6 AM)

Tuesday, June 25

  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd. 
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #4 lanes from Howe offramp to onramp
  • Eastbound Howe Avenue onramp
  • X Street #1 lane from 8th Street to 9th Street
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound Hornet Drive onramp
  • Westbound 65th Street on and offramps

Wednesday, June 26

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound Howe Ave. onramp

Thursday, June 27

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th Street offramp
  • Eastbound 16th Street onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp

Friday, June 28

  • Eastbound #3 and #4 lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • Eastbound 15th Street offramp
  • Eastbound 16th Street onramp
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 24, 2024

Tonight, June 24, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. 

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Reminder: Grinding work is scheduled to take place between 65th Street and Howe Avenue from 6/24 through 6/26. Nearby residents can expect loud construction noises as work is underway.

Nighttime Work (9 PM – 6 AM)

Monday, June 24

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • W Street #1 lane from Riverside Blvd. to 10th Street
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound Hornet Drive onramp
  • Westbound 65th Street on and offramps
  • Westbound Watt Ave. onramp

Tuesday, June 25

  • Eastbound and westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • W Street #1 lane from Riverside Blvd. to 10th Street
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from Occidental to Watt Avenue
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound Hornet Drive onramp
  • Westbound 65th Street on and offramps

Wednesday, June 26

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Riverside Blvd. onramp
  • Eastbound 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Avenue to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound Hornet Drive onramp
  • Westbound 65th Street on and offramps
  • Westbound Watt Ave. onramp

Thursday, June 27

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Riverside Blvd. onramp
  • Eastbound 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp
  • Westbound 65th Street on and offramps

Friday, June 28

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp
  • Westbound 65th Street on and offramps

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 21, 2024

Tonight, June 21, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Nighttime Work (9 PM – 6 AM)

Friday, June 21

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from Occidental Dr. to Watt Ave.
  • Westbound Howe Ave. onramp
  • Westbound Watt Ave. onramp

Sunday, June 23

  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 59th St.
  • Westbound Howe Ave. onramp
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. on- and offramps
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 20, 2024

Tonight, June 20, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Nighttime Work (9 PM – 6 AM)

Thursday, June 20

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from Occidental Dr. to Watt Ave.
  • Westbound Hornet Dr. onramp
  • 65th Street on and offramps

Friday, June 21

  • Eastbound #3 and #4 lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from Occidental Dr. to Watt Ave.
  • 65th Street on and offramps

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 18, 2024

Tonight, June 18, through the rest of the week, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

Alert: Tonight, June 18, expect loud grinding work between 65th Street and Howe Avenue.

Notice: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

Nighttime Work (9 PM – 6 AM)

Tuesday, June 18

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • T St. near the US-50 project area
  • Eastbound #1 and #2 lanes from Occidental to Watt Avenue
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Hornet Dr. onramp
  • 65th Street on and offramps

Wednesday, June 19

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 65th St. on and offramps
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp
  • Eastbound #1 and #2 lanes from Occidental to Watt Avenue
  • Howe Avenue onramp

Thursday, June 20

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp
  • Howe Avenue onramp
  • 65th Street on and offramps

Friday, June 21

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp
  • Howe Avenue onramp
  • 65th Street on and offramps

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

June 17, 2024

Tonight, June 17, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

Alert: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Monday, June 17

  • Eastbound #4 + auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 65th St. onramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Eastbound Occidential Dr. to Watt Ave.
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp
  • Westbound Howe Ave. offramp

Tuesday, June 18

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Eastbound Riverside Blvd. onramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 65th St. onramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • T St. near the US-50 project area
  • Eastbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp

Wednesday, June 19

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 65th St. onramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp

Thursday, June 20

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp

Friday, June 21

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound 15th St. offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lanes
  • Westbound 59th St. onramp + auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Hornet Dr. onramp

 

June 14, 2024

Tonight, June 14, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

Alert: Starting July 8 through July 22, the eastbound US-50 15th Street offramp and 10th Street onramp will be CLOSED for pavement work. 

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Friday, June 14

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound Howe Avenue onramp and auxiliary lane
  • Westbound #1 and #3 lanes from Stockton Blvd. to 34th Street
  • 65th St. onramp
  • 34th Street offramp
  • Westbound 59th St. onramp and auxiliary lanes
  • Westbound Stockton Blvd. offramp

 

June 13, 2024

This week, June 10 through June 14, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Thursday, June 13

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound Howe Avenue onramp and auxiliary lane
  • Westbound #1 and #3 lanes from Stockton Blvd. to 34th Street
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lanes
  • Westbound Stockton Blvd. offramp

Friday, June 14

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound Howe Avenue onramp and auxiliary lane
  • Westbound #1 and #3 lanes from Stockton Blvd. to 34th Street
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lanes
  • Westbound Stockton Blvd. offramp

 

June 12, 2024

This week, June 10 through June 14, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Wednesday, June 12

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound 34th Street offramp
  • Eastbound Stockton Blvd. onramp
  • Eastbound and westbound 65th Street onramp
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp and auxiliary lane

Thursday, June 13

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lanes
  • Westbound Stockton Blvd. offramp

Friday, June 14

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lanes
  • Westbound Stockton Blvd. offramp

 

June 11, 2024

This week, June 10 through June 14, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Tuesday, June 11

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Eastbound 59th St. offramp
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp and auxiliary lane

Wednesday, June 12

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp and auxiliary lane
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.

Thursday, June 13

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St. 
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.

Friday, June 14

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St. 
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.

 

June 10, 2024

This week, June 10 through June 14, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Monday, June 10

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound Stockton Blvd. onramp and offramps
  • Northbound #1 lane from 65th St. to S St. near the US-50 project area
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Howe Ave. onramp and auxiliary lane

Tuesday, June 11

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Eastbound #1 and #2 lanes from 26th St. to 34th St. 
  • Westbound #3 and #4 lanes from 65th St. to 59th. St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.

Wednesday, June 12

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Eastbound #1 and #2 lanes from 26th St. to 34th St. 
  • Westbound #3 and #4 lanes from 65th St. to 59th. St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.

Thursday, June 13

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Westbound #3 and #4 lanes from 65th St. to 59th. St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.

Friday, June 14

  • Eastbound auxiliary lanes from I-5 to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp
  • Westbound and eastbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Westbound #3 and #4 lanes from 65th St. to 59th. St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp and auxiliary lane
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.

 

June 7, 2024

This week, June 3 through June 7, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

ALERT: This Sunday night, June 9, expect loud demolition work between 65th Street and Howe Avenue. 

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

Nighttime Work (9 PM – 6 AM)

Friday, June 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound #3 and #4 lanes from 65th St. to 59th. St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Westbound #2, #3 and #4 Howe Ave. to 65th St.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound Hornet Dr. onramp
  • Westbound 65th St. offramp
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th St.

Saturday, June 8

  • Westbound #2, #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound Hornet Dr. onramp
  • Westbound and eastbound 65th St. offramp

Sunday, June 9

  • 8th – 10th St. near the US-50 project zone
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St. 
  • Eastbound #1 and #2 lanes from 26th St. to Stockton Blvd. 
  • Westbound #3 and #4 lanes from 65th St. to 59th. St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St. 
  • Westbound Howe Ave. onramp and auxiliary lane
  • Eastbound Auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Eastbound 16th St. onramp

 

June 6, 2024

This week, June 3 through June 7, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

ALERT: This Sunday night, June 9, expect loud demolition work between 65th Street and Howe Avenue. 

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Thursday, June 6

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • 16th Street onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from Howe Avenue to 65th Street
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue
  • Howe Avenue onramp

Friday, June 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th Street

June 5, 2024

This week, June 3 through June 7, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

Nighttime Work (9 PM – 6 AM)

Wednesday, June 5

  • Eastbound Auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • 16th Street onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from Howe Avenue to 65th Street
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue
  • Howe Avenue onramp

Thursday, June 6

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from Howe Avenue to 65th Street
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue

Friday, June 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th Street

June 4, 2024

This week, June 3 through June 7, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

Nighttime Work (9 PM – 6 AM)

Tuesday, June 4

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • 65th Street on and offramps
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from 65th Street to 59th Street
  • Eastbound #1, #2 and #3 lanes from 65th Street to Occidental Ave.
  • Howe Ave./Hornet Drive offramp

Wednesday, June 5

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from 65th Street to 59th Street

Thursday, June 6

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from 65th Street to 59th Street

Friday, June 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th Street

 

June 3, 2024

This week, June 3 through June 7, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Crews will be performing work on the concrete slabs and median; nearby residents can expect loud construction noises as work is underway.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 6 AM)

Monday, June 3

  • Eastbound auxiliary lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • 16th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue
  • Westbound #1 and #2 lanes from 65th Street to 59th Street
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Howe Avenue onramp

Tuesday, June 4

  • Eastbound auxiliary lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • 16th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th Street to 59 Street (right side of split)
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue
  • Westbound #1 and #2 lanes from 65th Street to 59th Street

Wednesday, June 5

  • Eastbound auxiliary lanes from I-5 interchange to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • 16th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th Street to 59 Street (right side of split)
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from 65th Street to 59th Street

Thursday, June 6

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th Street to 59 Street (right side of split)
  • 65th Street onramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • Westbound #1 and #2 lanes from 65th Street to 59th Street

Friday, June 7

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Eastbound #1 and #2 lanes from 16th Street to Stockton Blvd.
  • Westbound #1, #2 and #3 lanes from Stockton Blvd. to 34th Street

 

Friday, May 31

For the week of May 27, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 5 AM)

Friday, May 31

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • T St. under the US-50 project area
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Eastbound 65th Street offramp
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Westbound 65th Street and 59th Street onramps
  • Westbound Stockton Blvd. offramp

 

Thursday, May 30

For the week of May 27, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 5 AM)

Thursday, May 30

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Stockton Blvd. under the US-50 project area
  • T St. under the US-50 project area
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Westbound Howe Ave. onramp and auxiliary lane

Friday, May 31

  • Eastbound auxiliary lanes from the I-5 connector to 16th St.
  • Eastbound Riverside Blvd. onramp
  • Eastbound 15th St. offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • T St. under the US-50 project area
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.

 

Wednesday, May 29

For the week of May 27, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 5 AM)

Wednesday, May 29

  • Eastbound I-5 to 15th St. offramp and auxiliary lane
  • Westbound 16th St. offramp
  • Westbound 10th St. offramp
  • Westbound 15th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Westbound 59th St. onramp
  • Westbound #3 and #4 lanes from 65th St. to 59th St.
  • Westbound 65th St. onramp
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th St. to Occidental Dr.
  • Eastbound #1 and #2 lanes from Occidental Dr. to Watt Ave.

Thursday, May 30

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Stockton Blvd. under the US-50 project area
  • T St. under the US-50 project area
  • Eastbound #1 and #2 lanes from 59th St. to Occidental Dr.

Friday, May 31

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • T St. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Occidental Dr.

Tuesday, May 28

For the week of May 21, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work (9 PM – 5 AM)

Tuesday, May 28

  • Westbound 10th St. offramp
  • Westbound 15th St. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Westbound Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound #3 and #4 lanes from 65th St. to 59th St.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. on- and offramps
  • Eastbound onramp and auxiliary lane from Howe Ave. to Watt Ave.

Wednesday, May 29

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Eastbound #1, #2 and #3 lanes from Watt Ave. to Howe Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. on- and offramps

Thursday, May 30

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Eastbound #1, #2 and #3 lanes from Watt Ave. to Howe Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. on- and offramps
  • Stockton Blvd. under the US-50 project area
  • T St. under the US-50 project area

Friday, May 31

  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd.
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th St. to Watt Ave.
  • Eastbound #1, #2 and #3 lanes from Watt Ave. to Howe Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. on- and offramps

Thursday, May 23

For the week of May 20, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Thursday, May 23 (9PM-5AM)

  • Eastbound Riverside onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 16th St. to Stockton Blvd. 
  • Westbound Stockton Blvd. offramp
  • Auxiliary lane from the 59th St. onramp to the Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Stockton Blvd. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Eastbound #1, #2 and #3 lanes from Watt Ave. to Howe Ave.
  • Eastbound and Westbound Howe Ave. onramp
  • Eastbound Watt Ave. on- and offramps
  • Westbound #3 and #4 lanes from Watt Ave. to Occidental Dr.

Friday, May 24

  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.

Saturday, May 25 – Sunday, May 26

  • No work due to national holiday

 

Wednesday, May 22

For the week of May 20, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Wednesday, May 22 (9PM-5AM)

  • Eastbound Riverside Blvd. onramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Stockton Blvd. offramp
  • Auxiliary lane from the 59th St. onramp to the Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Stockton Blvd. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #3 and #4 lanes from Howe Ave. to 65th St.
  • Westbound Howe Ave. on- and offramps + auxiliary lane

Thursday, May 23 (9PM-5AM)

  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Stockton Blvd. offramp
  • Auxiliary lane from the 59th St. onramp to the Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Stockton Blvd. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Eastbound Watt Ave. offramp
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.

Thursday, May 23 – Sunday, May 26

  • No work due to national holiday

 

Tuesday, May 21

For the week of May 20, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Tuesday, May 21 (9PM-5AM)

  • Eastbound X St. #1 lane from 8th St. to Riverside Blvd.
  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from the 59th St. onramp to the Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound 65th St. onramp
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Stockton Blvd. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Howe Ave. on- and offramps
  • Eastbound Watt Ave. offramp
  • Westbound Howe Ave. onramp and auxiliary lane

Wednesday, May 22 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Stockton Blvd. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound Howe Ave. onramp and auxiliary lane

Thursday, May 23 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Stockton Blvd. under the US-50 project area
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Howe Ave. onramp
  • Eastbound Watt Ave. offramp

 

Monday, May 20

For the week of May 20, 2024, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Monday, May 20 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Eastbound and westbound Howe Ave. onramp
  • Eastbound Watt Ave. offramp
  • Westbound #3 and #4 lanes from 65th Ave. to Stockton Blvd.
  • Westbound 59th St. onramp
  • Westbound 65th St. onramp
  • Westbound Stockton Blvd. offramp
  • Stockton Blvd. under the US-50 project area

Tuesday, May 21 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. offramp
  • Westbound #3 and #4 lanes from 65th Ave. to Stockton Blvd.
  • Westbound 59th St. onramp
  • Westbound 65th St. onramp
  • Westbound Stockton Blvd. offramp
  • Stockton Blvd. under the US-50 project area

Wednesday, May 22 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp and auxiliary lane
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Stockton Blvd. under the US-50 project area

Thursday, May 23 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound and eastbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Stockton Blvd. under the US-50 project area

 

Friday, May 17

This week, May 13 through May 17, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Friday, May 17 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Eastbound and westbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Eastbound and westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.

Saturday, May 18 (9PM-5AM)

  • Eastbound and westbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.

Sunday, May 19 (9PM-5AM)

  • Eastbound #3 and #4 + auxiliary lanes from I-5 to 16th St.
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Eastbound and westbound #1 and #2 lanes from Stockton Blvd. to 26th St.
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound Howe Ave. onramp + auxiliary lane
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Westbound Stockton Blvd. offramp
  • Westbound auxiliary lanes from the 59th St. onramp to the Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound Howe Ave. onramp

 

Thursday, May 16

This week, May 13 through May 17, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Thursday, May 16 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound #3 and #4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound 59th St. onramp
  • Westbound Stockton Blvd. offramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Stockton Blvd. under the US-50 project area
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Eastbound #4 lane from Howe Ave. to Watt Ave.
  • Eastbound Howe Ave. onramp
  • Eastbound Watt Ave. offramp

Friday, May 17 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Eastbound #1 and #2 lanes from 59th St. to Howe Ave.
  • Westbound Howe Ave. onramp + auxiliary lane
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.

Saturday, May 18 (9PM-5AM)

  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.

Sunday, May 19 (9PM-5AM)

  • Westbound Stockton Blvd. offramp
  • Westbound auxiliary lane from 59th St. onramp – Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Westbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Westbound Howe Ave. onramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th St.
  • Stockton Blvd. under the US-50 project area

 

Wednesday, May 15

This week, May 13 through May 17, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Work

Wednesday, May 15 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 16th St. onramp
  • 15th Street offramp
  • Westbound connector from US-50 to southbound 99
  • Westbound #3 and #4 lanes from 34th St. – 26th St.
  • Westbound Stockton Blvd. offramp
  • Westbound auxiliary lane from 59th St. onramp to the Stockton Blvd. offramp
  • Westbound 59th St. onramp
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Westbound #3 and 4 lanes + auxiliary from Howe Ave. to 65th St.
  • Westbound #3 and 4 lanes from 65th St. to Stockton Blvd.
  • Westbound 65th St. onramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Eastbound and westbound #1 and #2 lanes from 26th St. to Stockton Blvd.
  • Howe Ave. on- and offramps

Thursday, May 16 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound Stockton Blvd. offramp
  • Westbound auxiliary lane from 59th St. onramp to the Stockton Blvd. offramp
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Westbound Howe Ave. onramp + auxiliary lane
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Howe Ave. onramp
  • Westbound #1 and 2 lanes from Stockton Blvd. to 34th St.
  • Stockton Boulevard under the Fix 50 project area

Friday, May 17 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound Stockton Blvd. offramp
  • Westbound auxiliary lane from 59th St. onramp to the Stockton Blvd. offramp
  • Westbound Howe Ave. onramp + auxiliary lane
  • Eastbound #1 and #2 lanes from Watt Ave. to Howe Ave.
  • Howe Ave. onramp
  • Westbound #1 and 2 lanes from Stockton Blvd. to 34th St.

 

Monday, May 13

This week, May 13 through May 17, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, and conduct striping activities.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Daytime Work (8:30AM – 5PM)

Tuesday, May 14 through Thursday, May 16

  • Southbound lanes at Folsom Blvd. underneath US-50
  • 10th Street between X St. and W St.

Nighttime Work

Monday, May 13 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Eastbound and westbound Howe Ave. onramps
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on and offramps
  • Eastbound auxiliary lanes from Howe Ave. to Watt Ave.
  • Stockton Blvd. offramp

Tuesday, May 14 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Eastbound and westbound Howe Ave. onramps
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on and offramps
  • Stockton Blvd. offramp

Wednesday, May 15 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Stockton Blvd. underneath US-50
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Eastbound and westbound Howe Ave. onramps
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on and offramps
  • Stockton Blvd. offramp

Thursday, May 16 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Stockton Blvd. underneath US-50
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Eastbound and westbound Howe Ave. onramps
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on and offramps
  • Stockton Blvd. offramp

Friday, May 17 (9PM-5AM)

  • Eastbound auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Westbound #1 and #2 lanes from Stockton Blvd. to 34th Street
  • Eastbound #1 and #2 lanes from 59th Street to Howe Ave.
  • Eastbound and westbound Howe Ave. onramps
  • Westbound #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on and offramps
  • Stockton Blvd. offramp

 

Friday, May 10

This week, May 6 through May 10, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, pour pavement, and conduct striping activities.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Closures:

Friday, May 10

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Boulevard onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue

Westbound

  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street
  • Inside (#1 and 2) lanes from Howe Avenue to 59th Street
  • Howe Avenue onramp and auxiliary lane

Saturday, May 11

Eastbound

  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue

Westbound

  • Inside (#1 and 2) lanes from Howe Avenue to 59th Street
  • Stockton Boulevard offramp

Sunday, May 12

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Boulevard onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue

Westbound

  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street
  • Inside (#1 and 2) lanes from Howe Avenue to 59th Street
  • Howe Avenue onramp and auxiliary lane

 

Thursday, May 9

This week, May 6 through May 10, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, pour pavement, and conduct striping activities.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Closures:

Thursday, May 9

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Boulevard onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • #1, 2 and 3 lanes from Howe Avenue to 59th Street
  • Howe Avenue onramp and auxiliary lane

Other

  • Southbound Folsom Boulevard shoulder
  • 9th Street and 10th Street between X St. and W St
  • Stockton Boulevard near the US-50 project zone
  • Folsom Boulevard near the US-50 project zone

Friday, May 10

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Boulevard onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • Howe Avenue onramp and auxiliary lane

 

Wednesday, May 8

This week, May 6 through May 10, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, pour pavement, and conduct striping activities.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Closures:

Wednesday, May 8:

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on- and offramps
  • Howe Avenue offramps

Other

  • Southbound Folsom Boulevard shoulder
  • 9th Street and 10th Street between X St. and W St.

Thursday, May 9

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • #1, 2 and 3 lanes from Howe Avenue to 59th Street

Other

  • Southbound Folsom Boulevard shoulder
  • 9th Street and 10th Street between X St. and W St.

Friday, May 10

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp

 

Tuesday, May 7

This week, May 6 through May 10, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, pour pavement, and conduct striping activities.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Closures:

Tuesday, May 7:

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Outside (#3 and 4) lanes from 16th Street to 5th Street
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • 9th Street and 10th Street between X St. and W St.
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on- and offramps
  • Howe Avenue offramps
  • Southbound 51 to the westbound US-50 connector (1 AM – 2 AM only)

Other

  • Southbound Folsom Boulevard shoulder
  • 9th Street 
  • 10th Street

Wednesday, May 8

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • 9th Street and 10th Street between X St. and W St.
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on- and offramps
  • Howe Avenue offramps

Thursday, May 9

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • 9th Street and 10th Street between X St. and W St.
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on- and offramps
  • Howe Avenue offramps

Friday, May 10

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • 9th Street and 10th Street between X St. and W St.
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Avenue on- and offramps
  • Howe Avenue offramps

 

Monday, May 6

This week, May 6 through May 10, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, pour pavement, and conduct striping activities.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Closures:

Monday, May 6:

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp
  • Outside lanes on the 59th Street onramp and Stockton Blvd. offramp
  • #1 and #2 lanes from 59th Street to Howe Ave.
  • T Street between X St. and W St.
  • 9th Street and 10th Street between X St. and W St.

Westbound

  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • #1 and #2 lanes from Stockton Blvd to 34th Street
  • #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Howe Ave. onramp
  • Auxiliary lane from Occidental to Hornet Drive

Tuesday, May 7:

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp

Westbound

  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • #1 and #2 lanes from Stockton Blvd to 34th Street
  • #1 and #2 lanes from Stockton Blvd. to 26th Street
  • 9th Street and 10th Street between X St. and W St.
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Ave. onramp
  • Howe Ave. on and offramps

Wednesday, May 8

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp

Westbound

  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • #1 and #2 lanes from Stockton Blvd to 34th Street
  • #1 and #2 lanes from Stockton Blvd. to 26th Street
  • US-50 to SB-99 connector ramp
  • #3 and #4 lanes from Watt Ave. to Howe Ave.
  • Watt Ave. onramp
  • Howe Ave. on and offramps

Thursday, May 9

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp

Westbound

  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • #1 and #2 lanes from Stockton Blvd to 34th Street

Friday, May 10

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Blvd. onramp
  • 15th Street offramp

Westbound

  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Blvd. offramp
  • #1 and #2 lanes from Stockton Blvd to 34th Street

 

Friday, May 3, 2024

Monday, 4/29, through Sunday, 5/5, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Friday, May 3

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

Eastbound

  • #2, 3 and 4 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- and offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Saturday, May 4

  • Westbound #1 and 2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

Sunday, May 5

Westbound

  • Howe Avenue onramp (9 PM – 5 AM)
  • #4 lane from Occidental Drive to Hornet Drive (9 PM – 5 AM)
  • #3 and 4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #3 and 4 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- and offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)

 

Thursday, May 2, 2024

This week, Monday, 4/29, through Friday, 5/3, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Thursday, May 2

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • #1, 2 and 3 lanes from Watt Avenue to Redding Avenue (9 PM – 6 AM)
  • Howe Avenue onramp (9 PM – 8 AM)
  • Hornet Drive onramp (9 PM – 8 AM)

Eastbound

  • Auxiliary lanes from I-5 to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #2, #3, #4 and auxiliary lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- AND offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramps (9 PM – 5 AM)

Other

  • T Street near the Fix50 project zone (9 PM – 5 AM)
  • Folsom Boulevard near the Fix50 project zone (9 PM – 5 AM)

Friday, May 3

Westbound

  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Wednesday, May 1, 2024

This week, Monday, 4/29, through Friday, 5/3, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Thursday, May 2

  • 8th Street, 9th Street, AND 10th Street in the Fix50 work zone (8:30 AM – 3:30 PM)

NIGHTTIME CLOSURES:

Wednesday, May 1

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • Howe Avenue onramp (9 PM – 5 AM)
  • #4 lane from Occidental Drive to Hornet Drive (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to the 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #2, #3, #4 and auxiliary lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- AND offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramps (9 PM – 5 AM)

Other

  • T Street near the Fix 50 project zone (9 PM – 5 AM)

Thursday, May 2

Westbound

  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • Howe Avenue onramp (9 PM – 5 AM)
  • #4 lane from Occidental Drive to Hornet Drive (9 PM – 5 AM)

Eastbound

  • #2, #3, #4 and auxiliary lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- AND offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Other

  • Folsom Boulevard near the Fix50 project zone (9 PM – 5 AM)

Thursday, May 2

Westbound

  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

 

Tuesday, April 30, 2024

This week, Monday, 4/29, through Friday, 5/3, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Wednesday, May 1

  • 8th Street, 9th Street, AND 10th Street in the Fix50 work zone (8:30 AM – 3:30 PM)

NIGHTTIME CLOSURES:

Tuesday, April 30

Westbound

  • Howe Avenue onramp (9 PM – 5 AM)
  • #4 lane from Occidental Drive to Hornet Drive (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • 15th Street onramp (9 PM – 5 AM)
  • #4/auxiliary lane from 15th Street to 8th Street (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to the 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #2, #3, #4 and auxiliary lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- AND offramp (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5 AM)

Other

  • T Street near the Fix50 project zone (9 PM – 5 AM)

Wednesday, May 1

Westbound

  • Howe Avenue onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • #4/auxiliary lane from 15th Street to 8th Street (9 PM – 5 AM)

Eastbound

  • #2, #3, #4 and auxiliary lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- AND offramp (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5 AM)

Other

  • T Street near the Fix50 project zone (9 PM – 5 AM)

Thursday, May 2

Westbound

  • Howe Avenue onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • #4/auxiliary lane from 15th Street to 8th Street (9 PM – 5 AM)

Eastbound

  • #2, #3, #4 and auxiliary lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • 65th Street on- AND offramp (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5 AM)

Other

  • T Street near the Fix50 project zone (9 PM – 5 AM)
  • Folsom Boulevard near the Fix50 project zone (9 PM – 5 AM)

Friday, May 3

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

 

Monday, April 29, 2024

This week, 4/29 – 5/3, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Wednesday, May 1

  • 8th Street, 9th Street, AND 10th Street in the Fix50 work zone (8:30 AM – 3:30 PM)

NIGHTTIME CLOSURES:

Monday, April 29:

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • #4 lane from 15th Street to 8th Street (9 PM – 5 AM)
  • 15th Street onramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • Howe Avenue onramp (9 PM – 5 AM)
  • #4 lane from Occidental Drive to Howe Avenue (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to the 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound 65th Street on- and offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Other

  • T Street near the US-50 project zone (9 PM – 5 AM)

Tuesday, April 30:

Westbound

  • Outside (#3 and 4) lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound 65th Street on- and offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Other

  • T Street near the US-50 project zone (9 PM – 5 AM)

Wednesday, May 1:

Westbound

  • Outside (#3 and 4) lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound 65th Street on- and offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Thursday, May 2:

Westbound

  • Outside (#3 and 4) lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

Other

  • Folsom Boulevard near the US-50 project zone (9 PM – 5 AM)

Friday, May 3:

Westbound

  • Inside (#1 and 2) lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)

 

Friday, April 26, 2024

This weekend, Thursday, 4/25, through Sunday, 4/28, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Monday, April 29

  • 8th Street, 9th Street, AND 10th Street in the Fix50 work zone (8:30 AM – 3:30 PM)

NIGHTTIME CLOSURES:

Friday, April 26

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to the 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound 65th Street on- and offramps (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue offramp (9 PM – 5 AM)

Saturday, April 27

  • Eastbound outside (#3 and 4) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound 65th Street on- and offramps (9 PM – 5 AM)

Sunday, April 28

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to 51st Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Hornet Drive offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramps (9 PM – 5 AM)
  • Inside (#1, 2, and 3) lanes from Stockton Boulevard to 34th Street (9 PM – 5 AM)
  • #4 lane from Occidental Drive to Howe Avenue (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to the 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound 65th Street on- and offramps (9 PM – 5 AM)

 

Thursday, April 25, 2024

This weekend, Thursday, 4/25, through Sunday, 4/28, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Friday, April 26

  • 8th Street, 9th Street, AND 10th Street in the Fix50 work zone (8:30 AM – 3:30 PM)

NIGHTTIME CLOSURES:

Thursday, April 25

Westbound

  • Howe Avenue onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to 51st Street (9 PM – 5 AM)
  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 26th Street to Stockton Boulevard (10 PM – 6 AM)
  • #4  lane from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Friday, April 26

Westbound

  • Howe Avenue onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to 51st Street (9 PM – 5 AM)
  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #1, #2 and #4 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Saturday, April 27

Westbound

  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)

Sunday, April 28

Westbound

  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)

Wednesday, April 24, 2024

This weekend, Monday, 4/22, through Friday, 4/26, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Thursday, April 25

  • 8th Street, 9th Street, AND 10th Street in the Fix50 work zone (8:30 AM – 3:30 PM)

NIGHTTIME CLOSURES:

Wednesday, April 24

Westbound

  • #3 and #4 lanes Watt Avenue to Howe Avenue (9 PM – 5 AM)
  • Watt Avenue onramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 26th Street to Stockton Boulevard (10 PM – 6 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Thursday, April 25

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Friday, April 26

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Saturday, April 27

Westbound

  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)

Sunday, April 28

Westbound

  • #1, #2, and #3 lanes from Stockton Boulevard to 34th Street (9 PM – 5AM)

Tuesday, April 23, 2024

This weekend, Monday, 4/22, through Friday, 4/26, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Tuesday, April 23

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp including auxiliary lanes (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)

Wednesday, April 24

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp including auxiliary lanes (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Thursday, April 25

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Friday, April 26

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • Auxiliary lanes from I-5 to 15th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

 

April 22, 2024

This weekend, Monday, 4/22, through Friday, 4/26, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Wednesday, April 24

  • Southbound on Folsom Boulevard in the Fix50 project area.

NIGHTTIME CLOSURES:

Monday, April 22

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard on- AND offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 39th Street to 26th Street (9 PM – 5 AM)
  • 26th Street offramp (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound HWY-99 (11 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • 15th Street offramp and the auxiliary lane leading to the offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from southbound BUS-80 to eastbound US-50 (11 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Tuesday, April 23

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • 15th Street offramp and the auxiliary lane leading to the offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from southbound BUS-80 to eastbound US-50 (11 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Wednesday, April 24

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from southbound BUS-80 to eastbound US-50 (11 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Thursday, April 25

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from southbound BUS-80 to eastbound US-50 (11 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

Friday, April 26

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • 34th Street offramp (9 PM – 7 AM)
  • Connector from southbound BUS-80 to eastbound US-50 (11 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • Stockton Boulevard in the Fix50 project (9 PM – 5 AM)

 

April 19, 2024

This weekend, Friday, 4/19, through Sunday, 4/21, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic shift activities, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Friday, April 19

Westbound

  • #3 and #4 lanes Howe Avenue to 65th Street (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Howe Avenue onramp AND auxiliary lane (9 PM – 5 AM)
  • Hornet Drive onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard on- AND offramp (9 PM – 8 AM)
  • #3 and #4 lanes Stockton Boulevard to 26th Street (10 PM – 8 AM)
  • Connector from westbound US-50 to southbound HWY-99 (12 AM – 6 AM)
  • Connector from westbound US-50 to northbound BUS-80 (12 AM – 6 AM)
  • 26th Street offramp (9 PM – 7 AM)

Eastbound

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Saturday, April 20

Westbound

  • Howe Avenue onramp, offramp AND auxiliary lane (9 PM – 5 AM)
  • Hornet Drive onramp (9 PM – 5 AM)
  • #3 and #4 lanes Watt Avenue to 65th Street (9 PM – 5 AM)
  • Stockton Boulevard onramp (9 PM – 8 AM)
  • #3 and #4 lanes Stockton Boulevard to 26th Street (10 PM – 8 AM)
  • Connector from westbound US-50 to southbound HWY-99 (12 AM – 6 AM)
  • Connector from westbound US-50 to northbound BUS-80 (12 AM – 6 AM)
  • 26th Street offramp (9 PM – 7 AM)

Sunday, April 21

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • #3 and #4 lanes 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound HWY-99 (12 AM – 6 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 26th Street onramp (9 PM – 8 AM)
  • #3 and #4 lanes from 26th Street to Stockton Boulevard (10 PM – 3 AM)
    • Switch to #1 and #2 lanes (3 AM – 8 AM)
  • 34th Street onramp (9 PM – 7 AM)
  • Connector from southbound BUS-80 to eastbound US-50 (11 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

April 18, 2024

This week, Monday, 4/15, through Friday, 4/19, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Blvd exit is now “EXIT ONLY” for Stockton Blvd. The lane has been re-striped and additional signage will be installed to indicate the “Exit Only” status.

REMINDER: There are four traffic splits on westbound US-50, which are planned to be in place through early summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Thursday, April 18

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard on- and offramps (9 PM – 5 AM)
  • Howe Avenue onramp and auxiliary lane (9 PM – 5 AM)
  • Hornet Drive onramp (9 PM – 5 AM)
  • 65th Street to Stockton Boulevard (9 PM – 5 AM)
    • #1 and #2 lanes (left side of split)
    • #3 lane (right side of split)
  • Connector from westbound US-50 to southbound 99 (11 PM – 5 AM)
  • Connector from BUS-80 to southbound 99 (12 AM – 4 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1, 2 and 3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, April 19

Westbound

  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard  offramp (9 PM – 5 AM)
  • Howe Avenue onramp and auxiliary lane (9 PM – 5 AM)
  • Hornet Drive onramp (9 PM – 5 AM)
  • 65th Street to Stockton Boulevard (9 PM – 5 AM)
    • #1 and #2 lanes (left side of split)
    • #3 lane (right side of split)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1, 2 and 3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)

April 17, 2024

This week, Monday, 4/15, through Friday, 4/19, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform traffic split activities, assess drainage, pour concrete and prepare for paving work.

NOTICE: A new traffic switch is planned to be in place starting Monday, April 15 for 12-13 days (weather-dependent). Details coming soon.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Thursday, April 18

  • 9th Street near the US-50 project zone (9 AM – 5 PM)
  • 10th Street near the US-50 project zone (9 AM – 5 PM)

NIGHTTIME CLOSURES:

Wednesday, April 17

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard on- and offramps (9 PM – 5 AM)
  • Howe Avenue onramp and auxiliary lane (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 26th Street offramp (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound 99 (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • #1, 2 and 3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, April 18

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard onramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1, 2 and 3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, April 19

Westbound

  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard onramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1, 2 and 3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

April 16, 2024

This week, Monday, 4/15, through Friday, 4/19, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

NOTICE: A new traffic switch is planned to be in place starting Monday, April 15 for 12-13 days (weather-dependent). Details coming soon.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

DAYTIME CLOSURES:

Wednesday, April 17

  • 8th Street near the US-50 project zone (9 AM – 5 PM)

NIGHTTIME CLOSURES:

Tuesday, April 16

Westbound

  • Outside (#3 and 4) lanes from Hornet Drive to 59th Street (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 26th Street on- and offramps (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound 99 (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)
  • 34th Street offramp (9 PM – 5 AM)
  • Howe Avenue onramp and auxiliary lane (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • 34th Street offramp (9 PM – 5 AM)
  • 26th Street offramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 26th Street to Stockton Boulevard (9 PM – 5 AM)

Wednesday, April 17

Westbound

  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, April 18

Westbound

  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, April 19

Westbound

  • Outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

 

April 15, 2024

This week, Monday, 4/15, through Friday, 4/19, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform traffic split activities, assess drainage, pour concrete and prepare for paving work.

NOTICE: A new traffic switch is planned to be in place starting Monday, April 15 for 12-13 days (weather-dependent). Details coming soon.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Monday, April 15

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Watt Avenue onramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 26th Street on- and offramps (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound 99 (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)
  • 34th Street offramp (9 PM – 5 AM)
  • Howe Avenue onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 26th Street to Stockton Boulevard (9 PM – 5 AM)

Tuesday, April 16

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 26th Street on- and offramps (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound 99 (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)
  • 34th Street offramp (9 PM – 5 AM)
  • Howe Avenue onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • Outside (#3 and 4) lanes from 26th Street to Stockton Boulevard (9 PM – 5 AM)

Wednesday, April 17

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

Thursday, April 18

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

Friday, April 19

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)

Eastbound

  • Outside (#3 and 4) lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

April 12, 2024

This week, Monday, 4/8, through Friday, 4/12, lane and ramp closures are expected to continue along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

NOTICE: A new traffic switch is planned to be in place starting Monday, April 15 for 12-13 days (weather-dependent). Details coming soon.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Friday, April 12

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Sunday, April 14

Westbound

  • #3 and #4 lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street offramp (9 PM – 5 AM)
  • 34th Street offramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #3 and #4 lanes from 26th Street to Stockton Boulevard (9 PM – 5AM)

Other

  • #3 lane of northbound Howe Avenue in the Fix50 project area (9 PM – 5 AM)

April 11, 2024

This week, Monday, 4/8, through Friday, 4/12, assorted lane and ramp closures are planned along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

NOTICE: A new traffic switch is planned to be in place starting April 15 for 12-13 days (weather-dependent). Details coming soon.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Thursday, April 11

Westbound

  • #2, #3 and #4 lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • #3 and #4 lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street offramp (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound 99 (9 PM – 5 AM)
  • #3 and #4 lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Friday, April 12

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

April 10, 2024

This week, Monday, 4/8, through Friday, 4/12, assorted lane and ramp closures are planned along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Wednesday, April 10

Westbound

  • #1, #2 and #3 lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • Watt Avenue on- AND offramp (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street offramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Thursday, April 11

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)
  • Stockton Boulevard near the Fix50 project zone (9 PM – 5 AM)

Friday, April 12

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 16th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

April 9, 2024

This week, Monday, 4/8, through Friday, 4/12, assorted lane and ramp closures are planned along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Tuesday, April 9

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard on- AND offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Wednesday, April 10

Westbound

  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street on- AND offramp (9 PM – 5 AM)
  • 34th Street onramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (11 PM – 5 AM)
  • Connector from northbound HWY-99 (11 PM – 5 AM)
  • Connector to northbound BUS-80 (12 AM – 4 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Thursday, April 11

Westbound

  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street on- AND offramp (9 PM – 5 AM)
  • 34th Street onramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (11 PM – 5 AM)
  • Connector from northbound HWY-99 (11 PM – 5 AM)
  • Connector to northbound BUS-80 (12 AM – 4 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)
  • Stockton Boulevard near the Fix50 project zone (9 PM – 5 AM)

Friday, April 12

Westbound

  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street on- AND offramp (9 PM – 5 AM)
  • 34th Street onramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (11 PM – 5 AM)
  • Connector from northbound HWY-99 (11 PM – 5 AM)
  • Connector to northbound BUS-80 (12 AM – 4 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

April 8, 2024

This week, Monday, 4/8, through Friday, 4/12, assorted lane and ramp closures are planned along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Monday, April 8

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Tuesday, April 9

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Wednesday, April 10

Westbound

  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street on- AND offramp (9 PM – 5 AM)
  • 34th Street onramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (11 PM – 5 AM)
  • Connector from northbound HWY-99 (11 PM – 5 AM)
  • Connector to northbound BUS-80 (12 AM – 4 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)

Thursday, April 11

Westbound

  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • Howe Avenue on- AND offramp (9 PM – 5AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street on- AND offramp (9 PM – 5 AM)
  • 34th Street onramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (11 PM – 5 AM)
  • Connector from northbound HWY-99 (11 PM – 5 AM)
  • Connector to northbound BUS-80 (12 AM – 4 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

Other

  • #3 lane on northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)
  • Stockton Boulevard near the Fix50 project zone (9 PM – 5 AM)

Friday, April 12

Westbound

  • #3 and #4 lanes from 65th Street to 26th Street (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • 26th Street on- AND offramp (9 PM – 5 AM)
  • 34th Street onramp (9 PM – 5 AM)
  • Connector to southbound HWY-99 (11 PM – 5 AM)
  • Connector from northbound HWY-99 (11 PM – 5 AM)
  • Connector to northbound BUS-80 (12 AM – 4 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

 

April 5, 2024

This week, April 2 through April 5, expect lane and ramp closures along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Friday, April 5

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • Connector from eastbound US-50 to southbound 99 AND northbound BUS-80 (11 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Sunday, April 7

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- AND offramps (9 PM – 5AM)

Eastbound

  • #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound AND southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)

 

April 4, 2024

This week, April 2 through April 5, expect lane and ramp closures along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Thursday, April 4

Westbound

  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)
  • Watt Avenue onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM

Eastbound

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)

Other

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)

Friday, April 5

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)

Eastbound

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • Connector from eastbound US-50 to southbound 99 and northbound BUS-80 (11 PM – 5 AM)

Other

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)

 

April 3, 2024

This week, April 2 through April 5, expect lane and ramp closures along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform demolition work, traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early Summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Wednesday, April 3

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)

Eastbound

  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • Eastbound US-50 to southbound HWY-99 connector ramp (11 PM – 5 AM)
  • Eastbound US-50 to Business 80 connector ramp (11 PM – 5 AM)

Other

  • #3 lane on Howe Avenue (9 PM – 5 AM)

Thursday, April 4

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard (right side of split) (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)

Eastbound

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)

Other

  • #3 lane on Howe Avenue (9 PM – 5 AM)

Friday, April 5

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Boulevard [right side of split] (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Boulevard offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)
  • #1 and #2 lanes from Howe Avenue to 59th Street (9 PM – 5 AM)

Eastbound

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Boulevard onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)

Other

  • #3 lane on Howe Avenue (9 PM – 5 AM)

April 2, 2024

This week, April 2 through April 5, expect lane and ramp closures along US-50 in Sacramento. Nearby residents can expect loud construction noise as contractors perform traffic split activities, assess drainage, pour concrete and prepare for paving work.

REMINDER: There are three traffic splits on westbound US-50, which are planned to be in place through early summer 2024. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

NIGHTTIME CLOSURES:

Tuesday, April 2

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Blvd. (right side of split) (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Blvd. offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)
  • #3 lane on Howe Avenue (9 PM – 5 AM)
  • Watt Avenue onramp (9 PM – 5 AM)
  • Redding Avenue near US-50 (9 PM – 5 AM)

Eastbound

  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Blvd. onramp (9 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • EB US-50 to SB-99 connector ramp (11 PM – 5 AM)
  • EB US-50 to Business 80 connector ramp (11 PM – 5 AM)

Wednesday, April 3

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Blvd. (right side of split) (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Blvd. offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)
  • #3 lane on Howe Avenue (9 PM – 5 AM)

Eastbound

  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Blvd. onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • EB US-50 to SB-99 connector ramp (11 PM – 5 AM)
  • EB US-50 to Business 80 connector ramp (11 PM – 5 AM)
  • #1, #2 and #3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, April 4

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Blvd. (right side of split) (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Blvd. offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)
  • #3 lane on Howe Avenue (9 PM – 5 AM)

Eastbound

  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Blvd. onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • #1, #2 and #3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, April 5

Westbound

  • #3 and #4 lanes from 65th Street to Stockton Blvd. (right side of split) (9 PM – 5 AM)
  • 59th Street onramp (9 PM – 5 AM)
  • 65th Street onramp (9 PM – 5 AM)
  • Stockton Blvd. offramp (9 PM – 5 AM)
  • Howe Avenue on- and offramp (9 PM – 5 AM)
  • #3 lane on Howe Avenue (9 PM – 5 AM)
  • #1 and #2 lanes from Howe Avenue to 59th Street (9 PM – 5 AM)

Eastbound

  • #2, #3 and #4 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Riverside Blvd. onramp (9 PM – 5 AM)
  • Northbound and southbound I-5 connector ramps to eastbound US-50 (11 PM – 5 AM)
  • 15th Street offramp (9 PM – 5 AM)
  • 16th Street onramp (9 PM – 5 AM)
  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

 

March 29, 2024

Tonight, Friday, 3/29, the following lane, ramp, and street closures are scheduled to continue on and around US-50 in Sacramento. Residents can expect loud construction noises as work is underway in the project area near Folsom Boulevard.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND the far left side and median of westbound US-50 between 26th Street and the I-5 connectors.

Motorists should prepare to stay in the left-hand lane(s) prior to driving on eastbound US-50 and the right-hand lane(s) ahead of driving on westbound US-50 between the I-5 connectors and 26th Street.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Daytime Closures

Friday, March 29:

Other Closures

  • Folsom Boulevard near the Fix50 project area (3 PM – 11 PM)

Nighttime Closures

Friday, March 29:

Westbound Closures

  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)

Monday, April 1:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from 59th Street to 34th Street (9 PM – 5 AM)
  • Connector from westbound US-50 to southbound HWY-99 (11 PM – 5 AM)
  • Connector from westbound US-50 to northbound BUS-80 (12 AM – 4 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 34th Street to 59th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)
  • Stockton Boulevard near the Fix50 project area (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

March 28, 2024

Tonight, Thursday, 3/28, the following lane, ramp, and street closures are scheduled to continue on and around US-50 in Sacramento. Residents can expect loud construction noises as work is underway in the project area near Folsom Boulevard.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND the far left side and median of westbound US-50 between 26th Street and the I-5 connectors.

Motorists should prepare to stay in the left-hand lane(s) prior to driving on eastbound US-50 and the right-hand lane(s) ahead of driving on westbound US-50 between the I-5 connector and 26th Street.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Daytime Closures

Wednesday, March 27, and Thursday, March 28:

Other Closures

  • Folsom Boulevard near the Fix50 project area (3 PM – 11 PM)

Nighttime Closures

Thursday, March 28:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from Watt Avenue to Redding Avenue (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue onramp (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)
  • Westbound Hornet Drive onramp (9 PM – 5 AM)
  • The left turn lane of the westbound Howe Avenue offramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Connector from southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)
  • Folsom Boulevard near the US-50 project area (9 PM – 5 AM)
  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Friday, March 29:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from Watt Avenue to Redding Avenue (9 PM – 6 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue [right side of split] (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)
  • Westbound Hornet Drive onramp (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)
  • Folsom Boulevard near the US-50 project area (9 PM – 5 AM)

Monday, April 1:

Westbound Closures

  • Westbound Howe Avenue offramp (12 AM – 6 AM)

 

March 27, 2024

Tonight, Wednesday, 3/27, assorted lane, ramp, and street closures are scheduled to continue on and around US-50 in Sacramento. Residents can expect loud construction noises as work is underway in the project area near Folsom Boulevard.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND westbound US-50 between 26th Street and the I-5 connectors.

Motorists should prepare to stay in the left-hand lane(s) prior to driving on US-50 in either direction between the I-5 connector and 26th Street.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Daytime Closures

Wednesday, March 27, and Thursday, March 28:

Other Closures

  • Folsom Boulevard near the Fix50 project area (3 PM – 11 PM)

Nighttime Closures

Wednesday, March 27:

Westbound Closures

  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Stockton Boulevard to 26th Street (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound outside (#3, 4 and 5) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Connector from southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)
  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Thursday, March 28:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)
  • Westbound inside (#1, 2 and 3) lanes from Watt Avenue to Redding Avenue (9 PM – 6 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Connector from southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)
  • Folsom Boulevard near the US-50 project area (9 PM – 5 AM)

Friday, March 29:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)
  • Westbound inside (#1, 2 and 3) lanes from Watt Avenue to Redding Avenue (9 PM – 6 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue [right side of split] (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)
  • Folsom Boulevard near the US-50 project area (9 PM – 5 AM)

 

March 26, 2024

Tonight, Tuesday, 3/26, assorted lane, ramp, and street closures are scheduled to continue on and around US-50 in Sacramento. Residents can expect loud construction noises as work is underway in the project area near Folsom Boulevard.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND westbound US-50 between 26th Street and the I-5 connectors.

Motorists should prepare to stay in the left-hand lane(s) prior to driving on US-50 in either direction between the I-5 connector and 26th Street.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Daytime Closures

Wednesday, March 27, and Thursday, March 28:

Other Closures

  • Folsom Boulevard near the Fix50 project area (3 PM – 11 PM)

Nighttime Closures

Tuesday, March 26:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Connector from BUS-80 to eastbound US-50 (11 PM – 4 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Redding Avenue near the Fix50 project area (9 PM – 5 AM)

Wednesday, March 27:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (9 PM – 5 AM)
  • Westbound outside (#3, 4 and 5) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Redding Avenue near the Fix50 project area (9 PM – 5 AM)

Thursday, March 28:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Stockton Boulevard to 65th Street (9 PM – 5 AM)
  • Westbound inside (#1, 2 and 3) lanes from Watt Avenue to Redding Avenue (9 PM – 6 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from Stockton Boulevard to 59th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound AND southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Stockton Boulevard near the Fix50 project area (9 PM – 5 AM)
  • Folsom Boulevard near the Fix50 project area (9 PM – 5 AM)

Friday, March 29:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from Watt Avenue to Redding Avenue (9 PM – 6 AM)
  • Westbound outside (#3 and 4) lanes from Stockton Boulevard to 65th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound AND southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Folsom Boulevard near the Fix50 project area (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

March 25, 2024

Tonight, Monday, 3/25, assorted lane, ramp, and street closures are scheduled on and around US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND westbound US-50 between 26th Street and the I-5 connectors.

Motorists should prepare to stay in the left-hand lane(s) prior to driving on US-50 in either direction between the I-5 connector and 26th Street.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Daytime Closures

Wednesday, March 27, and Thursday, March 28:

Other Closures

  • Folsom Boulevard near the Fix50 project area (3 PM – 11 PM)

Nighttime Closures

Monday, March 25:

Westbound Closures

  • Westbound inside (#1 and 2) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Redding Avenue near the Fix50 project area (9 PM – 5 AM)

Tuesday, March 26:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Connector from BUS-80 to eastbound US-50 (11 PM – 4 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)

Wednesday, March 27:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (9 PM – 5 AM)
  • Westbound outside (#3, 4 and 5) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Connector from northbound HWY-99 to eastbound US-50 (11 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)

Thursday, March 28:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Stockton Boulevard to 65th Street (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from Stockton Boulevard to 59th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound AND southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Stockton Boulevard near the Fix50 project area (9 PM – 5 AM)
  • Folsom Boulevard near the Fix50 project area (9 PM – 5 AM)

Friday, March 29:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Stockton Boulevard to 65th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound AND southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)

Other Closures

  • #3 lane of northbound Howe Avenue near the Fix50 project area (9 PM – 5 AM)
  • Folsom Boulevard near the Fix50 project area (9 PM – 5 AM)

 

March 22, 2024

Tonight, Friday, 3/22, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND westbound US-50 between 26th Street and the I-5 connectors. Motorists should prepare to stay in the left-hand lane(s) prior to driving on US-50 in either direction between the I-5 connector and 26th Street

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Daytime Closures

Monday, March 25 through Wednesday, March 27:

Other Closures

  • Folsom Boulevard near the Fix50 project area (3 PM – 11 PM)

Nighttime Closures

Friday, March 22:

Westbound Closures

  • Westbound 15th Street onramp and merge lane through to the I-5 connector (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)

Other Closures

  • The #3 lane of northbound Howe Avenue in the Fix50 project zone (9 PM – 5 AM)

Sunday, March 24:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound inside (#1, 2 and 3) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1, 2 and 3) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • The #3 lane of northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)
  • Redding Avenue near the Fix50 project zone (9 PM – 5 AM)

 

March 21, 2024

Tonight, Thursday, 3/21, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND westbound US-50 between 26th Street and the I-5 connectors. Motorists should prepare to stay in the left-hand lane(s) prior to driving on US-50 in either direction between the I-5 connector and 26th Street

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Nighttime Closures

Thursday, March 21:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue – 59th Street (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Connector from southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • The #3 lane of northbound Howe Avenue in the Fix50 project zone (9 PM – 5 AM)

Friday, March 22:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • The #3 lane of northbound Howe Avenue in the Fix50 project zone (9 PM – 5 AM)

Sunday, March 24:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • The #3 lane of northbound Howe Avenue near the Fix50 project zone (9 PM – 5 AM)
  • Redding Avenue near the Fix50 project zone (9 PM – 5 AM)

 

March 20, 2024

Tonight, Wednesday, 3/20, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

REMINDER: An adjusted traffic shift is now in place allowing crews to work on the far-right side and shoulder of eastbound AND westbound US-50 between 26th Street and the I-5 connectors. Motorists should prepare to stay in the left-hand lane(s) prior to driving on US-50 in either direction between the I-5 connector and 26th Street

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Nighttime Closures

Wednesday, March 20:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Westbound inside (#1 and 2) lanes from 59th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue – 59th Street (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Connector from southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, March 21:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Westbound inside (#1 and 2) lanes from 59th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue – 59th Street (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Connector from southbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project zone (9 PM – 5 AM)

Friday, March 22:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project zone (9 PM – 5 AM)

 

March 19, 2024

Tonight, Tuesday, 3/19, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Nighttime Closures

Tuesday, March 19

Westbound Closures

  • Westbound outside (#2, 3 and 4) lanes from 26th to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Connector ramp from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Offramp from westbound US-50 to Stockton Blvd. (9 PM – 5 AM)
  • Westbound outside (#3 and #4) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • On- and offramps from westbound US-50 to Howe Avenue (9 PM – 6 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 5th Street to 26th Street (10 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 34th Street to 59th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and #2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project zone (9 PM – 5 AM)

Wednesday, March 20:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Westbound inside (#1 and 2) lanes from 59th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project zone (9 PM – 5 AM)

Thursday, March 21:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Westbound inside (#1 and 2) lanes from 59th Street to Stockton Boulevard (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Boulevard onramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project zone (9 PM – 5 AM)

Friday, March 22:

Westbound Closures

  • Westbound inside (#1, 2 and 3) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project zone (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

Monday, March 18

Tonight, Monday, 3/18, lane and ramp closures are scheduled to continue along US-50 in Sacramento. Nearby residents can expect loud construction noises as work is underway.

#BeWorkZoneAlert and always slow to 55 MPH in the work zone.

Nighttime Closures

Monday, March 18:

  • Westbound #3 and #4 lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Onramp from 15th Street to westbound US-50 (9 PM – 5 AM)
  • Offramps from westbound US-50 to 10th Street and 16th Street (9 PM – 5 AM)
  • Offramp from westbound US-50 to 26th Street (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Connector ramp from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Eastbound #1 and #2 lanes from 5th Street to 26th Street (10 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 34th Street to 59th Street (9 PM – 5 AM)
  • Offramp from westbound US-5- to Stockton Blvd. (9 PM – 5 AM)
  • Westbound #3 and #4 lanes from 59th Street to Stockton Blvd (9 PM – 5 AM)
  • Westbound #2, #3 and #4 lanes from Hornet Drive to 65th Street (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • On- and offramps from westbound US-50 to Howe Avenue (9 PM – 6 AM)

Tuesday, March 19

  • Westbound #3 and #4 lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Onramp from 15th Street to westbound US-50 (9 PM – 5 AM)
  • Offramps from westbound US-50 to 10th Street and 16th Street (9 PM – 5 AM)
  • Offramp from westbound US-50 to 26th Street (9 PM – 5 AM)
  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Connector ramp from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Eastbound #1 and #2 lanes from 5th Street to 26th Street (10 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 34th Street to 59th Street (9 PM – 5 AM)
  • Offramp from westbound US-5- to Stockton Blvd. (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • On- and offramps from westbound US-50 to Howe Avenue (9 PM – 6 AM)
  • Onramp from 65th Street to westbound US-50 (9 PM – 5 AM)
  • Connector ramps from northbound SR-99 to westbound and eastbound US-50 (9 PM – 5 AM)
  • Westbound #1, #2 and #3 lanes from Howe Ave. to 59th Street (9 PM – 5 AM)

Wednesday, March 20:

  • Connector ramp from SB-51 to westbound US-50 (11 PM – 4 AM)
  • Eastbound #1 and #2 lanes from 34th Street to 59th Street (9 PM – 5 AM)
  • Offramp from westbound US-5- to Stockton Blvd. (9 PM – 5 AM)
  • Westbound #2, #3 and #4 lanes from Hornet Drive to 65th Street (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • On- and offramps from westbound US-50 to Howe Avenue (9 PM – 6 AM)
  • Onramp from 65th Street to westbound US-50 (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Westbound #1 and #2 lanes from 26th Street to 5th Street (9 PM – 5 AM)

Thursday, March 21:

  • Eastbound #1 and #2 lanes from 34th Street to 59th Street (9 PM – 5 AM)
  • Offramp from westbound US-5- to Stockton Blvd. (9 PM – 5 AM)
  • Westbound #2, #3 and #4 lanes from Hornet Drive to 65th Street (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • On- and offramps from westbound US-50 to Howe Avenue (9 PM – 6 AM)
  • Onramp from 65th Street to westbound US-50 (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 5th Street to 26th Street (9 PM – 5 AM)
  • Westbound #3 and #4 lanes from Stockton Blvd. to 26th Street (9 PM – 5 AM)
  • Offramp from westbound US-50 to 26th Street (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

March 15, 2024

Tonight, Friday, 3/15, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

REMINDER: An extended traffic shift is currently in place through Sunday, March 17 along eastbound and westbound US-50 from 8 PM to 6 AM . Full details available HERE.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Friday, March 15:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 4 AM)
  • Connector from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 51st Street to Howe Avenue (9 PM – 5 AM)

Sunday, March 17:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 6 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from 6th Street to 26th Street (9 PM – 5 AM)
  • Eastbound Riverside Avenue onramp (9 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)
  • Connector from northbound I-5 to eastbound US-50 (11 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 34th Street to Stockton Boulevard (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane of Howe Avenue in the project area (9 PM – 6 AM)
  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

March 14, 2024

Tonight, Thursday, 3/14, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

REMINDER: An extended traffic shift is scheduled to be placed tonight, Thursday, March 14, through Sunday, March 17 along eastbound and westbound US-50 from 8 PM to 6 AM . Full details available HERE.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Thursday, March 14:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 5 AM)
  • Connector from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 6 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane of Howe Avenue in the project area (9 PM – 6 AM)

Sunday, March 17:

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

 

 

March 13, 2024

Tonight, Wednesday, 3/13, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Wednesday, March 13:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 PM – 4 AM)
  • Connector from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (9 PM –  5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 6 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane of Howe Avenue in the project area (9 PM – 6 AM)

Thursday, March 14:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 5 AM)
  • Connector from westbound US-50 to northbound I-5 (11 PM – 4 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramp (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 6 AM)

Other Closures

  • Northbound #3 lane of Howe Avenue in the project area (9 PM – 6 AM)

 

 

March 12, 2024

Tonight, Tuesday, 3/12, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Tuesday, March 12:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 6 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)

Wednesday, March 13:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (9 PM – 6 AM)
  • Westbound Watt Avenue onramp (9 PM – 6 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)

Thursday, March 14:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 5 AM)

 

March 11, 2024

Tonight, Monday, 3/11, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Monday, March 11:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 8th Street (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Connector from northbound HWY-99 to westbound US-50 (11 AM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 34th Street to Stockton Boulevard (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Northbound #3 lane at Howe Avenue (9 PM – 5 AM)

Tuesday, March 12:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

Wednesday, March 13:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (9 PM –  5 AM)
  • Westbound 59th Street onramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (9 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

March 8, 2024

Tonight, Friday, 3/8, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

NOTICE: The anticipated nighttime work from Friday, 3/8, at 9PM to Saturday, 3/9, at 8AM will reduce westbound US-50 to one lane.

This work is required to perform repairs to the bridge over Folsom Boulevard near State University Drive.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Friday, March 8:

Westbound Closures

  • Westbound #1, #2 and #3 lanes from Watt Avenue to 65th Street (9PM – 8AM)
  • Westbound #3 and #4 lanes from 26th Street to the I-5 connector (10PM – 5AM)
  • Connector from northbound HWY-99 to westbound US-50 (12AM – 6AM)
  • Westbound 15th Street onramp (9PM – 5AM)
  • Westbound 10th Street offramp (9PM – 5AM)
  • Westbound 16th Street offramp (9PM – 5AM)
  • Westbound Stockton Boulevard offramp (9PM – 5AM)
  • Westbound Howe Avenue onramp (9PM – 8AM)
  • Westbound Hornet Drive onramp (9PM – 8AM)

Eastbound Closures

  • Connector from southbound HWY-99 to eastbound US-50 (12AM – 6AM)
  • Eastbound #1, #2 and #3 lanes from 39th Street to 59th Street (11PM – 5AM)
  • Eastbound Stockton Boulevard onramp (9PM – 5AM)
  • Eastbound 59th Street offramp (9PM – 5AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 8AM)

Sunday, March 10:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Connector from westbound US-50 to southbound HWY-99 (11PM – 5AM)
  • Connector from northbound HWY-99 to westbound US-50 (11PM – 5AM)
  • Westbound Stockton Boulevard offramp (9PM – 5AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

March 7, 2024

Tonight, Thursday, 3/7, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

NOTICE: The anticipated nighttime work from Friday, 3/8, at 9PM to Saturday, 3/9, at 8AM will reduce westbound US-50 to one lane.

This work is required to perform repairs to the bridge over Folsom Boulevard near State University Drive.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Thursday, March 7:

Westbound Closures

  • Westbound #3 and #4 lanes from 16th Street to 5th Street (10PM – 5AM)
  • Westbound #3 and #4 lanes from Stockton Boulevard to 16th Street (9PM – 6AM)
  • Westbound #3 and #4 lanes from Howe Avenue to Stockton Boulevard (9PM – 6AM)
  • #2 lane of the connector from westbound US-50 to northbound I-5
  • Westbound 15th Street onramp (9PM – 5AM)
  • Westbound 10th Street offramp (9PM – 6AM)
  • Westbound 16th Street offramp (9PM – 6AM)
  • Westbound Stockton Boulevard offramp (9PM – 5AM)
  • Westbound Howe Avenue onramp and offramp (9PM – 6AM)

Eastbound Closures

  • Connector from eastbound US-50 to northbound HWY-99 (11PM – 5AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Other Closures

  • Northbound #3 lane of Howe Avenue (9PM – 6 AM)

Friday, March 8:

Westbound Closures

  • Westbound #1, #2 and #3 lanes from Watt Avenue to 65th Street (9PM – 8AM)
  • Westbound #3 and #4 lanes from 16th Street to 5th Street (10PM – 5AM)
  • Westbound #3 and #4 lanes from Stockton Boulevard to 26th Street (9PM – 5AM)
  • #2 lane of the connector from westbound US-50 to northbound I-5
  • Westbound 15th Street onramp (9PM – 5AM)
  • Westbound 10th Street offramp (9PM – 6AM)
  • Westbound 16th Street offramp (9PM – 6AM)
  • Westbound 26th Street offramp (9PM – 5AM)
  • Westbound Howe Avenue onramp (9PM – 8AM)
  • Westbound Hornet Drive onramp (9PM – 8AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 8AM)

 

March 6, 2024

Tonight, Wednesday, 3/6, lane and ramp closures are scheduled to continue along US-50 in Sacramento.

NOTICE: The anticipated nighttime work from Friday, 3/8, at 9PM to Saturday, 3/9, at 8AM will reduce westbound US-50 to one lane.

This work is required to perform repairs to the bridge over Folsom Boulevard near State University Drive.

#BeWorkZoneAlert and slow to 55 MPH in the work zone.

Nighttime Closures

Wednesday, March 6:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound Stockton Boulevard offramp (9PM – 5AM)
  • Westbound Howe Avenue onramp (9PM – 5 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 26th Street to 59th Street (9PM – 5AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 5AM)

Thursday, March 7:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound #3 and #4 lanes from Stockton Boulevard to 26th Street (9PM – 5AM)
  • Westbound 26th Street offramp (9PM – 5AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 5AM)

Friday, March 8:

Westbound Closures

  • Westbound #2, #3 and #4 lanes from Occidental Drive to 65th Street  (9PM – 8AM)
  • Westbound Howe Avenue onramp (9PM – 8AM)
  • Westbound Hornet Drive onramp (9PM – 8AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 8AM)

 

March 5, 2024

Tonight, Tuesday, 3/5, lane and ramp closures are scheduled along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures

Tuesday, March 5:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound 15th Street onramp (9PM – 5AM)
  • Westbound 10th Street offramp (9PM – 6AM)
  • Westbound 16th Street offramp (9PM – 6AM)
  • Westbound Stockton Boulevard offramp (9PM – 5AM)

Eastbound Closures

    • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)
    • Eastbound #1 and #2 lanes from 26th Street to 59th Street (9PM – 5AM)
    • Eastbound Stockton Boulevard onramp (9PM – 5AM)

Wednesday, March 6:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound #3 and #4 lanes from Stockton Boulevard to 26th Street (9PM – 5AM)
  • Westbound 26th Street offramp (9PM – 5 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 8AM)

Thursday, March 7:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Friday, March 8:

Westbound Closures

  • Westbound #2, #3 and #4 lanes from Occidental Drive to 65th Street  (9PM – 6AM)
  • Westbound Howe Avenue onramp (9PM – 8AM)
  • Westbound Hornet Drive onramp (9PM – 8AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 8AM)

 

March 4, 2024

Tonight, Monday, 3/4, lane and ramp closures are scheduled along US-50 in Sacramento. #BeWorkZoneAlert

Daytime Closures: 

Tuesday, March 5:

  • Westbound 10th Street offramp (6AM – 9PM)

Nighttime Closures: 

Monday, March 4:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound 10th Street offramp (9PM – 6AM)
  • Westbound 16th Street offramp (9PM – 6AM)
  • Westbound Howe Avenue offramp (10PM – 5 AM)
  • Westbound Watt Avenue onramp (10PM – 5AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Tuesday, March 5:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound #3 and #4 lanes from Stockton Boulevard to 26th Street (9PM – 5AM)
  • Westbound 10th Street offramp (9PM – 6AM)
  • Westbound 16th Street offramp (9PM – 6AM)
  • Westbound 26th Street offramp (9PM – 5 AM)

Eastbound Closures

    • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Wednesday, March 6:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  • Westbound #3 and #4 lanes from Stockton Boulevard to 26th Street (9PM – 5AM)
  • Westbound 26th Street offramp (9PM – 5 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Thursday, March 7:

Westbound Closures

  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (9PM – 5AM)
  •  

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9PM – 5AM)

Friday, March 8:

Westbound Closures

  • Westbound #2, #3 and #4 lanes from Occidental Drive to 65th Street  (9PM – 6AM)
  • Westbound Howe Avenue onramp (9PM – 8AM)
  • Westbound Hornet Drive onramp (9PM – 8AM)

Other Closures

  • Folsom Boulevard around the Fix50 project zone (9PM – 8AM)

 

February 29, 2024

Tonight, Thursday, 2/29, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Thursday, February 29:

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Sunday, March 3:

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

 

February 28, 2024

Tonight, Wednesday, 2/28, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Wednesday, February 28:

Westbound Closures

  • Westbound #1 and #2 lanes between Howe Avenue and 59th Street (8 PM – 5 AM)
  • Westbound #1, #2 and #3 lanes between 16th Street and Watt Avenue (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound HWY-99 (11 PM – 4 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 16th Street offramp (9 PM – 5 AM)\
  • Westbound 10th Street offramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound #1, #2 and #3 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)
  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

 

February 27, 2024

Tonight, Tuesday, 2/27, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Tuesday, February 27:

Westbound Closures

  • Connector between westbound US-50 and southbound HWY-99 (11 PM – 4 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound #1 and #2 lanes from Howe Avenue to 59th Street (8 PM – 5 AM)
  • Westbound #1 and #2 lanes from Watt Avenue to 65th Street (8 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound #1, #2 and #3 lanes from 16th Street to Hornet Drive (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Wednesday, February 28:

Westbound Closures

  • Connector between westbound US-50 and southbound HWY-99 (11 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound #1, #2 and #3 lanes from 16th Street to Hornet Drive (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Thursday, February 29:

Westbound Closures

  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

 

February 26, 2024

Tonight, Monday, 2/26, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Monday, February 26:

Westbound Closures

  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound#1 and #2 lanes from Howe Avenue to 59th Street (8 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Tuesday, February 27:

Westbound Closures

  • Connector between westbound US-50 and southbound HWY-99 (11 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound #3 and #4 lanes from 8th Street to 26th Street (10 PM – 5 AM)
  • Eastbound 15th Street offramp (9 PM – 5 AM)
  • Eastbound 16th Street onramp (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Wednesday, February 28:

Westbound Closures

  • Connector between westbound US-50 and southbound HWY-99 (11 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Thursday, February 29:

Westbound Closures

  • Connector between westbound US-50 and southbound HWY-99 (11 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

 

February 23, 2024

Tonight, Friday, 2/23, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Closures are planned to continue next week.

Nighttime Closures: 

Friday, February 23:

Westbound Closures

  • Stockton Blvd. off-ramp (9 PM – 5 AM)
  • #1 and #2 lanes from 65th Street to 5th Street (9 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Sunday, February 25:

Westbound Closures

  • Westbound US-50 to Northbound I-5 connector #2 lane (11 PM – 5 AM)
  • US-50 to SB  HWY-99 connector (9 PM – 5 AM)
  • NB HWY-99 connector ramp to westbound US-50 (11 PM – 4 AM)
  • 10th Street offramp (9 PM – 5 AM)
  • 16th Street offramp (9 PM – 5 AM)
  • 15th Street onramp (9 PM – 5 AM)
  • Stockton Blvd. offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Monday, February 26:

Westbound Closures

  • US-50 to SB HWY-99 connector (9 PM – 5 AM)
  • Stockton Blvd. offramp (9 PM – 5 AM)
  • Westbound#1 and #2 lanes from Howe Avenue to 59th Street (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • #1 and #2 lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

 

February 22, 2024

Tonight, Thursday, 2/22, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Thursday, February 22:

Westbound Closures

  • Westbound US-50 to Northbound I-5 connector #2 lane (11 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound US-50 to the SB-99 connector (11 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (9 PM – 5 AM)
  • Westbound inside and outside lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
    • Outside #3 and #4 lanes first, then switch to inside #1 and #2 lanes upon completion
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, February 23:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Sunday, February 25:

Westbound Closures

  • Westbound US-50 to Northbound I-5 connector #2 lane (11 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

February 21, 2024

Tonight, Wednesday, 2/21, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Wednesday, February 21:

Westbound Closures

  • WB 16th and 10th Street offramps (9 PM – 5 AM)
  • WB 15th Street onramp (9 PM – 5 AM)
  • Westbound #4 lane from 10th Street to 5th Street (9 PM – 5 AM)
  • Westbound US-50 to SB-99 connector ramp (11 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 26th Street to 39th Street

Thursday, February 22:

Westbound Closures

  • WB 16th and 10th Street offramps (9 PM – 5 AM)
  • WB 15th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Friday, February 23:

Westbound Closures

  • WB 16th and 10th Street offramps (9 PM – 5 AM)
  • WB 15th Street onramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

February 20, 2024

Tonight, Tuesday, 2/20, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Tuesday, February 20:

Westbound Closures

  • Westbound 16th & 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Howe Avenue to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Wednesday, February 21:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, February 22:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Other Closures

  • Stockton Boulevard near the US-50 project area (9 PM – 5 AM)

Friday, February 23:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

February 15, 2024

Tonight, Thursday, 2/15, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Thursday, February 15:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th onramp (10 PM – 5 AM)
  • Westbound 59th onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from Howe Avenue to Watt Avenue (9 PM – 5 AM)
  • Eastbound Watt Avenue offramp (9 PM – 5 AM)

Tuesday, February 20:

Westbound Closures

  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Wednesday, February 21:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Thursday, February 22:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Friday, February 23:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

February 14, 2024

Tonight, Wednesday, 2/14, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Wednesday, February 14:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound Howe Avenue offramp (9 PM – 6 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 26th Street to 39th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)
  • Eastbound outside (#3 and 4) lanes from Howe Avenue to Watt Avenue (9 PM – 5 AM)
  • Eastbound Watt Avenue offramp (9 PM – 5 AM)

Other Closures

  • Redding Avenue beneath US-50 (9PM – 5AM)

Thursday, February 15:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th onramp (10 PM – 5 AM)
  • Westbound 59th onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound Watt Avenue offramp (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

February 13, 2024

Tonight, Tuesday, 2/13, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Tuesday, February 13:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue onramp and offramp (9 PM – 5 AM)
  • Westbound #3 lane at Howe Avenue (9 PM – 6 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from Stockton Boulevard to 65th Street (9 PM – 5 AM)
  • Eastbound 59th Street offramp (9 PM – 5 AM)
  • Eastbound Stockton Boulevard onramp (9 PM – 5 AM)

Wednesday, February 14:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Howe Avenue onramp and offramp (9 PM – 5 AM)
  • Westbound #3 lane at Howe Avenue (9 PM – 6 AM)

Eastbound Closures

  • Eastbound outside (#3 and 4) lanes from Howe Avenue to Watt Avenue (9 PM – 5 AM)

Thursday, February 15:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 59th Street to Stockton Boulevard (9 PM – 5 AM)

Eastbound Closures

  • Eastbound Watt Avenue offramp (9 PM – 5 AM)

 

February 12, 2024

Tonight, Monday, 2/12, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Nighttime Closures: 

Monday, February 12:

Westbound Closures

  • Westbound 10th and 16th Street offramps (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound Howe Avenue on- and offramps (9 PM – 5 AM)
  • Westbound #3 lane at Howe Avenue (9 PM – 6 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 39th Street to 26th Street (9 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Tuesday, February 13:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 39th Street to 26th Street (9 PM – 5 AM)
  • Eastbound outside (#3 and 4) lanes from Stockton Boulevard to 65th Street (9 PM – 5 AM)
  • Eastbound 59th Street offramp (9 PM – 5 AM)

Wednesday, February 14:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 39th Street to 26th Street (9 PM – 5 AM)
  • Eastbound outside (#3 and 4) lanes from Howe Avenue to Watt Avenue (9 PM – 5 AM)

Thursday, February 15:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 59th Street to Stockton Boulevard (9 PM – 5 AM)

Eastbound Closures

  • Eastbound Watt Avenue offramp (9 PM – 5 AM)

 

February 9, 2024

Tonight, Friday, 2/9, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert

Daytime Closures: 

Saturday, February 10:

Westbound Closures

  • Westbound inside (#1) lane from Howe Avenue to 65th Street (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1) lane from 65th Street to Howe Avenue (9 PM – 5 AM)

Nighttime Closures: 

Friday, February 9:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

February 8, 2024

Tonight, Thursday, 2/8, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert 

Nighttime Closures: 

Thursday, February 8:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th – 5th Street (10 PM – 5 AM)
  • Westbound 16th Street and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, February 9:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

 

February 7, 2024

Tonight, Wednesday, 2/7, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert 

Nighttime Closures: 

Wednesday, February 7:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th – 5th Street (10 PM – 5 AM)
  • Westbound 16th Street and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, February 8:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th – 5th Street (10 PM – 5 AM)
  • Westbound 16th Street and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, February 9:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

February 5, 2024

Tonight, Monday, 2/5, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert 

Nighttime Closures: 

Monday, February 5:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th – 5th Street (10 PM – 5 AM)
  • Westbound 16th and 10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Tuesday, February 6:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th – 5th Street (10 PM – 5 AM)
  • Westbound 16th and 10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound 10th Street offramp (9 PM – 5 AM)
  • Westbound 16th Street offramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Wednesday, February 7:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th – 5th Street (10 PM – 5 AM)
  • Westbound 16th and 10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Thursday, February 8:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th – 5th Street (10 PM – 5 AM)
  • Westbound 16th and 10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Friday, February 9:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

February 2, 2024

Today, Friday, 2/2, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert 

Nighttime Closures: 

Friday, February 2:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Sunday, February 4:

Westbound Closures

  • Westbound Howe Avenue onramp (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

February 1, 2024

Today, Thursday, 2/1, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert 

Nighttime Closures: 

Thursday, February 1:

  • Westbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Friday, February 2:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10 PM – 5 AM)
  • Westbound 16th and 10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)

 

January 31, 2024

Today, Wednesday, 1/31, lane and ramp closures are scheduled to continue along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Thursday, February 1:

  • 9th Street underneath US-50, between X Street and W Street (8:30 AM – 3:30 PM)

Nighttime Closures: 

Thursday, February 1:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound #3 and #4 lanes from 65th Street to Howe Avenue (9PM – 5AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Friday, February 2:

  • Westbound #3 and #4 lanes from 65th Street to Howe Avenue (10PM – 5AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 30, 2024

Daytime Closures: 

Wednesday, January 31:

  • 20th Street and 2st Street underneath US-50, between X Street and W Street (8:30 AM – 3:30 PM)

Nighttime Closures: 

Tuesday, January 30:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound #3 and #4 lanes from 65th Street to Howe Avenue (9PM – 5AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 PM – 5:00 AM)

Wednesday, January 31 and Thursday, February 1:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound #3 and #4 lanes from 65th Street to Howe Avenue (9PM – 5AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 PM – 5:00 AM)

Friday, February 2:

  • Westbound #3 and #4 lanes from 65th Street to Howe Avenue (9PM – 5AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Blvd. offramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)

 

January 29, 2024

Today, Monday, 1/29, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Tuesday, January 30:

  • 24th Street near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Monday, January 29:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound Howe Avenue onramp (9:00 PM – 5:00 AM)
  • Westbound inside (#1, 2 and 3) lanes from Howe Avenue to 59th Street (9:00 PM – 5:00 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 PM – 5:00 AM)

Tuesday, January 30:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound inside (#1, 2 and 3) lanes from Howe Avenue to 59th Street (9:00 PM – 5:00 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 PM – 5:00 AM)

Wednesday, January 31:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound inside (#1, 2 and 3) lanes from Howe Avenue to 59th Street (9:00 PM – 5:00 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 PM – 5:00 AM)

Thursday, February 1:

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (10:00 PM – 5:00 AM)
  • Westbound 10th and 16th Street offramps (9:00 PM – 5:00 AM)
  • Westbound 15th Street onramp (9:00 PM – 5:00 AM)
  • Connector between westbound US-50 and northbound SR-99 (11:00 PM – 4:00 AM)
  • Connector between westbound US-50 and southbound I-5 (11:00 PM – 5:00 AM)
  • Westbound Stockton Boulevard offramp (9:00 PM – 5:00 AM)
  • Westbound inside (#1, 2 and 3) lanes from Howe Avenue to 59th Street (9:00 PM – 5:00 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 PM – 5:00 AM)

January 26, 2024

Continuing tonight, Friday, 1/26, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Friday, January 26:

  • 20th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 24th Street near the US-50 project area (8:30 AM – 3:30 PM)

Monday, January 29:

  • 20th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 24th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • Westbound 15th Street onramp (9:00 AM – 12:00 PM)

Nighttime Closures: 

Friday, January 26:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 PM – 4 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Howe Avenue onramp (9 PM – 5 AM)

Sunday, January 28:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 PM – 4 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound inside (#1, 2 and 3) lanes from Howe Avenue to 59th Street (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Monday, January 29:

Westbound Closures

  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Tuesday, January 30:

  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Wednesday, January 31:

Westbound Closures

  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Thursday, February 1:

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

 

January 25, 2024

Continuing tonight, Thursday, 1/25, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Friday, January 26:

  • 20th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 24th Street near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Thursday, January 25:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound Hornet Drive onramp (10 PM – 5 AM)
  • Westbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Friday, January 26:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)

Sunday, January 28:

Westbound Closures

  • Westbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Monday, January 29:

Westbound Closures

  • Westbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Tuesday, January 30:

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 24, 2024

Continuing tonight, Wednesday, 1/24, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Wednesday, January 24 and Thursday, January 25: 

  • 20th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 23rd Street near the US-50 project area (8:30 AM – 3:30 PM)
  • Onramp from 15th Street to westbound US-50 (8:30 AM – 3:30 PM)

Nighttime Closures: 

Wednesday, January 24:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Stockton Blvd. offramp (9PM – 5AM)
  • Westbound #1 and #2 lanes from 65th Street to Stockton Blvd. 

Eastbound Closures

  • Eastbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Thursday, January 25:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th and 10th Street offramps (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Stockton Blvd. offramp (9PM – 5AM)

Eastbound Closures

  • Eastbound inside (#1, #2 and #3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 23, 2024

Continuing tonight, Tuesday, 1/23, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Wednesday, January 24: 

  • 20th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 23rd Street near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Tuesday, January 23:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th/10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound Stockton Boulevard offramp (9 PM – 5 AM)
  • Westbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Wednesday, January 24:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th/10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Thursday, January 25:

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th/10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

January 22, 2024

Continuing tonight, Monday, 1/22, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Tuesday, January 23: 

  • 20th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 23rd Street near the US-50 project area (8:30 AM – 3:30 PM)
  • Westbound 10th Street offramp (9 AM – 4 PM)
  • Westbound 15th Street onramp (9 AM – 4 PM)

Nighttime Closures: 

Monday, January 22: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Howe Avenue to 65th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th/10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and southbound I-5 (11 AM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 4 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound How Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Tuesday, January 23:

Westbound Closures

  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Wednesday, January 24:

Westbound Closures

  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

Thursday, January 25:

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

 

January 19, 2024

Continuing tonight, Friday, 1/19, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Monday, January 22: 

  • 22nd Street near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Sunday, January 21: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Howe Avenue to 65th Street (9 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 16th Street to 5th Street (9 PM – 5 AM)
  • Westbound 16th/10th Street offramp (9 PM – 5 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 AM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Redding Avenue near the US-50 project area (8:30 AM – 3:30 PM)

Monday, January 22:

  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Redding Avenue near the US-50 project area (8:30 AM – 3:30 PM)

Tuesday, January 23:

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Redding Avenue near the US-50 project area (8:30 AM – 3:30 PM)

Wednesday, January 24 & Thursday, January 25:

  • Redding Avenue near the US-50 project area (8:30 AM – 3:30 PM)

 

January 18, 2024

Continuing tonight, Thursday, 1/18, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Friday, January 19: 

  • Westbound 10th Street offramp (9 AM – 4 PM)
  • Westbound 15th Street onramp (9 AM – 4 PM)
  • 10th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 15th Street near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Thursday, January 18: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#4) from Stockton Boulevard to 26th Street (9 PM – 5 AM)
  • Westbound 26th Street offramp (9 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Friday, January 19: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Sunday, January 21 – Thursday, January 25:

  • Redding Avenue near the US-50 project area (8:30 AM – 3:30 PM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 17, 2024

Tonight, Wednesday, 1/17, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Thursday, January 18: 

  • 9th Street near the US-50 construction site (8:30 AM – 3:30 PM)
  • 22nd Street near the US-50 construction site (8:30 AM – 3:30 PM)
  • Westbound 15th Street onramp (9 AM – 4 PM)

Friday, January 19: 

  • Westbound 10th Street offramp (9 AM – 4 PM)
  • Westbound 15th Street onramp (9 AM – 4 PM)

Nighttime Closures: 

Wednesday, January 17: 

Westbound Closures

  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 65th Street (10 PM – 5 AM)

Eastbound Closures

  • Eastbound 15th Street onramp (10 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Thursday, January 18: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound 26th Street offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Friday, January 19: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 16, 2024

Tonight, Tuesday, 1/16, the closures below are expected along US-50 in Sacramento this week. #BeWorkZoneAlert 

Daytime Closures: 

Wednesday, January 17: 

  • 8th Street near the US-50 construction site (8:30 AM – 3:30 PM)
  • 22nd Street near the US-50 construction site (8:30 AM – 3:30 PM)

Nighttime Closures: 

Tuesday, January 16: 

Westbound Closures

  • Westbound inside (#1 and 2) lanes from Howe Avenue to 65th Street (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound 10th Street offramp (10 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Wednesday, January 17: 

Westbound Closures

  • Westbound inside (#1 and 2) lanes from Howe Avenue to 65th Street (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Thursday, January 18: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Friday, January 19: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

 

January 12, 2024

Tonight, Friday, 1/12, the closures below are expected along US-50 in Sacramento this week. #BeWorkZoneAlert 

Daytime Closures: 

Monday, January 15: 

  • Westbound 10th Street offramp (9 AM – 4 PM)

Nighttime Closures: 

Friday, January 12: 

Westbound Closures

  • Connector between westbound US-50 and northbound SR-99 (11 PM – 4 AM)
  • Westbound 15th Street onramp (10 PM – 5 AM)
  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Sunday, January 14: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 65th Street (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Monday, January 15: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 65th Street (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Tuesday, January 16: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Wednesday, January 17: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Thursday, January 18: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Friday, January 19: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

 

January 11, 2024

Tonight, Thursday, 1/11, the closures below are expected along US-50 in Sacramento this week. #BeWorkZoneAlert 

Nighttime Closures: 

Thursday, January 11: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from 26th Street to 5th Street (9 PM – 5 AM)
  • Connector between westbound US-50 and northbound SR-99 (11 PM – 4 AM)
  • Westbound 15th Street onramp (9 PM – 5 AM)
  • Westbound 16th Street offramp (9 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Eastbound 59th Street offramp (11 PM – 4 AM)

Other Closures

  • Redding Avenue near the US-50 project area (9 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 10, 2024

Tonight, Wednesday, 1/10, the closures below are expected along US-50 in Sacramento this week. #BeWorkZoneAlert 

Daytime Closures: 

Thursday, January 11: 

  • 22nd Street near the US-50 project area (8:30 AM – 3:30 PM)
  • Westbound 15th Street onramp (9:00 AM – 4:00 PM)

Nighttime Closures: 

Wednesday, January 10: 

Westbound Closures

  • Connector between westbound US-50 and northbound US-99 (11 PM – 4 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Thursday, January 11: 

Westbound Closures

  • Connector between westbound US-50 and northbound US-99 (11 PM – 4 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

 

January 9, 2024

Tonight, Tuesday, 1/9, the closures below are expected along US-50 in Sacramento this week. #BeWorkZoneAlert 

Daytime Closures: 

Wednesday, January 10: 

  • 21st Street near the US-50 project area (8:30 AM – 3:30 PM)
  • 22nd Street near the US-50 project area (8:30 AM – 3:30 PM)

Thursday, January 11: 

  • Westbound 15th Street onramp (9:00 AM – 4:00 PM)

Nighttime Closures: 

Tuesday, January 9: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Wednesday, January 10: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Thursday, January 11: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1, 2 and 3) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

 

January 8, 2024

Tonight, Monday, 1/8, the closures below are expected along US-50 in Sacramento this week. #BeWorkZoneAlert 

Daytime Closures: 

Tuesday, January 9: 

  • 21st Street near the US-50 project area (8:30 AM – 3:30 PM)

Thursday, January 11: 

  • Westbound 15th Street onramp (9:00 AM – 4:00 PM)

Nighttime Closures: 

Monday, January 8: 

Westbound Closures

  • Westbound 16th Street offramp (10 PM – 5 AM)
  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound 15th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Tuesday, January 9: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Wednesday, January 10: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Thursday, January 11: 

Westbound Closures

  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound inside (#1 and 2) lanes from Howe Avenue to 59th Street (10 PM – 5 AM)

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

 

January 5, 2024

Tonight, Friday, 1/5, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Daytime Closures: 

Monday, January 8: 

  • 10th Street near the US-50 project area (8:30 AM – 3:30 PM)
  • Westbound 15th Street onramp (8:00 AM – 5:00 PM)

Thursday, January 11: 

  • Westbound 15th Street onramp (8:00 AM – 5:00 PM)

Nighttime Closures: 

Friday, January 5:

Westbound Closures

  • Westbound 15th Street onramp (10 PM – 5 AM)
  • Westbound US-50 to the SB-99 connector (11 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Sunday, January 7: 

Westbound Closures

  • Westbound 15th Street onramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)
  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound 16th Street offramp (10 PM – 5 AM)

Eastbound Closures

  • Eastbound outside (#5) lane from 15th – 26th Street (10 PM – 5 AM)
  • Eastbound 16th Street onramp (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Monday, January 8: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

January 4, 2024

Tonight, Thursday, 1/4, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Notice: Ramp closures will be in place nightly throughout the project area for routine maintenance from 10 PM to 5 AM Wednesday night through Friday night.

Daytime Closures: 

Friday, January 5: 

  • 10th and 21st Streets near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Thursday, January 4:

Eastbound Closures

  • Eastbound outside (#4) auxiliary lane from 15th Street to 26th Street (10 PM – 5 AM)
  • Eastbound 16th Street onramp (10 PM – 5 AM)

Westbound Closures

  • Westbound 15th Street onramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from 65th Street to Stockton Boulevard (10 PM – 5 AM)
  • Westbound 65th Street onramp (10 PM – 5 AM)
  • Westbound 59th Street onramp (10 PM – 5 AM)
  • Westbound Stockton Boulevard offramp (10 PM – 5 AM)
  • Westbound US-50 to the SB-99 connector (11 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Friday, January 5: 

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

January 3, 2024

Tonight, Tuesday, 1/3, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Notice: Ramp closures will be in place nightly throughout the project area for routine maintenance from 10 PM to 5 AM Wednesday night through Friday night.

Daytime Closures: 

Thursday, January 4: 

  • 6th, 8th, and 9th Streets near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Wednesday, January 3:

Eastbound Closures

  • NB-99 to eastbound US-50 connector (11 PM – 4 AM)
  • Eastbound outside (#5) auxiliary lane from 8th Street to 26th Street (10 PM – 5 AM)
  • Eastbound outside (#4) auxiliary lane from 15th Street to 26th Street (10 PM – 5 AM)
  • Eastbound 16th Street onramp (10 PM – 5 AM)
  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
  • Eastbound inside (#1, 2 and 3) lanes from 65th Street to Howe Avenue (10 PM – 5 AM)

Westbound Closures

  • Westbound 10th Street offramp (10 PM – 5 AM)
  • Westbound 15th Street onramp (10 PM – 5 AM)
  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (10 PM – 5 AM)

Thursday, January 4: 

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Westbound Closures

  • Westbound outside (#3 and 4) lanes from Watt Avenue to Howe Avenue (10 PM – 5 AM)
  • Westbound Watt Avenue onramp (10 PM – 5 AM)
  • Westbound Howe Avenue onramp (10 PM – 5 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

January 2, 2024

Tonight, Tuesday, 1/2, the closures below are expected along US-50 in Sacramento. #BeWorkZoneAlert 

Notice: Ramp closures will be in place nightly throughout the project area for routine maintenance

Daytime Closures: 

Wednesday, January 3: 

  • 9th Street near the US-50 project area (8:30 AM – 3:30 PM)

Nighttime Closures: 

Tuesday, January 2:

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)

Other Closures

  • Folsom Boulevard near the US-50 project area (9 PM – 5 AM)

Wednesday, January 2: 

Eastbound Closures

  • Eastbound inside (#1 and 2) lanes from 59th Street to Howe Avenue (10 PM – 5 AM)
 
 

March 8, 2023

Extended Closure:

  • Ramona Avenue full closure (no vehicle access) under US-50

Daytime Closures:

  • Thursday, March 9:
    • Westbound outside (#4) lane near the 15th Street onramp (9:00 PM – 1:00 PM)
    • Eastbound X Street inside (#1) lane between Riverside Boulevard and 15th Street (8:30 AM – 3:30 PM)
    • 18th Street between X and W Street (8:30 AM – 3:30 PM)
  • Friday, March 10:
    • 18th Street between X and W Street (8:30 AM – 3:30 PM)

Nighttime Closures:

  • Wednesday, March 8:
    • Eastbound outside (#4) lane from the Highway 99 connector to the 15th Street offramp (9:00 PM – 5:00 AM)
    • Westbound 15th Street outside (#3 and #4) lanes and offramp (9:00 PM – 6:00 AM)
    • Westbound inside (#1 and #2) lanes from 65th Street to 26th Street (9:00 PM – 6:00 AM)
    • Westbound US-50 to Highway 99 connector (11:00 PM – 5:00 AM)

Weather permitting, additional closures may be planned on Thursday, March 9 and Friday, March 10.

 

March 6, 2023

Starting tomorrow, Tuesday (3/7/23), street, lane and ramp closures are scheduled along eastbound and westbound US-50 (weather permitting).

Caltrans has also scheduled an extended closure of Ramona Avenue at the U.S. Highway 50 location that will last to the completion of the project. The contractor requires additional room to construct HOV lanes for U.S. Highway 50, and relocate the railroad crossing.

Daytime Closures

Tuesday, March 7:

  • Westbound outside lane at 15th Street onramp (9:00 AM – 1:00 PM)
  • 18th Street between X and W Street (8:30 AM – 3:30 PM)
  • 22nd Street between X and W Street (8:30 AM – 3:30 PM)
  • The inside lane (#1) of X Street between 16th Street and 18th Street (9:00 AM – 1:00 PM)
  • Westbound inside lane (#1) between 10th Street and 5th Street (9:00 AM – 7:00 PM)

Wednesday, March 8:

  • The inside lane (#1) of X Street between 16th Street and 18th Street (9:00 AM – 1:00 PM)
  • Westbound inside lane (#1) between 10th Street and 5th Street (9:00 AM – 7:00 PM)
  • 21st Street between X and W Street (8:30 AM – 3:30 PM)

Thursday, March 9:

  • Westbound inside lane (#1) between 10th Street and 5th Street (9:00 AM – 7:00 PM)
  • 20th Street between X and W Street (8:30 AM – 3:30 PM)
  • 26th Street between X and W Street (8:30 AM – 3:30 PM)
  • Ramona Avenue under US-50 (7:00 AM – 5:00 PM)

Friday, March 10:

  • 26th Street between X and W Street (8:30 AM – 3:30 PM)
  • Ramona Avenue under US-50 (7:00 AM – 5:00 PM)

Nighttime Closures

Tuesday, March 7 & Wednesday, March 8:

  • Offramp from eastbound US-50 to Howe Avenue (9:00 PM – 6:00 AM)
  • Westbound inside lanes (#1 & #2) from 65th Street to Stockton Boulevard (9:00 PM – 6:00 AM)

Thursday, March 9 and Friday, March 10:

  • Offramp from eastbound US-50 to Howe Avenue (9:00 PM – 6:00 AM)
  • Eastbound inside (#1) and outside (#4) lanes between Howe Avenue and Watt Avenue (9:00 PM – 5:00 AM)
  • Onramp from Howe Avenue to eastbound US-50 (9:00 PM – 6:00 AM)
  • Offramp from eastbound US-50 to Watt Avenue (9:00 PM – 5:00 AM)

 

March 2, 2023

TONIGHT (3/2/23), lane and ramp closures are scheduled to continue along eastbound and westbound US-50.

Daytime Closures

Friday, March 3:

  • 9th Street and 15th Street between X and W Street (8:30 AM – 3:30 PM)
  • W Street between 10th Street and 9th Street (8:30 AM – 3:30 PM)

Monday, March 6:

  • 26th Street between X and W Street (8:30 AM – 3:30 PM)
  • Westbound outside lane (#4) at 15th Street onramp (9:00 AM – 1:00 PM)

Tuesday, March 7:

  • 26th Street between X and W Street (8:30 AM – 3:30 PM)
  • Westbound inside lane (#1) from 10th to 5th Street (9:00 AM – 7:00 PM)

Wednesday, March 8:

  • 20th Street between X and W Street (8:30 AM – 3:30 PM)
  • Westbound inside lane (#1) from 10th to 5th Street (9:00 AM – 7:00 PM)

Thursday, March 9:

  • 20th Street between X and W Street (8:30 AM – 3:30 PM)
  • Westbound inside lane (#1) from 10th to 5th Street (9:00 AM – 7:00 PM)

Nighttime Closures

Thursday, March 2:

  • Westbound inside (#1 and #2) lanes from 26th and 15th Street (9:00 PM – 5:00 AM)
  • Westbound inside (#1, #2 and #3) lanes from 65th Street to Stockton Boulevard (9:00 PM – 5:00 AM)
  • Westbound US-50 to southbound 99 connector ramp (9:00 PM – 5:00 AM)
  • Eastbound “trapped lane” (9:00 PM – 5:00 AM)
  • 19th Street between W and X Street (9:00 PM – 5:00 AM)
  • Folsom Boulevard under US-50 (9:00 PM – 5:00 AM)

Friday, March 3:

  • Eastbound #1, #2, and #3 lanes at Folsom Boulevard ; Folsom Blvd. will be closed under US-50 (9:00 PM – 5:00 AM)

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

February 27, 2023

Expect daytime and nighttime work along eastbound and westbound US-50 this week (February 27 – March 3, 2023). 

Daytime Closures

Tuesday, February 28:

  • 15th Street, 16th Street, and 22nd Street between X and W Street are planned to be closed 9 a.m. to 7 p.m.

Wednesday, March 1:

  • X Street inside (#1) lane  from Riverside Blvd. to 15th Street and 16th Street to 5th Street is planned to be closed from 8:30 a.m. to 3 p.m.
  • 15th Street and 16th Street between X and W Street are planned to be closed 9 a.m. to 7 p.m.

Thursday, March 2: 

  • 15th Street and 16th Street between X and W Street are planned to be closed 9 a.m. to 7 p.m.

Nighttime Closures

Monday, February 27:

  • The westbound #1 and #2 lanes from Stockton Blvd. to 65th Street are scheduled to be closed from 9 p.m. to 5 a.m.
  • The eastbound #1 (trapped) lanes is scheduled to be closed from 9 p.m. to 5 a.m.
  • The offramp from eastbound US-50 to Hornet Drive is scheduled to be closed from 9 p.m. to 6 a.m.
  • Hornet Drive underneath US-50 is scheduled to be closed from 9 p.m. to 5 a.m.
  • The onramp from Watt Avenue to eastbound US-50 is scheduled to be closed 9 p.m. to 5 a.m.

Tuesday, February 28:

  • The westbound #1 and #2 lanes from Stockton Blvd. to 65th Street are scheduled to be closed from 9 p.m. to 5 a.m.
  • The offramp from eastbound US-50 to Hornet Drive is scheduled to be closed from 9 p.m. to 6 a.m.
  • Hornet Drive underneath US-50 is scheduled to be closed from 9 p.m. to 5 a.m.

Wednesday, March 1 and Thursday, March 2:

  • The offramp from eastbound US-50 to Hornet Drive is scheduled to be closed from 9 p.m. to 6 a.m.
  • Hornet Drive underneath US-50 is scheduled to be closed from 9 p.m. to 5 a.m.

Friday, March 3:

  • Folsom Blvd. underneath US-50 is scheduled to be closed from 9 p.m. to 5 a.m.
  • The #1 and #2 eastbound lanes at Folsom Blvd. are scheduled to be closed from 9 p.m. to 5 a.m.

*Work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related.

 

February 17, 2023

SACRAMENTO – Caltrans has scheduled lane closures during the daytime from Tuesday through Thursday next week in Sacramento for ongoing work on the $460 million U.S. Highway 50 Corridor Enhancement (“Fix50”) Project.

The westbound far left lane is scheduled to be closed to traffic for ongoing work on Tuesday, February 21 through Thursday, February 23 daily 9 a.m. to 5 p.m. from 5th Street to the I-5 connector for asphalt paving work. The work is weather dependent.

Motorists traveling on Highway 50 should expect delays and plan for additional travel time in both directions. Caltrans suggests using State Route 51 (Capital City Freeway/ Business 80) and/or Interstate 80 as alternate routes.

Daytime Closures

Wednesday, February 22:

  • 19th Street between X Street and W Street (8:30 AM – 3:30 PM)
  • X Street inside lane from Riverside Boulevard to 15th Street (8:30 AM – 3:30 PM)
  • W Street inside lane from 26th to 24th Street (8:30 AM – 3:30 PM)
  • Westbound US-50 inside (#1) lane from 18th to 5th Street (9:00 AM – 6:00 PM)

Thursday, February 23:

  • 16th Street between X Street and W Street (8:30 AM – 3:30 PM)
  • Westbound US-50 inside (#1) lane from 18th to 5th Street (9:00 AM – 6:00 PM)

Nighttime Closures

Tuesday, February 21:

  • Eastbound inside/outside lanes from 5th to 26th Street (9:00 PM – 5:00 AM)
  • Eastbound and westbound #1 and #2 lanes from 59th Street to Howe Avenue (9:00 PM – 5:00 AM)
  • #1 and #2 lanes from 24th to 16th Street (9:00 PM – 5:00 AM)
  • Southbound 51 to Westbound US-50 Connector ramp (11:00 PM – 1:00 AM)

Friday, February 24:

  • On and offramps at Folsom Boulevard (9:00 PM – 5:00 AM)
  • Eastbound #1 and #2 lanes at Folsom Boulevard (9:00 PM – 5:00 AM)

 

February 14, 2023

Daytime Closures (8:30 AM to 3:30 PM)

Wednesday, February 15:

  • 18th Street, 19th Street, 20th Street, 22nd Street and 26th Street between X Street and W Street. 
  • Eastbound #1 (inside) lane on X Street from 24th Street to 28th Street.
  • Westbound #1 (inside) lane on W Street from 26th Street to 24th Street.

Thursday, February 16:

  • 18th Street, 19th Street, 20th Street and 26th Street between X Street and W Street. 
  • Eastbound #1 (inside) lane on X Street from 24th Street to 28th Street.
  • Westbound #1 (inside) lane on W Street from 26th Street to 24th Street.

Friday, February 17:

  • 19th and 26th Street between X Street and W Street. 
  • Eastbound #1 (inside) lane on X Street from 16th Street to 18th Street.

Nighttime Closures

Tuesday, February 14: 

  • Eastbound #1 and #2 (inside) lanes from 5th Street to 20th Street (9 PM – 5 AM)
  • Eastbound #2, #3, and #4 (outside) lanes from Howe Avenue to Watt Avenue (9 PM – 5 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM – 6 AM)
  • Onramp from 65th Street to eastbound US-50 (9 PM – 6 AM) 

Thursday, February 16:

  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM – 6 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM – 6 AM)
  • 21nd Street, and 22nd Street closed between X Street and W Street (9 PM – 5 AM)

Friday, February 17:

  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM – 6 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM – 6 AM)
  • 18th Street and 20th Street closed between X Street and W Street (9 PM – 5 AM)

 

February 13, 2023

Daytime Closures (8:30 AM to 3:30 PM)

Tuesday, February 13:

  • The eastbound inside lane on X Street from 24th-28th Street
  • The westbound inside lane at W Street from 26th-24th Street
  • 18th Street, 21st Street, 22nd Street, and 26th Street between X Street and W Street

Wednesday, February 14:

  • 16th Street and 19th Street between X Street and W Street

Thursday, February 15:

  • 19th Street and 26th Street between X Street and W Street 
  • The eastbound inside lane on X Street from 24th-28th Street
  • The westbound inside lane at W Street from 26th-24th Street

Friday, February 16:

  • 19th Street and 26th Street between X Street and W Street

Nighttime Closures

Monday, February 13:

  • Connector ramp from westbound US-50 to Southbound SB-99 (11 PM – 5 AM)
  • Eastbound #1 and #2 (inside) lanes from 5th Street – 20th Street (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from Stockton Blvd. to 65th Street
  • Offramp from eastbound US-50 to 65th Street (9 PM – 6 AM)
  • Eastbound #2, #3, and #4 (outside) lanes from Howe Avenue – Watt Avenue (9 PM – 5 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM – 6 AM)
  • Onramp from 65th Street to eastbound US-50 (9 PM – 6 AM)
  • Westbound #1 and #2 (inside) lanes from Ramona Avenue to Redding Avenue (9 PM – 5 AM)
  • Redding Avenue between X Street and W Street (9 PM – 5 AM)

Tuesday, February 14: 

  • Connector ramp from westbound US-50 to Southbound SB-99 (11 PM – 5 AM)
  • Eastbound #1 and #2 (inside) lanes from 5th Street – 20th Street (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from Stockton Blvd. to 65th Street
  • Eastbound #2, #3, and #4 (outside) lanes from Howe Avenue – Watt Avenue (9 PM – 5 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM – 6 AM)
  • Onramp from 65th Street to eastbound US-50 (9 PM – 6 AM)
  • Eastbound #1 and #2 lanes from Redding Avenue to Ramona Avenue (9 PM – 5 AM)

Wednesday, February 14:

  • Eastbound #1 and #2 lanes from Redding Avenue to Ramona Avenue (9 PM – 5 AM)
  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM – 6 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM – 6 AM)
  • 18th Street, 20st Street, 21nd Street, and 22nd Street closed between X Street and W Street (9 PM – 5 AM)

Thursday, February 15 and Friday, February 16:

  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM – 6 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM – 6 AM)
  • 18th Street, 20st Street, 21nd Street, and 22nd Street closed between X Street and W Street (9 PM – 5 AM)

February 9, 2023

Daytime Work (8:30 AM – 3:30 PM):

The following closures are planned for Thursday, February 9:

  • 16th Street, 19th Street, 21st Street, 22nd Street and 26 Street between X St. and W St.
  • The eastbound #1 lane from 16th Street to 18th Street

The following closures are planned for Friday, February 10:

  • 26th Street between X St. and W St. 
  • The eastbound #1 lane from 16th Street to 18th Street
  • The eastbound #1 lane from 24th Street to 28th Street
  • The westbound #1 lane from 26th Street to 24th Street

Nighttime Work:

On Thursday, February 9, the below lanes and ramps are scheduled to be closed:

  • Eastbound #1 and #2 lanes from Stockton Blvd. to 65th Street (9 PM to 5 AM)
  • Westbound US-50 to SB-99 connector ramp (11 PM to 5 AM)
  • Westbound #1 and #2 lanes from Ramona Ave. to Redding Ave. (9PM to 5 AM)
  • Eastbound #1 and #2 lanes from Ramona Ave. to Redding Ave. (9PM to 5 AM)
  • Redding Avenue Full Closure (9 PM to 5 AM)
  • Eastbound #2 and #3 lanes from Howe Avenue to Watt Avenue (9 PM to 5 AM)
  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM to 5 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM to 5 AM)
  • 23rd Street and 19th Street between X St. and W St. (9 PM to 5 AM)

On Friday, February 10, the below lanes and ramps are scheduled to be closed:

  • Westbound #1 and #2 lanes from Ramona Ave. to Redding Ave. (9PM to 5 AM)
  • Redding Avenue Full Closure (9 PM to 5 AM)
  • Eastbound outside/inside lanes from Howe Avenue to Watt Avenue (9 PM to 6 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM to 6 AM)
  • Offramp from eastbound US-50 to Watt Avenue (9 PM to 5 AM)
  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (8 PM to 5 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (8 PM to 5 AM)
  • 24th Street between X Street and W Street (9PM to 5 AM)

February 7, 2023

Expect daytime and nighttime work along eastbound and westbound US-50 this week:

Daytime Work (8:30 AM – 3:30 PM):

The following closures are planned for Wednesday, February 8:

  • X Street (16th to 21st) Eastbound #1 Lane
  • 21st Street and 22nd Street between X St. and W St.

The following closures are planned for Thursday, February 9:

  • 16th Street between X St. and W St.
  • 26th Street between X St. and W St. 

The following closures are planned for Friday, February 10:

  • 15th Street and 26th Street between X St. and W St. 
  • X Street (24th to 28th) Eastbound #1 Lane
  • W Street (16th to 21st) Westbound #1 Lane

Nighttime Work:

On Tuesday, February 7, the below lanes and ramps are scheduled to be closed:

  • Outside lanes on the onramp from 10th Street/X Street to eastbound US-50 (9 PM to 5 AM).
  • The #1 (left) eastbound lane on X Street from 10th Street to 15th Street (9 PM to 5 AM).
  • The outside (right) eastbound lane from 27th Street to 29th Street (9 PM to 5 AM).
  • The eastbound #1 (inside) lanes from 5th Street to 20th Street, (9 PM to 5 AM).
  • The westbound #4 (right) lanes from 24th Street to I-5 connector (11PM to 5 AM)
  • SB 51 to WB US-50 Connector (11 PM to 5 AM)
  • NB 99 to WB US-50 Connector (11 PM to 5 AM)
  • WB US-50 to NB I-5 Connector (11 PM to 5 AM)
  • WB US-50 to 10th Street offramp (11 PM to 5 AM)
  • Westbound #1 and #2 (inside) lanes from 65th Street to Stockton Boulevard (9 PM to 6 AM)
  • Eastbound #2, #3 and #4 lanes from Howe to Watt Avenue (9 PM to 5 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM to 6 AM)
  • Onramp from 65th Street to EB US-50 (9 PM to 6 AM)
  • Offramp from EB US-50 to Watt Avenue (9 PM to 5 AM)
  • Eastbound #1 and #2 lanes from 48th to 65th Street (9 PM to 5 AM)
  • Folsom Boulevard Full Closure between X St. and W St. (9 PM to 5 AM)

On Wednesday, February 8, the below lanes and ramps are scheduled to be closed:

  • Offramp from eastbound US-50 to 65th Street (9 PM to 12 AM)
  • Eastbound #1 and #2 lanes from 48th to 65th Street (9 PM to 5 AM)
  • Eastbound #2 and #3 lanes from Howe Avenue to Watt Avenue (9 PM to 5 AM)
  • Westbound #1 and #2 lanes from Ramona Avenue to Redding Avenue  (9 PM to 5 AM)

On Thursday, February 9, the below lanes and ramps are scheduled to be closed:

  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM to 5 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM to 5 AM)
  • 19th Street between X St. and W St. (9 PM to 5 AM)
  • Eastbound #1 and #2 (left) lanes from 48th Street to 65th Street (9 PM to 5 AM)
  • Eastbound inside, outside lanes from Howe Avenue to Watt Avenue (9 PM to 5 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM to 6 AM)
  • Offramp from eastbound US-50 to Watt Avenue (9 PM to 5 AM)
  • Westbound #1 and #2 lanes from Ramona Avenue to Redding Avenue  (9 PM to 5 AM)
  • Redding Avenue Full Closure (9 PM to 5 AM)

On Friday, February 10, the below lanes and ramps are scheduled to be closed:

  • Eastbound #1 and #2 lanes from 18th Street to 24th Street (9 PM to 5 AM)
  • Westbound #1 and #2 lanes from 24th Street to 18th Street (9 PM to 5 AM)
  • 24th Street and 23rd Street between X Street and W Street (9PM to 5 AM)
  • Eastbound inside, outside lanes from Howe Avenue to Watt Avenue (9 PM to 5 AM)
  • Onramps from Howe Avenue to eastbound US-50 (9 PM to 6 AM)
  • Offramp from eastbound US-50 to Watt Avenue (9 PM to 5 AM)
  • Westbound #1 and #2 lanes from Ramona Avenue to Redding Avenue  (9 PM to 5 AM)
  • Redding Avenue Full Closure (9 PM to 5 AM)

February 6, 2023

Daytime Closures:

The below closures are planned for Tuesday, February 7

  • 21st Street and 23rd Street  between W St. and X St. 
  • X Street (24th to 28th) Eastbound #1 Lane
  • W Street (16th to 21st) Westbound #1 Lane

Nighttime Work:

On Monday, February 6, the below lanes and ramps are scheduled to be closed:

  • Eastbound #1 and #2 lanes from 5th Street to 20th Street (9 PM to 5 AM)
  • Offramp from EB US-50 to Stockton Boulevard (9 PM to 6 AM)
  • Eastbound #2, #3 and #4 lanes from Howe to Watt Avenue (9 PM to 5 AM)
  • EB US-50 to Howe Avenue offramps (9 PM to 6 AM)
  • 65th Street onramp to EB US-50 (9 PM to 6 AM)
  • EB US-50 to Watt Avenue offramp (9 PM to 5 AM)
  • Eastbound #1 and #2 lanes from 48th to 65th Street (9 PM to 5 AM)

February 1, 2023

Expect daytime and nighttime work along eastbound and westbound US-50 this week:

Daytime Work:

The below closures are planned for Wednesday, February 1 from 8:30 a.m. to 3:30 p.m.:

  • 20th Street and 24th Street
  • Westbound inside lane on W Street (26th -27th Street)
  • Eastbound inside lane on X Street (26th – 27th Street)

The below closures are planned for Thursday, February 2 and Friday, February 3 from 8:30 a.m. to 3:30 p.m.:

  • 20th Street
  • Eastbound inside lane on X Street (past 10th Street)
  • Eastbound outside lane on the X Street onramp to eastbound US-50

Nighttime Work:

On Wednesday, February 1, the below lanes and ramps are scheduled to be closed:

  • The eastbound #1 and #2 (inside) lanes are planned to be closed from 6th Street to 26th Street from 9 p.m. to 5 a.m.
  • The westbound US-50 to SB-99 connector ramp is planned to be closed 11 p.m. – 5 a.m.
  • The westbound #1 and #2 lanes from 65th Street to Stockton Blvd. are planned to be closed 9 p.m. to 5 a.m.
  • The eastbound #1 and #2 (inside) lanes from Stockton Blvd. to 65th Street are planned to be closed from 9 p.m. to 5 a.m.

On Thursday, February 2, the below lanes and ramps are scheduled to be closed:

  • The eastbound #1 and #2 (inside) lanes are planned to be closed from 6th Street to 26th Street from 9 p.m. to 5 a.m.
  • The westbound US-50 to SB-99 connector ramp is planned to be closed 11 p.m. – 5 a.m.
  • The westbound #1 and #2 lanes from 65th Street to Stockton Blvd. are planned to be closed 9 p.m. to 5 a.m.
  • The eastbound #1 and #2 (inside) lanes from Stockton Blvd. to 65th Street are planned to be closed from 9 p.m. to 5 a.m.
  • The westbound #1 and #2 (inside) lanes at Redding Avenue are planned to be closed from 9 p.m. to 5 a.m.
  • The eastbound #1 and #2 (inside) lanes from 18th Street to 24th Street are planned to be closed from 9 p.m. to 5 a.m.
  • The westbound #1 and #2 (inside) lanes from 24th Street to 18th Street are planned to be closed from 9 p.m. to 5 a.m.
  • The eastbound inside/outside lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 p.m. to 5 a.m.
  • The on-ramps from Howe Avenue to eastbound US-50 are planned to be closed from 9 p.m. to 5 a.m.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 p.m. to 5 a.m.

On Friday, February 3, the below lanes and ramps are scheduled to be closed:

  • The eastbound #1 and #2 (inside) lanes from 18th Street to 24th Street are planned to be closed from 9 p.m. to 5 a.m.
  • The westbound #1 and #2 (inside) lanes from 24th Street to 18th Street are planned to be closed from 9 p.m. to 5 a.m.
  • The eastbound inside/outside lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 p.m. to 5 a.m.
  • The on-ramps from Howe Avenue to eastbound US-50 are planned to be closed from 9 p.m. to 5 a.m.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 p.m. to 5 a.m.

January 30 – 31, 2023

Daytime Work:

The below closures are planned for Tuesday, January 31 from 8:30 a.m. to 3:30 p.m.:

  • 26th Street
  • Westbound inside lane on W Street (27th – 26th Street)
  • Eastbound inside lane on X Street (26th – 27th Street)
  • 18th Street, 24th Street and 20th Street

Nighttime Work:

On Monday, January 30 and Tuesday, January 31, the below lanes and ramps are planned to be closed:

  • From 9 p.m. to 5 a.m., the eastbound #2, #3 and #4 (outside) lanes are planned to be closed from Howe Avenue to Watt Avenue.
  • The onramps from Howe Avenue to eastbound US-50 are planned to be closed from 9 p.m. to 6 a.m.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 p.m. to 5 a.m.
  • The eastbound #1 and #2 (inside) lanes are planned to be closed from 6th Street to 26th Street from 9 p.m. to 5 a.m.
  • The westbound US-50 to SB-99 connector ramp is planned to be closed 11 p.m. – 5 a.m.
  • The westbound #1 and #2 lanes from 65th Street to Stockton Blvd. are planned to be closed 9 p.m. to 5 a.m.
  • The eastbound #1 and #2 (inside) lanes from Stockton Blvd. to 65th Street are planned to be closed from 9 p.m. to 5 a.m.

January 27, 2023

Expect nighttime lane and ramp closures along eastbound and westbound US-50 this week (1/24/23 – 1/28/23)* as part of the Fix50 Highway Enhancement Project.

On Friday, January 27, the below closures are planned:

  • The eastbound #2, #3 and #4 lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 PM to 5 AM.
  • The Howe Avenue onramps to eastbound US-50 are scheduled to be closed from 9 PM to 6 AM.
  • The eastbound US-50 offramp to Watt Avenue is scheduled to be closed from 9 PM to 5 AM.
  • The eastbound inside/outside lanes are planned to be closed from Stockton Blvd. to 65th Street, 9 PM to 6 AM. The offramp from US-50 to 65th Street offramp is planned to be closed from 9 PM to 6 AM.

Starting Sunday, January 29 through Thursday, February 2 from 8 p.m. to 6 a.m., expect median barrier demolition work and shifted lanes on eastbound US-50 from Howe Avenue to Watt Avenue. Nearby residents may hear loud construction noises including backup truck beeping and heavy equipment lifts during nightly demolition work of the concrete median barrier.

January 24 – 26, 2023

On Tuesday, January 24, the below closures are planned:

  • The westbound US-50 to SB-99 connector ramp is scheduled to be closed from 11 PM to 5AM.
  • The eastbound #1 (left) lane at X Street from 6th Street to 26th Street is scheduled to be closed from 9 PM to 5 AM.
  • The westbound #1 lane at W Street from 26th Street to 6th Street is scheduled to be closed from 9 PM to 5 AM.
  • The eastbound and westbound #1 and #2 (left) lanes at Redding Avenue are planned to be closed from 8 PM to 5 AM. Redding Avenue is planned to be closed from 9 PM to 8 AM.
  • The eastbound #1 and #2 (left) lanes from 16th Street to Stockton Blvd. are planned to be closed from 9 PM to 5 AM.
  • The westbound #1 and #2 (left) lanes from 59th Street to Stockton Blvd. are planned to be closed from 9 PM to 5 AM.
  • The eastbound #2 and #3 (middle) lanes  from Howe Avenue to Watt Avenue are planned to be closed from 9 PM to 5 AM. The Howe Avenue onramps to eastbound US-50 are scheduled to be closed from 9 PM to 6 AM.

On Wednesday, January 25, the below closures are planned:

  • Redding Avenue is planned to be closed from 9 PM to 8 AM.
  • The eastbound #1 and #2 (left) lanes from 16th Street to Stockton Blvd. are planned to be closed from 9 PM to 5 AM.
  • The westbound #1 and #2 (left) lanes from 59th Street to Stockton Blvd. are planned to be closed from 9 PM to 5 AM.
  • The eastbound #2, #3 and #4 lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 PM to 5 AM.
  • The Howe Avenue onramps to eastbound US-50 are scheduled to be closed from 9 PM to 6 AM.
  • The eastbound US-50 offramp to Watt Avenue is scheduled to be closed from 9 PM to 5 AM.
  • The westbound #1 and #2 lanes from 18th Street to 10th Street are scheduled to be closed from 8 PM to 5 AM.
  • The eastbound #1 and #2 lanes from 16th Street to 26th Street are scheduled to be closed from 9 PM to 6 AM. 15th Street and 16th Street are planned to be closed from 9 PM to 6 AM.

On Thursday, January 26, the below closures are planned:

  • The eastbound #1 and #2 (left) lanes from 16th Street to Stockton Blvd. are planned to be closed from 9 PM to 5 AM.
  • The westbound #1 and #2 (left) lanes from 59th Street to Stockton Blvd. are planned to be closed from 9 PM to 5 AM.
  • The eastbound #2, #3 and #4 lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 PM to 5 AM.
  • The Howe Avenue onramps to eastbound US-50 are scheduled to be closed from 9 PM to 6 AM.
  • The eastbound US-50 offramp to Watt Avenue is scheduled to be closed from 9 PM to 5 AM.

January 19, 2023

Starting Thursday, January 19, the following lane and ramp closures are scheduled* to occur:

  • From 9 PM to 5 AM, the #1 and #2 (left) lanes are planned to be closed from 10th Street to 6th Street.
  • From 9 PM to 5 AM, the eastbound and westbound #3 and #4 lanes are planned to be closed from Howe Avenue to Watt Avenue. 
  • The Howe Avenue on-ramp to eastbound US-50 is planned to be closed from 9 PM to 6 AM.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 PM to 5 AM.
  • From 9 PM to 6 AM, the #3 and #4 (right) lanes on westbound US-50 are planned to be closed from 65th Street to Stockton Blvd.
  • The onramps from 65th Street and 59th Street to westbound US-50 are planned to be closed from 9 PM to 6 AM. The offramp from westbound US-50 to Stockton Blvd. is also scheduled to be closed from 9 PM to 6 AM.

Starting Friday, January 20, the below closures are scheduled* to occur:

  • From 9 PM to 5 AM, the eastbound #3 and #4 (right) lanes are planned to be closed from Howe Avenue to Watt Avenue. 
  • The Howe Avenue on-ramp to eastbound US-50 is planned to be closed from 9 PM to 6 AM.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 PM to 5 AM.
  • On westbound US-50 from 9 PM to 6 AM, the #3 and #4 lanes are planned to be closed from Stockton Blvd. to the SR-99 interchange.
  • From 11 PM to 5 AM, the westbound US-50 to SR-99 Connector Ramp is planned to be closed.
  • From 9 PM to 6 AM, the westbound US-50 offramp to 10th Street and 15th Street onramp to US-50 are planned to be closed.
  • From 9 PM to 5 AM, the eastbound #1 and #2 (left) lanes are planned to be closed from 16th Street to 26th Street. Westbound #3 and #4 (right) lanes are planned to be closed from 18th Street to 10th Street.

January 18, 2023

Starting TONIGHT (Wednesday, 1/18) expect lane closures along US-50 in Sacramento (weather permitting):

  • From 9 PM to 5 AM, the eastbound #3 and #4 (right) lanes are planned to be closed from Stockton Blvd. to 65th Street, and Howe Avenue to Watt Avenue.
  • From 8 PM to 6 AM, crews will be clearing storm debris from the project area. 

Starting Thursday, January 19, the following closures are scheduled to occur:

  • From 9 PM to 6 AM, the eastbound and westbound #3 and #4 lanes are planned to be closed from Howe Avenue to Watt Avenue. 
  • The Howe Avenue on-ramp to eastbound US-50 is planned to be closed from 9 PM to 6 AM.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 PM to 6 AM.
  • From 9 PM to 6 AM, the #3 and #4 (right) lanes on westbound US-50 are planned to be closed from 65th Street to Stockton Blvd.
  • The onramps from 65th Street and 59th Street to westbound US-50 are planned to be closed from 9 PM to 6 AM.

Starting Friday, January 20, the below closures are planned to occur:

  • From 9 PM to 6 AM, the eastbound #3 and #4 lanes are planned to be closed from Howe Avenue to Watt Avenue. 
  • The Howe Avenue on-ramp to eastbound US-50 is planned to be closed from 9 PM to 6 AM.
  • The offramp from eastbound US-50 to Watt Avenue is planned to be closed from 9 PM to 6 AM.
  • From 9 PM to 5 AM, the eastbound #1 and #2 (left) lanes are planned to be closed from 16th Street to 26th Street. 

*Work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

 

January 11, 2023

Starting TONIGHT (Wednesday, 1/11) expect lane and ramp closures along US-50 in Sacramento (weather permitting):

  • From 9 PM to 5 AM, the eastbound #1 and #2 (left) lanes are planned to be closed from Riverside Blvd. to 26th Street.
  • From 9 PM to 5 AM, the westbound #3 and #4 (right) lanes are planned to be closed from 65th Street to Stockton Blvd.
  • From 9 PM to 6 AM, the onramps from 65th Street and 59th Street to westbound US-50 are scheduled to be closed.

On Thursday, 1/12, expect multiple daytime closures from 8:30 AM to 3:30 PM between 18th Street and 34th Street, Stockton Blvd. and Redding Ave. for planned falsework, city street striping and substructure work. 

December 21, 2022

The following closures are anticipated December 21 and 22:

December 21 (subject to change):

  • The westbound and eastbound inside lanes from 65th to 59th Street, as well as the offramp from westbound US-50 to Stockton Boulevard, are planned to be closed from 9 PM to 6 AM.
  • The eastbound inside and outside lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 PM to 6 AM.
  • The westbound US-50 connector ramp to southbound Highway 99 is planned to be closed from 11 PM to 5 AM.

December 22 (subject to change):

  • The westbound and eastbound inside lanes from 65th to 59th Street, as well as the offramp from westbound US-50 to Stockton Boulevard, are planned to be closed from 9 PM to 6 AM.
  • The eastbound inside and outside lanes from Howe Avenue to Watt Avenue are planned to be closed from 9 PM to 6 AM.
  • The westbound US-50 connector ramp to southbound Highway 99 is planned to be closed from 11 PM to 5 AM.
  • The eastbound off-ramp at Hornet Drive will be fully closed from 11 PM to 5 AM.
  • The Folsom Boulevard on- and off-ramps will be fully closed from 11 PM to 5 AM.

December 13, 2022

The Fix50 Highway Enhancement Project is currently underway and has assorted nighttime lane and ramp closures planned from December 13 – 16, 2022*. Crews are scheduled to perform pothole repairs, electrical work, move k-rail, pour concrete and repair signs along EB and WB US-50. Nearby residents can expect loud construction noises as work is underway.

On December 13th, the following closures are scheduled:

    • From 24th Street to 6th Street, the WB outside lanes are planned to be closed from 9 PM to 5 AM.
    • From 65th Street to 51st Street, the WB inside lanes are planned to be closed from 9 PM to 6 AM .
    • The WB US-50 to 16th Street offramp and the WB US-50 to 10th Street offramp are expected to be closed from 9 PM to 6 AM and 11 PM to 6 AM respectively.
    • The Stockton Blvd. onramp to WB US-50 is planned to be closed from 9 PM to 6 AM.
    • The 65th Street onramps to EB US-50 are planned to be closed from 9 PM to 6 AM.
    • From 59th Street to 65th Street, the #1 (left) lane on EB US-50 is planned to be closed from 9 PM to 5 AM.
    • The Howe Ave onramps to EB US-50 are anticipated to be closed from 9PM to 5AM.

On December 14th, the following closures are anticipated:

    • The WB US-50 offramp to Stockton Blvd. is planned to be closed from 9 PM to 6 AM.
    • From 59th Street to 65th Street, the EB #1 (left) lane is planned to be closed from 9 PM to 5 AM.
    • From Howe Avenue to Watt Avenue, the EB left lanes are planned to be closed from 9 PM to 5 AM.
    • The Howe Ave onramps to EB US-50 are anticipated to be closed from 9 PM to 5 AM.
    • From 6th Street to 15th Street, the EB left lanes are planned to be closed from 11PM to 5AM.
    • From 59th Street to Stockton Blvd., the westbound #3 and #4 (right) lanes are planned to be closed from 9 PM to 6 AM.
    • At Hornet Drive, the westbound #1 and #2 (left) lanes are planned to be closed from 11 PM to 6 AM.
    • The EB US-50 offramp to Hornet Drive is planned to be closed from 11 PM to 1 AM.

On December 15th and 16th, the following closures are anticipated:

    • From Howe Avenue to Watt Avenue, the EB #1 and #2 (left) lanes are planned to be closed from 9 PM to 5 AM.
    • The Howe Avenue onramps to EB US-50 are planned to be closed from 9 PM to 5 AM.
    • From Stockton Blvd. to 65th Street, the eastbound #3 and #4 (right) lanes are planned to be closed from 9 PM to 6 AM.

*Work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

December 5, 2022

Weather permitting, expect nighttime lane and ramp closures throughout this week (12/5 – 12/9) from 9PM to 6AM along eastbound and westbound US-50. Closures are planned to include:

  • EB #1 and #2 lanes from Stockton Blvd. to 65th Street
  • WB #1 and #2 lanes from 65th St. to Stockton Blvd
  • WB US-50 to Stockton Blvd. off-ramp

November 30, 2022

Starting tonight, 11/30, at 9 PM through tomorrow, 12/1, at 6 AM, lane and ramp closures are planned on EB and WB US-50. Scheduled closures include:

  • Howe Avenue to WB US-50 on-ramp
  • WB #4 (outside) lane at Howe Avenue
  • Howe Avenue to EB US-50 on-ramp
  • WB US-50 to Stockton Blvd. off-ramp

Expect lane closures in the #1 and #2 EB and WB US-50 lanes from Stockton Blvd. to 65th Street from 9 PM to 6 AM throughout this week.

Demolition work is planned to continue throughout the week; residents can expect loud construction noises from 9 PM – 6 AM.

November 29, 2022

Starting 9 PM tonight, 11/29, through 6 AM tomorrow, 11/30, the EB US-50 onramp from NB 65th Street and WB US-50 off-ramp to Stockton Blvd. are planned to be CLOSED.

Expect lane closures in the #1 and #2 EB and WB US-50 lanes from Stockton Blvd. to 65th Street from 9 PM to 6 AM this week.

Demolition work is planned to continue throughout the week; residents can expect loud construction noises from 9 PM – 6 AM.

November 21, 2022

Starting tonight, November 21, at 10 p.m. through November 22 at 5 a.m., the Northbound I-5 connector ramp to Westbound US-50 is scheduled to be CLOSED for k-rail removal. 

November 18, 2022

Starting tonight (November 18) at 12 a.m. through November 19 at 6 a.m., the Westbound US-50 to Northbound I-5 connector ramp is scheduled to be CLOSED. 

November 17, 2022

Starting tonight at 12 a.m. through November 18 at 5 a.m., the Westbound US-50 to Northbound I-5 connector ramp is scheduled to be CLOSED. 

November 16, 2022

Starting at 9 p.m. on Wednesday, November 16, the Eastbound US-50 to Northbound I-5 connector is scheduled to close to accommodate joint seal repair work. The connector is planned to reopen at 6 a.m. on Thursday, November 17.

November 3, 2022

Starting at 11 p.m. on Thursday, November 3, the number one (left) lane is scheduled to be closed on Eastbound US-50 between 18th Street and 26th Street. The lane is planned to reopen at 7 a.m. on Friday, November 4. 

October 31, 2022

The California Department of Transportation (Caltrans) is scheduling overnight lane closures for the U.S. Highway 50 Corridor Enhancement “Fix50” Project this week lasting into the early morning hours.

This will include nightly demolition work. Nearby residents may hear loud construction noise including backup truck beeping, heavy equipment lifts and tractor cement removal.

Motorists traveling on Highway 50 should expect delays and plan for additional travel time in both directions.

Caltrans suggests using State Route 51 (Capital City Freeway/ Business 80) and/or Interstate 80 as alternate routes.

SCHEDULE AND LOCATIONS:

  • MONDAY 10/31 – FRIDAY 11/4, Nightly 8 p.m. to 6 a.m.: Median barrier demolition work will continue from Stockton Blvd. to 65th St.

October 25, 2022

The California Department of Transportation (Caltrans) is scheduling overnight lane closures for the U.S. Highway 50 Corridor Enhancement “Fix50” Project this week over the next three evenings lasting into the early morning hours. This will include loud construction demolition work beginning Sunday night, October 30.

SCHEDULE AND LOCATIONS:

• Tuesday, 10/25, 8 p.m. to 6 a.m.: The eastbound #3 and 4 lanes will be shifted to right shoulder.
• Wednesday, 10/26, 8 p.m. to 6 a.m.: The eastbound #1 and 2 lanes will be shifted right.
• Sunday, 10/30, 8 p.m. to 6 a.m.: Median barrier demolition work is scheduled to begin from Stockton Blvd. to 65th St.

Motorists traveling on Highway 50 should expect delays and plan for additional travel time on in both directions.
Caltrans suggests using State Route 51 (Capital City Freeway/ Business 80) and/or Interstate 80 as alternate routes.

Crews are working around the clock so please Be Work Zone Alert because someone’s loved one is at work. CHP will be patrolling the area and issuing citations to vehicles traveling over 55 MPH in the work zone. The speed limit on westbound and eastbound US-50 from the I-5 Interchange to Watt Avenue is 55 MPH 24 hours, 7 days a week.

October 18, 2022

Expect loud construction noises throughout the week.

Crews are continuing demolition work between 19th Street and 20th Street. Expect loud construction noises from 9 PM – 6 AM.

The following on and off-ramps are scheduled to be closed along U.S. Highway 50 during the week of October 17 from 9 PM – 6 AM:

  • Exit 7 (The off-ramp from westbound US-50 to Stockton Boulevard).
  • The on-ramp from Stockton Boulevard to eastbound US-50. 
  • Exit 8A (The off-ramp from eastbound US-50 to 59th Street).
  • Exit 8B (The off-ramp from eastbound US-50 to 65th Street).

August 9, 2022

The 59th Street off-ramp (Exit 8A) along eastbound U.S. Highway 50 is scheduled to be CLOSED beginning 8 PM, Friday, August 12, 2022, until 6 AM, Monday, August 15, 2022.

June 27, 2022

Crews moved k-rail to prepare for a traffic split on eastbound U.S. Highway 50 from Stockton Blvdto 65th St. Drivers taking the 59th St. Exit or 65th St. Exit will need to stay in the right lane. Otherwise, use the two left lanes.

Expect delays this week on eastbound US-50 from Stockton Blvd. to 65th Street as crews continue construction activities. The right lanes & multiple ramps (including 59th St. Exit and 65th St. Exit) are scheduled to be CLOSED from 9 PM to 6 AM, Sunday through Thursday. Residents expect loud construction noises.

June 22, 2022

Crews moved k-rail to prepare for a traffic split on eastbound U.S. Highway 50 from Stockton Blvd. to 65th St. Drivers taking the 59th St. Exit or 65th St. Exit will need to stay in the right lane. Otherwise, use the two leftmost lanes.

May 24, 2022

Expect delays this week on westbound U.S. Highway 50 from Stockton Blvd. to 65th St. due to crews moving k-rail & performing striping operation. The #3. (middle-right) & 4 (right) lanes & multiple ramps are scheduled to be CLOSED from 9 PM to 6 AM.

May 10, 2022

Crews are scheduled to perform demolition work from Thursday, May 5th to Thursday, May 12th along U.S. Highway 50 at Howe Avenue and Watt Avenue in Sacramento. Work is scheduled to occur between 8 PM to 5 AM. Crews are performing the demolition work in the median at night due to safety. [Traffic volumes are lower at night (8 PM to 5 AM) allowing the contractor’s trucks to go in and out of the median as needed which would be unsafe to do during high traffic volume hours (5 AM to 8 PM).]

For safety, crews will be requiring extra lighting to perform the night work.

Expect loud construction noises.

May 9, 2022

Extension: Crews are scheduled to intermittently perform demolition work from Thursday, May 5 to Thursday, May 12 along US-50 at Howe Avenue and Watt Avenue. Work is anticipated to occur between 10 PM – 5 AM. Expect loud construction noises during the day and as work is underway.

Weather permitting, traffic breaks are scheduled from 12:30 AM – 5 AM on Tuesday, 5/10, on US-50 at Stockton Blvd. for sign removal.

May 5, 2022

Crews are scheduled to intermittently perform demolition work from Thursday, May 5 to Monday, May 9 along US-50 at Howe Avenue and Watt Avenue. Work is anticipated to occur between 10 PM – 5 AM. Expect loud construction noises as work is underway.

May 1, 2022

The #1 (left) lane closure on Eastbound U.S. Highway 50 from 6th Street to 26th Street scheduled for Monday, 5/2, is POSTPONED. Check back soon for updates.

April 29, 2022

35th Street is closed from the Stockton Boulevard off-ramp due to construction activities for the Fix50 Highway Enhancement Project. 35th Street is scheduled to reopen early 2023.

April 11, 2022

From 5AM to 11 AM on Monday, April 11, the #1 (left) lane will be closed from 6th Street to 26th Street for pavement work.

 

 

 

 

November 14, 2024       

Tonight, November 14through the end of the week, construction is scheduled to continue along US-50 in Sacramento.       

ALERT: As of 11/06/2024, the long-term closure of westbound US-50 at 65th Street has been POSTPONED. Work will be rescheduled to a future date, to be determined. 

The following lanes and ramps are also scheduled to be CLOSED this week:                  

Nighttime Work (9 PM – 5 AM) 

Thursday, November 14

  • Westbound Watt Ave. on and offramps
  • Westbound #3 and #4 lanes from Bradshaw to Occidental overcrossing
  • Eastbound #3 and #4 lanes from the Occidental overcrossing to Watt Ave. onramp
  • Eastbound Watt Ave. offramp (#2 lane)
  • Westbound #4 and auxiliary lanes under Occidental overcrossing
  • Eastbound #3 and #4 lanes from 48th Street overcrossing to 59th Street offramp
  • Eastbound 59th Street offramp
  • T Street under US-50
  • Eastbound #1 and #2 lanes from 6th Street to 26th Street
  • Westbound #1 and #2 lanes from 26th Street to 6th Street
  • Westbound 16th Street offramp
  • Connector ramp from SB-51 (Bus. I-80) to westbound US-50
  • Connector ramp from northbound SR-99 to westbound US-50
  • Westbound #1 and #2 lanes from Stockton Blvd. to 26th Street
  • Westbound #3 and #4 lanes from Howe Ave. to 59th Street
  • Westbound Howe Ave. onramp
  • Westbound 65th Street offramp
  • Eastbound Howe Ave. onramp
  • Eastbound #3 and #4 lanes from Howe Ave. to Watt Ave.

Friday, November 15

  • Eastbound #1 and #2 lanes from 6th Street to 26th Street
  • Westbound #1 and #2 lanes from 26th Street to 6th Street

*All work is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.    

 

October 26, 2021:

15th Street Full Closure – 8:30 AM to 3:30 PM 10/27 – 10/29

Stockton Blvd – SB outside lane – 8:30 AM to 3:30 PM 10/28 – 10/29

Riverside Blvd – Full Closure – 8:30 AM to 3:30 PM 10/27

26th Street – Full Closure – 8:30 AM to 3:30 PM on 10/27

24th Street – Full Closure – 8:30 AM to 3:30 PM 10/27

6th Street – Full Closure – 8:30 AM to 3:30 PM 10/27

October 18, 2021:

Monday, October 18 from 8:30 AM – 3:30 PM, 15th Street and 9th Street are planned to be closed for construction activities. S Street between 49th Street & 50th Street is scheduled to be partially closed from 7:00 AM to 3:30 PM.

22nd Street is planned to be closed from Monday, October 18 to Friday, October 22, 8:30 AM – 3:30 PM.

T Street between 59th Street & 61st Street is planned to be partially closed Tuesday, October 19 from 7:00 AM – 3:30 PM.

Tuesday, October 19, Riverside Boulevard and 26th Street are planned to be closed from 8:30 AM – 3:30 PM.

October 11, 2021:

Street closures are tentatively planned to take place at 21st, 22nd, 23rd, and 24th Street this week for construction activity.

Piledriving in the Elmhurst area will continue this week from 9 PM – 5 AM, specifically around the 34th area. Residents should expect loud noises as work is in progress for the next three weeks.

15th and 16th Street will alternately be closed during the day from 6 AM – 5 PM for underground work this week.

Demo work is scheduled to take place around the Redding Avenue area this week.

Crews are working along and on US-50 from I-5 Interchange to Watt Avenue around the clock.

Loud construction is taking place at Howe Avenue/Hornet Drive to Watt Avenue, from 7 AM to 5 PM daily. Work is planned to continue for the next three weeks.

K-rail installation is underway to complete the traffic split on eastbound US-50 between Howe Avenue to Watt Avenue. Motorists traveling on eastbound US-50 should stay in the two right lanes before the split to take the Watt Avenue exit.

Crews are also scheduled to work during the day and night to construct the NEW sound wall on the south side of U.S. Highway 50 from Stockton Boulevard to 65th Street in Sacramento.

Flatiron Construction and its partners continue to install the blocks to build the sound wall along US-50 from 51st Street to 59th Street. The height of this section of the sound wall is about 10 feet to 12 feet.  Crews will continue to work on the sound wall and drainage systems throughout the summer.

In addition, crews continue to perform piledriving & other construction activities on/under U.S. Highway 50 between W & X Streets from 6th Street to 26th Street in Sacramento.

October 1, 2021:

Crews are working along and on US-50 from I-5 Interchange to Watt Avenue around the clock.

Loud construction is taking place at Howe Avenue/Hornet Drive to Watt Avenue, from 7 AM to 5 PM daily. Work is planned to continue for the next three weeks.

Nighttime demolition work, from 11 PM to 5 AM, is taking place in the Elmhurst Area. Residents should expect loud noises as work is in progress for the next three weeks.

K-rail installation is underway to complete the traffic split on eastbound US-50 between Howe Avenue to Watt Avenue. Motorists traveling on eastbound US-50 should stay in the two right lanes before the split to take the Watt Avenue exit.

August 20, 2021:

Caltrans, Flatiron Construction and its partners are scheduled to begin demolition work on the Elmhurst Viaduct in Sacramento beginning Monday, August 23rd from 9 PM to 5 AM (nightly).

Below is a list of city streets that are scheduled to be closed due to the work for the Fix50 Highway Enhancement Project:

Monday, August 23rd – Wednesday, August 25th

34th Street is scheduled to be CLOSED between T Street & Trio Lane from 9:00 PM to 5:00 AM (nightly).

Tuesday, August 24th – Thursday, August 26th

T Street is scheduled to be CLOSED between 34th Street & 35th Street from 9:00 PM to 5:00 AM (nightly).

Monday, August 30th – Tuesday, August 31st

35th Street is scheduled to be CLOSED between T Street & Stockton Boulevard from 9:00 PM to 5:00 AM (nightly).

The street closures are necessary due to the type of work crews are performing, and for the safety of workers and motorists. This type of work requires lane closures on the state highway system and city streets; therefore, the work is being performed at night.

 

August 10, 2021:

Starting August 12 through August 18, Folsom Boulevard at US-50 will be closed nightly from 9 PM to 5 AM for bridge demolition work. Expect loud noises & other construction activities.

Hornet Dr. planned to be closed on August 10 from 9 PM to 5 AM for bridge demolition. Expect loud noises.

26th Street will be closed from Friday, July 30 to Wednesday, August 4 between W & X Streets from 7 AM – 3 PM for bridge demolition & other construction activities.

Westbound T Street is planned to be closed from Monday, August 2 to Friday, August 6 at 55th Street to 59th Street and 59th Street to 62nd Street for sound wall construction. Closure will take place from 8:30 AM – 3:30 PM.

The 34th Street off-ramp closure from eastbound US-50 has been postponed.  

39th Street is planned to be closed between the Light Rail tracks by R and S Streets starting Wednesday, August 4 through Friday, August 6 from 7 AM – 3 PM.

July 26, 2021:

Riverside Blvd. & 10th St. between W & X Streets are scheduled to be CLOSED Monday, 7/26, from 8:30 AM to 3:30 PM for demolition & construction activities.

July 22, 2021:

Riverside Boulevard is CLOSED from Thursday, 7/22 – Friday, 7/23 & Monday, 7/26, from 8:30 AM to 2:30 for bridge demolition work & other construction activities.

July 20, 2021:

15th Street is CLOSED at W & X Streets from  Tuesday, 7/20 – Wednesday, 7/21 from 8:30 AM to 3:30 PM for bridge demolition work & other construction activities.

July 19, 2021: 

16th Street is CLOSED between W & X Streets from Monday, 7/19 – Tuesday, 7/20 from 8:30 AM to 3:30 PM for bridge demolition work & other construction activities.

July 6, 2021:

Crews are performing piledriving & other construction activities for the next two weeks on/under U.S. Highway 50 between W & X Streets from 6th Street to 26th Street in Sacramento.

Due to extreme heat, crews are scheduled to begin daytime work at 6 a.m. Expect loud construction noises at various times during the day & night as work is underway.

Work Schedule (Subject to Change):

Day work from 6:00 a.m. – 5:00 p.m.*

Night work from 8:00 p.m. – 6:00 a.m.*

Crews are currently working day and night to construct the NEW sound wall on the south side of U.S. Highway 50 from Stockton Boulevard to 65th Street in Sacramento.

This week Flatiron Construction and its partners have been installing the blocks to build the sound wall along US-50 from 51st Street to 59th Street. The height of this section of the sound wall is about 10 feet to 12 feet.  Crews will continue to work on the sound wall and drainage systems throughout the summer.

June 23, 2021: Full Highway Closure to Remove Overhead Signs

All westbound lanes are scheduled to be closed Thursday, June 24, from 12:01 a.m. until 4:00 a.m., however, crews are scheduled to start closing lanes at 9:00 p.m., Wednesday, June 23 to prepare for the work.

Crews are also scheduled to start closing the westbound lanes at 9:00 p.m., Thursday, June 24, and all westbound lanes are scheduled to be closed Friday, June 25, from 12:01 a.m. until 4:00 a.m.

Work to remove the overhead signs is scheduled to resume the night of Sunday, June 27, beginning at 9:00 p.m.; however, the full highway closure is scheduled to begin Monday, June 28, from 12:01 a.m. until 4:00 a.m.

During the full highway closure, the connector ramp from northbound SR-99 to westbound US-50 will be closed, and the connector ramp from southbound Business 80 (Capital City Freeway/ SR-51) to westbound US-50 are scheduled to be closed.

Please plan ahead, expect delays and use I-5 as an alternate route or consider alternative methods of transportation.

Crews are also scheduled to start closing lanes on eastbound US-50 from the I-5 Interchange to the connector ramps at SR-99 and Business 80 (Capital City Freeway/ SR-51) beginning 9:00 p.m., Monday, June 28. All lanes are scheduled to be closed Tuesday, June 29, from 12:01 a.m. until 4:00 a.m.

 

Work is scheduled to resume 9:00 p.m., Tuesday, June 29, and all eastbound lanes are scheduled to be closed Wednesday, June 30, from 12:01 a.m. until 4:00 a.m.

 

Crews will once again start closing lanes on eastbound US-50 beginning 9:00 p.m., Wednesday, June 30, and all lanes are scheduled to be closed Thursday, July 1, from 12:01 a.m. until 4:00 a.m.

 

During the full highway closure on eastbound US-50, the connector ramps from northbound I-5 to eastbound US-50, and eastbound US-50 to northbound I-5 are scheduled to be closed.

Motorists are encouraged to follow the signed detour.

June 9, 2021: 

Current night work is to remove concrete pavement for the retaining wall construction. Work will continue tonight, June 9, but starting tomorrow (Thursday, June 10) it will shift to an afternoon – evening timeframe.

The foundation work for the sound walls is progressing during the day.  The concrete block to build the actual walls has been delayed due to a shortage related to COVID, but we hope to begin placing the block by the end of the month.

Nearby residents should expect loud construction noises from evening into the early morning hours.

No work will be done on U.S.50 from Friday, June 11 through Wednesday, June 16 due to the State Highway 99 four-day full closure.

State Highway 99 is scheduled to be closed NB and SB from 47th Avenue to the U.S. Highway 50 Connector. The closure is scheduled to begin 8:00 p.m., Friday, June 11, until 4:00 a.m., Wednesday, June 16.

May 26, 2021 – 

Crews will be demolishing the bridge overhang and barrier rail at 22nd and 23rd Streets between W and X Streets from 8:30 a.m. to 3:30 p.m. on Thursday, May 27th.

Night work is still scheduled from 8:00 p.m. to 6:00 a.m.

Expect loud noises and avoid the work zone.

May 20, 2021 –

Demolition work for the Fix50 Highway Enhancement Project began Monday, May 17th. Expect loud construction noises at various times during the day & night for the next two months. Crews are performing demolition work & other construction activities on/ under U.S. Highway 50 between W & X Streets from 6th Street to 26th Street in Sacramento.

Work Schedule (Subject to Change):

Day work from 8:30 a.m. – 3:30 p.m.*

Night work from 8:00 p.m. – 6:00 a.m.*